blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3521118

EP3521118 - ELECTROMECHANICAL ACTUATOR PACKAGE WITH MULTI-STAGE BELT DRIVE MECHANISM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.10.2021
Database last updated on 12.07.2024
FormerThe patent has been granted
Status updated on  30.10.2020
FormerGrant of patent is intended
Status updated on  25.06.2020
FormerRequest for examination was made
Status updated on  14.02.2020
FormerThe application has been published
Status updated on  05.07.2019
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
Mando Corporation
343-1 Manho-ri
Poseung-myeon
Pyeongtaek-si
Gyeonggi-do 451-821 / KR
[2019/32]
Inventor(s)01 / ROSS, Kevin
3475 S. Brennan Rd.
Hemlock, MI 48626 / US
02 / STRIETER, Troy
448 S 4th St.
Sebewaing, MI 48759 / US
03 / GROVE, Joshua
766 N. Nine Mile Rd.
Sanford, MI 48657 / US
 [2019/32]
Representative(s)Pfenning, Meinig & Partner mbB
Patent- und Rechtsanwälte
Joachimsthaler Straße 10-12
10719 Berlin / DE
[2019/32]
Application number, filing date19155421.105.02.2019
[2019/32]
Priority number, dateUS201862627114P06.02.2018         Original published format: US 201862627114 P
US20181611843731.08.2018         Original published format: US201816118437
[2019/32]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3521118
Date:07.08.2019
Language:EN
[2019/32]
Type: B1 Patent specification 
No.:EP3521118
Date:02.12.2020
Language:EN
[2020/49]
Search report(s)(Supplementary) European search report - dispatched on:EP13.05.2019
ClassificationIPC:B60T13/74
[2019/32]
CPC:
B60T13/746 (EP,US); F16D65/18 (KR); F16D65/16 (US);
F16D2121/24 (EP,KR,US); F16D2125/48 (US); F16H7/02 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/12]
Former [2019/32]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ELEKTROMECHANISCHES AKTUATORPAKET MIT MEHRSTUFIGEM RIEMENANTRIEBSMECHANISMUS[2019/32]
English:ELECTROMECHANICAL ACTUATOR PACKAGE WITH MULTI-STAGE BELT DRIVE MECHANISM[2019/32]
French:PACKAGE D'ACTIONNEUR ÉLECTROMÉCANIQUE AVEC MÉCANISME D'ENTRAÎNEMENT DE COURROIE À PLUSIEURS ÉTAGES[2019/32]
Examination procedure07.02.2020Amendment by applicant (claims and/or description)
07.02.2020Examination requested  [2020/12]
07.02.2020Date on which the examining division has become responsible
26.06.2020Communication of intention to grant the patent
26.10.2020Fee for grant paid
26.10.2020Fee for publishing/printing paid
26.10.2020Receipt of the translation of the claim(s)
Opposition(s)03.09.2021No opposition filed within time limit [2021/45]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU05.02.2019
AL02.12.2020
AT02.12.2020
CY02.12.2020
CZ02.12.2020
DK02.12.2020
EE02.12.2020
ES02.12.2020
FI02.12.2020
HR02.12.2020
IT02.12.2020
LT02.12.2020
LV02.12.2020
MC02.12.2020
MK02.12.2020
NL02.12.2020
PL02.12.2020
RO02.12.2020
RS02.12.2020
SE02.12.2020
SI02.12.2020
SK02.12.2020
SM02.12.2020
IE05.02.2021
LU05.02.2021
BE28.02.2021
FR28.02.2021
BG02.03.2021
NO02.03.2021
GR03.03.2021
IS02.04.2021
PT05.04.2021
[2024/23]
Former [2023/33]HU05.02.2019
AL02.12.2020
AT02.12.2020
CY02.12.2020
CZ02.12.2020
DK02.12.2020
EE02.12.2020
ES02.12.2020
FI02.12.2020
HR02.12.2020
IT02.12.2020
LT02.12.2020
LV02.12.2020
MC02.12.2020
