blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3528354

EP3528354 - FLUSH ELECTRICAL BOX [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.09.2022
Database last updated on 08.10.2024
FormerThe patent has been granted
Status updated on  21.10.2021
FormerGrant of patent is intended
Status updated on  23.06.2021
FormerExamination is in progress
Status updated on  25.09.2020
FormerRequest for examination was made
Status updated on  24.01.2020
FormerThe application has been published
Status updated on  19.07.2019
Most recent event   Tooltip27.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 30.10.2024 [2024/44]
Applicant(s)For all designated states
Italy Innovazioni S.p.A.
Corso di Porta Vittoria 13
20122 Milano / IT
[2021/49]
Former [2019/34]For all designated states
Italy Innovazioni S.p.A.
Via Sistina, 121
00187 Roma (RM) / IT
Inventor(s)01 / RENDE, Giorgio
Via Del Cenacolo, 40
87064 CORIGLIANO CALABRO (CS) / IT
 [2019/34]
Representative(s)Monelli, Alberto
C/o BUGNION S.P.A
Largo Michele Novaro, 1/A
43121 PARMA / IT
[N/P]
Former [2019/34]Monelli, Alberto
c/o BUGNION S.P.A
Largo Michele Novaro, 1/A
43121 PARMA ITALY / IT
Application number, filing date19157868.118.02.2019
[2019/34]
Priority number, dateIT2018000283119.02.2018         Original published format: IT201800002831
[2019/34]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3528354
Date:21.08.2019
Language:EN
[2019/34]
Type: B1 Patent specification 
No.:EP3528354
Date:17.11.2021
Language:EN
[2021/46]
Type: B8 Corrected title page of specification 
No.:EP3528354
Date:22.12.2021
[2021/51]
Search report(s)(Supplementary) European search report - dispatched on:EP03.07.2019
ClassificationIPC:H02G3/08
[2019/34]
CPC:
H02G3/086 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/09]
Former [2019/34]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:UNTERPUTZDOSE[2019/34]
English:FLUSH ELECTRICAL BOX[2019/34]
French:BOÎTE ÉLECTRIQUE ENCASTRÉE[2019/34]
Examination procedure22.01.2020Amendment by applicant (claims and/or description)
22.01.2020Examination requested  [2020/09]
22.01.2020Date on which the examining division has become responsible
29.09.2020Despatch of a communication from the examining division (Time limit: M04)
25.01.2021Reply to a communication from the examining division
24.06.2021Communication of intention to grant the patent
11.10.2021Fee for grant paid
11.10.2021Fee for publishing/printing paid
11.10.2021Receipt of the translation of the claim(s)
Opposition(s)18.08.2022No opposition filed within time limit [2022/43]
Fees paidRenewal fee
20.01.2021Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.02.2019
AL17.11.2021
AT17.11.2021
CY17.11.2021
CZ17.11.2021
DK17.11.2021
EE17.11.2021
ES17.11.2021
FI17.11.2021
HR17.11.2021
LT17.11.2021
LV17.11.2021
MC17.11.2021
MK17.11.2021
MT17.11.2021
NL17.11.2021
PL17.11.2021
RO17.11.2021
RS17.11.2021
SE17.11.2021
SI17.11.2021
SK17.11.2021
SM17.11.2021
TR17.11.2021
BG17.02.2022
NO17.02.2022
GR18.02.2022
IE18.02.2022
