EP3594499 - LINEAR COMPRESSOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.06.2021 Database last updated on 17.05.2024 | |
Former | The patent has been granted Status updated on 03.07.2020 | ||
Former | Grant of patent is intended Status updated on 16.02.2020 | ||
Former | Request for examination was made Status updated on 13.12.2019 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states LG Electronics Inc. 128 Yeoui-daero Yeongdeungpo-Gu 07336 SEOUL / KR | [2020/03] | Inventor(s) | 01 /
KIM, Hyunsoo LG Electronics Inc., IP Center 51, Gasan digital 1-ro, Geumcheon-gu 08592 Seoul / KR | 02 /
BAE, Sangeun LG Electronics Inc., IP Center 51, Gasan digital 1-ro, Geumcheon-gu 08592 Seoul / KR | 03 /
YU, Yunhyeok LG Electronics Inc., IP Center 51, Gasan digital 1-ro, Geumcheon-gu 08592 Seoul / KR | [2020/03] | Representative(s) | Vossius & Partner Patentanwälte Rechtsanwälte mbB Siebertstrasse 3 81675 München / DE | [2020/03] | Application number, filing date | 19155512.7 | 05.02.2019 | [2020/03] | Priority number, date | KR20180081911 | 13.07.2018 Original published format: KR 20180081911 | [2020/03] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3594499 | Date: | 15.01.2020 | Language: | EN | [2020/03] | Type: | B1 Patent specification | No.: | EP3594499 | Date: | 05.08.2020 | Language: | EN | [2020/32] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 28.05.2019 | Classification | IPC: | F04B35/04, F04B39/00, F04B39/12 | [2020/03] | CPC: |
F04B39/0044 (EP,CN,KR,US);
F04B35/04 (KR);
F04B19/04 (US);
F04B35/045 (EP,US);
F04B39/121 (EP,CN);
F04B39/127 (US);
F04B53/003 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/05] |
Former [2020/03] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | LINEARVERDICHTER | [2020/03] | English: | LINEAR COMPRESSOR | [2020/03] | French: | COMPRESSEUR LINÉAIRE | [2020/03] | Examination procedure | 05.03.2019 | Examination requested [2020/03] | 19.12.2019 | Amendment by applicant (claims and/or description) | 17.02.2020 | Communication of intention to grant the patent | 23.06.2020 | Fee for grant paid | 23.06.2020 | Fee for publishing/printing paid | 23.06.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 07.05.2021 | No opposition filed within time limit [2021/28] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.02.2019 | AL | 05.08.2020 | AT | 05.08.2020 | CY | 05.08.2020 | CZ | 05.08.2020 | DK | 05.08.2020 | EE | 05.08.2020 | ES | 05.08.2020 | FI | 05.08.2020 | HR | 05.08.2020 | LT | 05.08.2020 | LV | 05.08.2020 | MC | 05.08.2020 | MK | 05.08.2020 | NL | 05.08.2020 | PL | 05.08.2020 | RO | 05.08.2020 | RS | 05.08.2020 | SE | 05.08.2020 | SI | 05.08.2020 | SK | 05.08.2020 | SM | 05.08.2020 | BG | 05.11.2020 | NO | 05.11.2020 | GR | 06.11.2020 | IS | 05.12.2020 | PT | 07.12.2020 | IE | 05.02.2021 | LU | 05.02.2021 | BE | 28.02.2021 | FR | 28.02.2021 | [2024/23] |
Former [2023/41] | HU | 05.02.2019 | |
AL | 05.08.2020 | ||
AT | 05.08.2020 | ||
CY | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
IE | 05.02.2021 | ||
LU | 05.02.2021 | ||
BE | 28.02.2021 | ||
FR | 28.02.2021 | ||
Former [2023/33] | HU | 05.02.2019 | |
AL | 05.08.2020 | ||
AT | 05.08.2020 | ||
CY | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
IE | 05.02.2021 | ||
LU | 05.02.2021 | ||
BE | 28.02.2021 | ||
FR | 28.02.2021 | ||
Former [2023/30] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CY | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
IE | 05.02.2021 | ||
LU | 05.02.2021 | ||
BE | 28.02.2021 | ||
FR | 28.02.2021 | ||
Former [2022/34] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
IE | 05.02.2021 | ||
LU | 05.02.2021 | ||
BE | 28.02.2021 | ||
FR | 28.02.2021 | ||
Former [2022/07] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
IE | 05.02.2021 | ||
LU | 05.02.2021 | ||
FR | 28.02.2021 | ||
Former [2021/47] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
LU | 05.02.2021 | ||
Former [2021/41] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/28] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/25] | AL | 05.08.2020 | |
AT | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/22] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/21] | AT | 05.08.2020 | |
DK | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/12] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/10] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
PL | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/09] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
LT | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
PT | 07.12.2020 | ||
Former [2021/08] | ES | 05.08.2020 | |
FI | 05.08.2020 | ||
LT | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
PT | 07.12.2020 | ||
Former [2021/07] | FI | 05.08.2020 | |
LT | 05.08.2020 | ||
NO | 05.11.2020 | Documents cited: | Search | [A]JPS58187589 (MATSUSHITA ELECTRIC IND CO LTD) [A] 1-15 * figures 1-4 * * paragraph [0001] *; | [A]DE19651624 (LG ELECTRONICS INC [KR]) [A] 1-15* figures 1-9 *; | [IA]US6092999 (LILIE DIETMAR ERICH BERNHARD [BR], et al) [I] 1,3 * figures 1-3 * * column 2, line 22 - column 4, line 30 * [A] 2,4-15; | [XAI]EP2975267 (LG ELECTRONICS INC [KR]) [X] 1,2,14 * figures 3-7 * * paragraph [0028] - paragraph [0073] * [A] 10-12 [I] 3-9,13,15; | [A]EP3242026 (LG ELECTRONICS INC [KR]) [A] 1-15 * figures 1-4,6,8-12 * | by applicant | KR20160000403 |