NL02.12.2020
PL02.12.2020
RO02.12.2020
RS02.12.2020
SE02.12.2020
SI02.12.2020
SK02.12.2020
SM02.12.2020
IE05.02.2021
LU05.02.2021
BE28.02.2021
FR28.02.2021
BG02.03.2021
NO02.03.2021
GR03.03.2021
IS02.04.2021
PT05.04.2021
Former [2023/30]AL02.12.2020
AT02.12.2020
CY02.12.2020
CZ02.12.2020
DK02.12.2020
EE02.12.2020
ES02.12.2020
FI02.12.2020
HR02.12.2020
IT02.12.2020
LT02.12.2020
LV02.12.2020
MC02.12.2020
NL02.12.2020
PL02.12.2020
RO02.12.2020
RS02.12.2020
SE02.12.2020
SI02.12.2020
SK02.12.2020
SM02.12.2020
IE05.02.2021
LU05.02.2021
BE28.02.2021
FR28.02.2021
BG02.03.2021
NO02.03.2021
GR03.03.2021
IS02.04.2021
PT05.04.2021
Former [2022/34]AL02.12.2020
AT02.12.2020
CZ02.12.2020
DK02.12.2020
EE02.12.2020
ES02.12.2020
FI02.12.2020
HR02.12.2020
IT02.12.2020
LT02.12.2020
LV02.12.2020
MC02.12.2020
NL02.12.2020
PL02.12.2020
RO02.12.2020
RS02.12.2020
SE02.12.2020
SI02.12.2020
SK02.12.2020
SM02.12.2020
IE05.02.2021
LU05.02.2021
BE28.02.2021
FR28.02.2021
BG02.03.2021
NO02.03.2021
GR03.03.2021
IS02.04.2021
PT05.04.2021
Former [2022/23]AL02.12.2020
AT02.12.2020
CZ02.12.2020
DK02.12.2020
EE02.12.2020
ES02.12.2020
FI02.12.2020
HR02.12.2020
IT02.12.2020
LT02.12.2020
LV02.12.2020
MC02.12.2020
NL02.12.2020
PL02.12.2020
RO02.12.2020
RS02.12.2020
SE02.12.2020
SI02.12.2020
SK02.12.2020
SM02.12.2020
IE05.02.2021
LU05.02.2021
FR28.02.2021
BG02.03.2021
NO02.03.2021
GR03.03.2021
IS02.04.2021
PT05.04.2021
Former [2022/10]AL02.12.2020
AT02.12.2020
CZ02.12.2020
DK02.12.2020
EE02.12.2020
ES02.12.2020
FI02.12.2020
HR02.12.2020
IT02.12.2020
LT02.12.2020
LV02.12.2020
MC02.12.2020
NL02.12.2020
PL02.12.2020
RO02.12.2020
RS02.12.2020
SE02.12.2020
SI02.12.2020
SK02.12.2020
SM02.12.2020
IE05.02.2021
LU05.02.2021
FR28.02.2021
BG02.03.2021
NO02.03.2021
GR03.03.2021
PT05.04.2021
Former [2022/08]AL02.12.2020
AT02.12.2020
CZ02.12.2020
DK02.12.2020
EE02.12.2020
ES02.12.2020
FI02.12.2020
HR02.12.2020
IT02.12.2020
LT02.12.2020
LV02.12.2020
MC02.12.2020
NL02.12.2020
PL02.12.2020
RO02.12.2020
RS02.12.2020
SE02.12.2020
SI02.12.2020
SK02.12.2020
SM02.12.2020
IE05.02.2021
LU05.02.2021
FR28.02.2021
BG02.03.2021
NO02.03.2021
GR03.03.2021
IS02.04.2021
PT05.04.2021
Former [2022/07]AL02.12.2020
AT02.12.2020
CZ02.12.2020
DK02.12.2020
EE02.12.2020
FI02.12.2020
HR02.12.2020
IT02.12.2020
LT02.12.2020
LV02.12.2020
MC02.12.2020
NL02.12.2020
PL02.12.2020
RO02.12.2020
RS02.12.2020
SE02.12.2020
SI02.12.2020
SK02.12.2020
SM02.12.2020
IE05.02.2021
LU05.02.2021
FR28.02.2021
BG02.03.2021
NO02.03.2021
GR03.03.2021
IS02.04.2021
PT05.04.2021
Former [2021/49]AL02.12.2020
AT02.12.2020
CZ02.12.2020
DK02.12.2020
EE02.12.2020
FI02.12.2020
HR02.12.2020
IT02.12.2020
LT02.12.2020
LV02.12.2020
MC02.12.2020
NL02.12.2020
PL02.12.2020
RO02.12.2020
RS02.12.2020
SE02.12.2020
SI02.12.2020
SK02.12.2020
SM02.12.2020
LU05.02.2021
BG02.03.2021
NO02.03.2021
GR03.03.2021
IS02.04.2021
PT05.04.2021
Former [2021/48]AL02.12.2020
AT02.12.2020
CZ02.12.2020
EE02.12.2020
FI02.12.2020
HR02.12.2020
IT02.12.2020
LT02.12.2020
LV02.12.2020
MC02.12.2020
NL02.12.2020
PL02.12.2020
RO02.12.2020
RS02.12.2020
SE02.12.2020
SK02.12.2020
SM02.12.2020
LU05.02.2021
BG02.03.2021
NO02.03.2021
GR03.03.2021
IS02.04.2021
PT05.04.2021
Former [2021/47]AL02.12.2020