LU18.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
IS17.03.2022
PT17.03.2022
[2024/44]
Former [2024/29]HU18.02.2019
AL17.11.2021
AT17.11.2021
CY17.11.2021
CZ17.11.2021
DK17.11.2021
EE17.11.2021
ES17.11.2021
FI17.11.2021
HR17.11.2021
LT17.11.2021
LV17.11.2021
MC17.11.2021
MK17.11.2021
NL17.11.2021
PL17.11.2021
RO17.11.2021
RS17.11.2021
SE17.11.2021
SI17.11.2021
SK17.11.2021
SM17.11.2021
TR17.11.2021
BG17.02.2022
NO17.02.2022
GR18.02.2022
IE18.02.2022
LU18.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
IS17.03.2022
PT17.03.2022
Former [2024/25]HU18.02.2019
AL17.11.2021
AT17.11.2021
CY17.11.2021
CZ17.11.2021
DK17.11.2021
EE17.11.2021
ES17.11.2021
FI17.11.2021
HR17.11.2021
LT17.11.2021
LV17.11.2021
MC17.11.2021
MK17.11.2021
NL17.11.2021
PL17.11.2021
RO17.11.2021
RS17.11.2021
SE17.11.2021
SI17.11.2021
SK17.11.2021
SM17.11.2021
BG17.02.2022
NO17.02.2022
GR18.02.2022
IE18.02.2022
LU18.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
IS17.03.2022
PT17.03.2022
Former [2024/23]AL17.11.2021
AT17.11.2021
CY17.11.2021
CZ17.11.2021
DK17.11.2021
EE17.11.2021
ES17.11.2021
FI17.11.2021
HR17.11.2021
LT17.11.2021
LV17.11.2021
MC17.11.2021
MK17.11.2021
NL17.11.2021
PL17.11.2021
RO17.11.2021
RS17.11.2021
SE17.11.2021
SI17.11.2021
SK17.11.2021
SM17.11.2021
BG17.02.2022
NO17.02.2022
GR18.02.2022
IE18.02.2022
LU18.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
IS17.03.2022
PT17.03.2022
Former [2024/20]AL17.11.2021
AT17.11.2021
CY17.11.2021
CZ17.11.2021
DK17.11.2021
EE17.11.2021
ES17.11.2021
FI17.11.2021
HR17.11.2021
LT17.11.2021
LV17.11.2021
MC17.11.2021
NL17.11.2021
PL17.11.2021
RO17.11.2021
RS17.11.2021
SE17.11.2021
SI17.11.2021
SK17.11.2021
SM17.11.2021
BG17.02.2022
NO17.02.2022
GR18.02.2022
IE18.02.2022
LU18.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
IS17.03.2022
PT17.03.2022
Former [2023/10]AL17.11.2021
AT17.11.2021
CZ17.11.2021
DK17.11.2021
EE17.11.2021
ES17.11.2021
FI17.11.2021
HR17.11.2021
LT17.11.2021
LV17.11.2021
MC17.11.2021
NL17.11.2021
PL17.11.2021
RO17.11.2021
RS17.11.2021
SE17.11.2021
SI17.11.2021
SK17.11.2021
SM17.11.2021
BG17.02.2022
NO17.02.2022
GR18.02.2022
IE18.02.2022
LU18.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
IS17.03.2022
PT17.03.2022
Former [2023/09]AL17.11.2021
AT17.11.2021
CZ17.11.2021
DK17.11.2021
EE17.11.2021
ES17.11.2021
FI17.11.2021
HR17.11.2021
LT17.11.2021
LV17.11.2021
MC17.11.2021
NL17.11.2021
PL17.11.2021
RO17.11.2021
RS17.11.2021
SE17.11.2021
SI17.11.2021
SK17.11.2021
SM17.11.2021
BG17.02.2022
NO17.02.2022
GR18.02.2022
IE18.02.2022
LU18.02.2022
CH28.02.2022
LI28.02.2022
IS17.03.2022
PT17.03.2022
Former [2023/01]AL17.11.2021
AT17.11.2021
CZ17.11.2021
DK17.11.2021
EE17.11.2021
ES17.11.2021
FI17.11.2021
HR17.11.2021
LT17.11.2021
LV17.11.2021
MC17.11.2021
NL17.11.2021
PL17.11.2021
RO17.11.2021
RS17.11.2021
SE17.11.2021
SI17.11.2021
SK17.11.2021
SM17.11.2021
BG17.02.2022
NO17.02.2022
GR18.02.2022
LU18.02.2022
IS17.03.2022
PT17.03.2022
Former [2022/49]AL17.11.2021
AT17.11.2021
CZ17.11.2021
DK17.11.2021
EE17.11.2021
ES17.11.2021
