blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3531658

EP3531658 - PROVIDING INTER-ENTERPRISE DATA COMMUNICATIONS BETWEEN ENTERPRISE APPLICATIONS ON AN ELECTRONIC DEVICE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  19.03.2021
Database last updated on 22.08.2024
FormerThe patent has been granted
Status updated on  10.04.2020
FormerGrant of patent is intended
Status updated on  26.11.2019
FormerRequest for examination was made
Status updated on  18.10.2019
FormerThe application has been published
Status updated on  26.07.2019
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
BlackBerry Limited
2200 University Avenue East
Waterloo, Ontario N2K 0A7 / CA
[2019/35]
Inventor(s)01 / WHITE, Johnathan George
Ground Floor The Pearce Building
West Street
Maidenhead, Berkshire SL6 1RL / GB
02 / HAWKINS, Siavash James Joorabchian
Ground Floor The Pearce Building
West Street
Maidenhead, Berkshire SL6 1RL / GB
03 / STEWART, Fraser George
Ground Floor The Pearce Building
West Street
Maidenhead, Berkshire SL6 1RL / GB
 [2019/35]
Representative(s)Hanna Moore + Curley
Garryard House
25-26 Earlsfort Terrace
Dublin 2, D02 PX51 / IE
[N/P]
Former [2019/35]Hanna Moore + Curley
Garryard House
25/26 Earlsfort Terrace
Dublin 2, D02 PX51 / IE
Application number, filing date19157183.514.02.2019
[2019/35]
Priority number, dateUS20181590539426.02.2018         Original published format: US201815905394
[2019/35]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3531658
Date:28.08.2019
Language:EN
[2019/35]
Type: B1 Patent specification 
No.:EP3531658
Date:13.05.2020
Language:EN
[2020/20]
Search report(s)(Supplementary) European search report - dispatched on:EP28.06.2019
ClassificationIPC:H04L29/06, H04W12/08, H04W12/06, // G06F21/33, G06F21/62
[2019/35]
CPC:
H04L63/0823 (EP,US); H04L9/3268 (US); G06F21/335 (EP,US);
G06F21/6218 (EP,US); G06F9/547 (US); H04L9/3213 (US);
H04W12/069 (EP,US); H04W12/086 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/47]
Former [2019/35]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:BEREITSTELLUNG EINER UNTERNEHMENSÜBERGREIFENDEN DATENKOMMUNIKATION ZWISCHEN UNTERNEHMENSANWENDUNGEN AUF EINER ELEKTRONISCHEN VORRICHTUNG[2019/35]
English:PROVIDING INTER-ENTERPRISE DATA COMMUNICATIONS BETWEEN ENTERPRISE APPLICATIONS ON AN ELECTRONIC DEVICE[2019/35]
French:FOURNITURE DE COMMUNICATIONS DE DONNÉES INTER-ENTERPRISE ENTRE DES APPLICATIONS D'ENTREPRISE SUR UN DISPOSITIF ÉLECTRONIQUE[2019/35]
Examination procedure15.10.2019Examination requested  [2019/47]
15.10.2019Date on which the examining division has become responsible
27.11.2019Communication of intention to grant the patent
26.03.2020Fee for grant paid
26.03.2020Fee for publishing/printing paid
26.03.2020Receipt of the translation of the claim(s)
Opposition(s)16.02.2021No opposition filed within time limit [2021/16]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU14.02.2019
AL13.05.2020
AT13.05.2020
CY13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
MK13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
IE14.02.2021
LU14.02.2021
[2024/23]
Former [2023/41]HU14.02.2019
AL13.05.2020
AT13.05.2020
CY13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
IE14.02.2021
LU14.02.2021
Former [2023/33]HU14.02.2019
AL13.05.2020
AT13.05.2020
CY13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
IE14.02.2021
LU14.02.2021
Former [2023/30]AL13.05.2020
AT13.05.2020
CY13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
IE14.02.2021
LU14.02.2021
Former [2022/07]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
IE14.02.2021
LU14.02.2021
Former [2021/47]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
LU14.02.2021
Former [2021/41]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/10]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/09]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/08]AL13.05.2020
DK13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/04]AL13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RS13.05.2020
SE13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/01]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
RS13.05.2020
SE13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/51]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
RS13.05.2020
SE13.05.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/50]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
SE13.05.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/48]FI13.05.2020
LT13.05.2020
SE13.05.2020
NO13.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/47]LT13.05.2020
NO13.08.2020
IS13.09.2020
Former [2020/46]IS13.09.2020
Documents cited:Search[A]US8656016  (BENDER CHRISTOPHER LYLE [CA], et al) [A] 1-10 * abstract * * column 3, line 44 - column 4, line 62 * * column 11, line 59 - column 12, line 9 *;
 [A]US2014282869  (DABBIERE ALAN [US]) [A] 1-10* paragraph [0006] *;
 [A]US2017177892  (TINGSTROM DANIEL JAMES [US], et al) [A] 1-10 * paragraph [0016] * * paragraph [0026] - paragraph [0027] *;
 [A]EP3242242  (BLACKBERRY LTD [CA]) [A] 1-10 * abstract * * paragraph [0001] * * paragraph [0007] - paragraph [0021] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.