EP3528531 - TRANSMISSION SIGNAL STRENGTH ADAPTATION OF A BLUETOOTH CONNECTION BETWEEN TWO COMMUNICATION APPARATUSES BASED ON A NON-CONTINUOUS CHANGE OF COMMUNICATION STATE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.02.2022 Database last updated on 28.05.2024 | |
Former | The patent has been granted Status updated on 19.02.2021 | ||
Former | Grant of patent is intended Status updated on 12.10.2020 | ||
Former | Request for examination was made Status updated on 19.07.2019 | Most recent event Tooltip | 17.05.2024 | Lapse of the patent in a contracting state New state(s): HU | published on 19.06.2024 [2024/25] | Applicant(s) | For all designated states Casio Computer Co., Ltd. 6-2, Hon-machi 1-chome Shibuya-ku Tokyo 151-8543 / JP | [2019/34] | Inventor(s) | 01 /
OKUMURA, Ryo c/o Casio Computer Co., Ltd. Hamura R&D Center 2-1, Sakae-cho 3-chome, Hamura-shi Tokyo, 205-8555 / JP | 02 /
TOMIDA, Takahiro c/o Casio Computer Co., Ltd. Hamura R&D Center 2-1, Sakae-cho 3-chome, Hamura-shi Tokyo, 205-8555 / JP | 03 /
TERAZAKI, Tsutomu c/o Casio Computer Co., Ltd. Hamura R&D Center 2-1, Sakae-cho 3-chome, Hamura-shi Tokyo, 205-8555 / JP | 04 /
TAKAHASHI, Toshihiro c/o Casio Computer Co., Ltd. Hamura R&D Center 2-1, Sakae-cho 3-chome, Hamura-shi Tokyo, 205-8555 / JP | [2019/34] | Representative(s) | Plougmann Vingtoft a/s Strandvejen 70 2900 Hellerup / DK | [2019/34] | Application number, filing date | 19157092.8 | 14.02.2019 | [2019/34] | Priority number, date | JP20180025590 | 16.02.2018 Original published format: JP 2018025590 | [2019/34] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3528531 | Date: | 21.08.2019 | Language: | EN | [2019/34] | Type: | B1 Patent specification | No.: | EP3528531 | Date: | 24.03.2021 | Language: | EN | [2021/12] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 17.06.2019 | Classification | IPC: | H04M1/725, H04W24/10 | [2020/45] | CPC: |
H04W24/10 (EP,US);
H04W4/80 (CN,US);
G08C17/02 (CN);
H04B17/318 (US);
H04M1/72412 (EP,US);
H04W4/38 (CN,US);
H04W52/0209 (CN,US);
H04W52/0245 (CN);
H04W52/0248 (CN);
H04W52/0251 (CN);
H04W76/14 (US);
H04M1/72454 (EP,US);
H04M2250/02 (EP,US)
(-)
|
Former IPC [2019/34] | H04W24/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/34] | Title | German: | ÜBERTRAGUNGSSIGNALSTÄRKEANPASSUNG EINER BLUETOOTH-VERBINDUNG ZWISCHEN ZWEI KOMMUNIKATIONSGERÄTEN BASIEREND AUF EINER NICHT KONTINUIERLICHEN ÄNDERUNG DES KOMMUNIKATIONSZUSTANDES | [2019/34] | English: | TRANSMISSION SIGNAL STRENGTH ADAPTATION OF A BLUETOOTH CONNECTION BETWEEN TWO COMMUNICATION APPARATUSES BASED ON A NON-CONTINUOUS CHANGE OF COMMUNICATION STATE | [2019/34] | French: | ADAPTATION DE L'INTENSITÉ DU SIGNAL DE TRANSMISSION D'UNE CONNEXION BLUETOOTH ENTRE DEUX APPAREILS DE COMMUNICATION BASÉE SUR UN CHANGEMENT NON CONTINU D'ÉTAT DE COMMUNICATION | [2019/34] | Examination procedure | 14.02.2019 | Examination requested [2019/34] | 19.02.2020 | Amendment by applicant (claims and/or description) | 13.10.2020 | Communication of intention to grant the patent | 12.02.2021 | Fee for grant paid | 12.02.2021 | Fee for publishing/printing paid | 12.02.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 04.01.2022 | No opposition filed within time limit [2022/10] | Fees paid | Renewal fee | 12.02.2021 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.02.2019 | AL | 24.03.2021 | AT | 24.03.2021 | CY | 24.03.2021 | CZ | 24.03.2021 | DK | 24.03.2021 | EE | 24.03.2021 | ES | 24.03.2021 | FI | 24.03.2021 | HR | 24.03.2021 | IT | 24.03.2021 | LT | 24.03.2021 | LV | 24.03.2021 | MC | 24.03.2021 | MK | 24.03.2021 | NL | 24.03.2021 | PL | 24.03.2021 | RO | 24.03.2021 | RS | 24.03.2021 | SE | 24.03.2021 | SI | 24.03.2021 | SK | 24.03.2021 | SM | 24.03.2021 | BG | 24.06.2021 | NO | 24.06.2021 | GR | 25.06.2021 | IS | 24.07.2021 | PT | 26.07.2021 | [2024/25] |