FI17.11.2021
HR17.11.2021
LT17.11.2021
LV17.11.2021
MC17.11.2021
NL17.11.2021
PL17.11.2021
RO17.11.2021
RS17.11.2021
SE17.11.2021
SK17.11.2021
SM17.11.2021
BG17.02.2022
NO17.02.2022
GR18.02.2022
LU18.02.2022
IS17.03.2022
PT17.03.2022
Former [2022/47]AT17.11.2021
CZ17.11.2021
DK17.11.2021
EE17.11.2021
ES17.11.2021
FI17.11.2021
HR17.11.2021
LT17.11.2021
LV17.11.2021
MC17.11.2021
NL17.11.2021
PL17.11.2021
RO17.11.2021
RS17.11.2021
SE17.11.2021
SK17.11.2021
SM17.11.2021
BG17.02.2022
NO17.02.2022
GR18.02.2022
LU18.02.2022
IS17.03.2022
PT17.03.2022
Former [2022/44]AT17.11.2021
CZ17.11.2021
DK17.11.2021
EE17.11.2021
ES17.11.2021
FI17.11.2021
HR17.11.2021
LT17.11.2021
LV17.11.2021
MC17.11.2021
NL17.11.2021
PL17.11.2021
RO17.11.2021
RS17.11.2021
SE17.11.2021
SK17.11.2021
SM17.11.2021
BG17.02.2022
NO17.02.2022
GR18.02.2022
IS17.03.2022
PT17.03.2022
Former [2022/35]AT17.11.2021
CZ17.11.2021
DK17.11.2021
EE17.11.2021
ES17.11.2021
FI17.11.2021
HR17.11.2021
LT17.11.2021
LV17.11.2021
NL17.11.2021
PL17.11.2021
RO17.11.2021
RS17.11.2021
SE17.11.2021
SK17.11.2021
SM17.11.2021
BG17.02.2022
NO17.02.2022
GR18.02.2022
IS17.03.2022
PT17.03.2022
Former [2022/34]AT17.11.2021
EE17.11.2021
ES17.11.2021
FI17.11.2021
HR17.11.2021
LT17.11.2021
LV17.11.2021
NL17.11.2021
PL17.11.2021
RO17.11.2021
RS17.11.2021
SE17.11.2021
SK17.11.2021
SM17.11.2021
BG17.02.2022
NO17.02.2022
GR18.02.2022
IS17.03.2022
PT17.03.2022
Former [2022/33]AT17.11.2021
ES17.11.2021
FI17.11.2021
HR17.11.2021
LT17.11.2021
LV17.11.2021
NL17.11.2021
PL17.11.2021
RS17.11.2021
SE17.11.2021
SK17.11.2021
SM17.11.2021
BG17.02.2022
NO17.02.2022
GR18.02.2022
IS17.03.2022
PT17.03.2022
Former [2022/25]AT17.11.2021
ES17.11.2021
FI17.11.2021
HR17.11.2021
LT17.11.2021
LV17.11.2021
NL17.11.2021
PL17.11.2021
RS17.11.2021
SE17.11.2021
SK17.11.2021
BG17.02.2022
NO17.02.2022
GR18.02.2022
IS17.03.2022
PT17.03.2022
Former [2022/24]AT17.11.2021
ES17.11.2021
FI17.11.2021
HR17.11.2021
LT17.11.2021
LV17.11.2021
NL17.11.2021
PL17.11.2021
RS17.11.2021
SE17.11.2021
SK17.11.2021
BG17.02.2022
GR18.02.2022
IS17.03.2022
PT17.03.2022
Former [2022/23]AT17.11.2021
ES17.11.2021
FI17.11.2021
HR17.11.2021
LT17.11.2021
LV17.11.2021
PL17.11.2021
RS17.11.2021
SK17.11.2021
BG17.02.2022
PT17.03.2022
Former [2022/22]AT17.11.2021
FI17.11.2021
LT17.11.2021
RS17.11.2021
BG17.02.2022
Former [2022/21]AT17.11.2021
RS17.11.2021
BG17.02.2022
Former [2022/19]BG17.02.2022
Documents cited:Search[XI]EP2418746  (BETTERMANN OBO GMBH & CO KG [DE]) [X] 1,2,5,6,9,10 * paragraphs [0001] , [ 0006] , [0007] , [ 0025]; figures 1-3 * [I] 3,4;
 [X]EP0473481  (PLANET WATTOHM SA [FR]) [X] 1,7,8 * column 2, line 6 - column 3, line 22; figures 1-3 *;
 [X]US876619  (BLIEMEISTER LOUIS P [US]) [X] 1 * column 1, lines 39-52; figures 2,3 *;
 [XA]US5596174  (SAPIENZA JOSEPH [US]) [X] 1 * column 2, lines 14-24; figures 1-5 * * column 3, lines 36-44 * [A] 7,8;
 [X]US2007044986  (LALANCETTE DANIEL [CA], et al) [X] 1 * abstract *
ExaminationUS3690501
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.