AT02.12.2020
CZ02.12.2020
EE02.12.2020
FI02.12.2020
HR02.12.2020
LT02.12.2020
LV02.12.2020
MC02.12.2020
NL02.12.2020
PL02.12.2020
RO02.12.2020
RS02.12.2020
SE02.12.2020
SK02.12.2020
SM02.12.2020
LU05.02.2021
BG02.03.2021
NO02.03.2021
GR03.03.2021
IS02.04.2021
PT05.04.2021
Former [2021/45]AL02.12.2020
AT02.12.2020
CZ02.12.2020
EE02.12.2020
FI02.12.2020
HR02.12.2020
LT02.12.2020
LV02.12.2020
MC02.12.2020
NL02.12.2020
PL02.12.2020
RO02.12.2020
RS02.12.2020
SE02.12.2020
SK02.12.2020
SM02.12.2020
BG02.03.2021
NO02.03.2021
GR03.03.2021
IS02.04.2021
PT05.04.2021
Former [2021/42]AT02.12.2020
CZ02.12.2020
EE02.12.2020
FI02.12.2020
HR02.12.2020
LT02.12.2020
LV02.12.2020
MC02.12.2020
NL02.12.2020
PL02.12.2020
RO02.12.2020
RS02.12.2020
SE02.12.2020
SK02.12.2020
SM02.12.2020
BG02.03.2021
NO02.03.2021
GR03.03.2021
IS02.04.2021
PT05.04.2021
Former [2021/41]AT02.12.2020
CZ02.12.2020
EE02.12.2020
FI02.12.2020
HR02.12.2020
LT02.12.2020
LV02.12.2020
MC02.12.2020
NL02.12.2020
PL02.12.2020
RO02.12.2020
RS02.12.2020
SE02.12.2020
SK02.12.2020
SM02.12.2020
BG02.03.2021
NO02.03.2021
GR03.03.2021
PT05.04.2021
Former [2021/37]AT02.12.2020
CZ02.12.2020
EE02.12.2020
FI02.12.2020
HR02.12.2020
LT02.12.2020
LV02.12.2020
NL02.12.2020
PL02.12.2020
RO02.12.2020
RS02.12.2020
SE02.12.2020
SK02.12.2020
SM02.12.2020
BG02.03.2021
NO02.03.2021
GR03.03.2021
PT05.04.2021
Former [2021/36]CZ02.12.2020
EE02.12.2020
FI02.12.2020
HR02.12.2020
LT02.12.2020
LV02.12.2020
NL02.12.2020
PL02.12.2020
RO02.12.2020
RS02.12.2020
SE02.12.2020
SK02.12.2020
SM02.12.2020
BG02.03.2021
NO02.03.2021
GR03.03.2021
PT05.04.2021
Former [2021/35]CZ02.12.2020
FI02.12.2020
HR02.12.2020
LT02.12.2020
LV02.12.2020
NL02.12.2020
PL02.12.2020
RO02.12.2020
RS02.12.2020
SE02.12.2020
SK02.12.2020
SM02.12.2020
BG02.03.2021
NO02.03.2021
GR03.03.2021
PT05.04.2021
Former [2021/33]FI02.12.2020
HR02.12.2020
LT02.12.2020
LV02.12.2020
NL02.12.2020
PL02.12.2020
RS02.12.2020
SE02.12.2020
SM02.12.2020
BG02.03.2021
NO02.03.2021
GR03.03.2021
PT05.04.2021
Former [2021/32]FI02.12.2020
HR02.12.2020
LV02.12.2020
NL02.12.2020
PL02.12.2020
RS02.12.2020
SE02.12.2020
SM02.12.2020
BG02.03.2021
NO02.03.2021
GR03.03.2021
Former [2021/30]FI02.12.2020
HR02.12.2020
LV02.12.2020
NL02.12.2020
PL02.12.2020
RS02.12.2020
SE02.12.2020
BG02.03.2021
NO02.03.2021
GR03.03.2021
Former [2021/28]FI02.12.2020
HR02.12.2020
LV02.12.2020
PL02.12.2020
RS02.12.2020
SE02.12.2020
BG02.03.2021
NO02.03.2021
GR03.03.2021
Former [2021/25]FI02.12.2020
LV02.12.2020
PL02.12.2020
RS02.12.2020
SE02.12.2020
BG02.03.2021
NO02.03.2021
GR03.03.2021
Former [2021/24]FI02.12.2020
LV02.12.2020
RS02.12.2020
SE02.12.2020
BG02.03.2021
NO02.03.2021
GR03.03.2021
Former [2021/23]FI02.12.2020
LV02.12.2020
RS02.12.2020
SE02.12.2020
NO02.03.2021
GR03.03.2021
Former [2021/22]FI02.12.2020
RS02.12.2020
NO02.03.2021
Former [2021/20]FI02.12.2020
Documents cited:Search[IAY]JPH01285233  (TOKYO ELECTRIC CO LTD);
 [A]WO2004044445  (STONERIDGE CONTROL DEVICES INC [US]);
 [A]DE102004012355  (CONTINENTAL TEVES AG & CO OHG [DE]);
 [Y]US2007063603  (LEVINE GREGORY M [US], et al);
 [Y]CN203509739U  (ZHEJIANG BETTN MACHINERY MFG CO LTD)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.