Former [2024/23] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CY | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
IT | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
MK | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2024/20] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CY | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
IT | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2023/10] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
IT | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2022/44] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
MC | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2022/23] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2022/13] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SI | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
PT | 26.07.2021 | ||
IS | 29.12.2021 | ||
Former [2022/10] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
PT | 26.07.2021 | ||
IS | 29.12.2021 | ||
Former [2022/08] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
DK | 24.03.2021 | ||
EE | 24.03.2021 | ||
ES | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2022/07] | AL | 24.03.2021 | |
AT | 24.03.2021 | ||
CZ | 24.03.2021 | ||
EE | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2021/52] | AT | 24.03.2021 | |
CZ | 24.03.2021 | ||
EE | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
PL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2021/51] | AT | 24.03.2021 | |
CZ | 24.03.2021 | ||
EE | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
IS | 24.07.2021 | ||
PT | 26.07.2021 | ||
Former [2021/50] | AT | 24.03.2021 | |
CZ | 24.03.2021 | ||
EE | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
RO | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SK | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
PT | 26.07.2021 | ||
Former [2021/48] | AT | 24.03.2021 | |
CZ | 24.03.2021 | ||
EE | 24.03.2021 | ||
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/46] | AT | 24.03.2021 | |
FI | 24.03.2021 | ||
HR | 24.03.2021 | ||
LT | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
SM | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/43] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
LV | 24.03.2021 | ||
NL | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/38] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
LV | 24.03.2021 | ||
RS | 24.03.2021 | ||
SE | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/37] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
LV | 24.03.2021 | ||
RS | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/36] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
BG | 24.06.2021 | ||
NO | 24.06.2021 | ||
GR | 25.06.2021 | ||
Former [2021/35] | FI | 24.03.2021 | |
HR | 24.03.2021 | ||
NO | 24.06.2021 | ||
Former [2021/33] | FI | 24.03.2021 | |
NO | 24.06.2021 | Documents cited: | Search | [A]US2011294429 (SHIRAKATA NAGANORI [JP], et al) [A] 1-12 * abstract * * paragraph [0069] - paragraph [0095]; figures 1-4 * * paragraph [0131] - paragraph [0134]; figure 10 * * paragraph [0147] - paragraph [0180]; figures 13-16 *; | [A]US2016224778 (KIM IHL-HO [KR], et al) [A] 1,11,12 * abstract * * paragraphs [0022] - [0025]; figure 1 * * paragraphs [0029] - [0034]; figure 2 * * paragraphs [0045] - [0053]; figure 3 *; | [A]US2017289787 (YU LONGJIE [CN], et al) [A] 1,11,12 * abstract ** paragraphs [0079] - [0088]; figures 1,2 * | by applicant | WO2011055477 |