EP3533609 - DEVICE AND METHOD FOR PROCESSING SEQUENTIALLY PRINTED SHEETS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.04.2022 Database last updated on 29.06.2024 | |
Former | The patent has been granted Status updated on 30.04.2021 | ||
Former | Grant of patent is intended Status updated on 25.01.2021 | ||
Former | Request for examination was made Status updated on 18.12.2020 | ||
Former | Grant of patent is intended Status updated on 23.08.2020 | ||
Former | Request for examination was made Status updated on 21.02.2020 | ||
Former | The application has been published Status updated on 02.08.2019 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Müller Martini Holding AG Sonnenbergstrasse 13 6052 Hergiswil / CH | [2019/36] | Inventor(s) | 01 /
Troxler, Christian Wydematt 6 6026 Rain / CH | [2019/36] | Application number, filing date | 19159004.1 | 25.02.2019 | [2019/36] | Priority number, date | CH20180000241 | 28.02.2018 Original published format: CH 2412018 | [2019/36] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3533609 | Date: | 04.09.2019 | Language: | DE | [2019/36] | Type: | B1 Patent specification | No.: | EP3533609 | Date: | 02.06.2021 | Language: | DE | [2021/22] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 09.05.2019 | Classification | IPC: | B41F13/54, B65H39/06, B65H7/14, B41F13/56, B65H45/04, B65H45/18 | [2019/36] | CPC: |
B41F13/56 (EP,US);
B65H37/06 (CN,US);
B31F5/005 (US);
B41F13/54 (EP,US);
B65H29/145 (EP,US);
B65H29/247 (EP,US);
B65H29/68 (EP,US);
B65H31/02 (EP,US);
B65H39/10 (US);
B65H43/00 (US);
B65H45/18 (EP,CN,US);
B65H2301/4212 (EP,US);
B65H2301/4213 (EP,US);
B65H2406/122 (CN);
B65H2701/18264 (EP,US);
B65H2801/24 (CN)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/13] |
Former [2019/36] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VORRICHTUNG UND VERFAHREN ZUR WEITERVERARBEITUNG SEQUENZIELL BEDRUCKTER DRUCKBOGEN | [2019/36] | English: | DEVICE AND METHOD FOR PROCESSING SEQUENTIALLY PRINTED SHEETS | [2019/36] | French: | DISPOSITIF ET PROCÉDÉ DE TRAITEMENT ULTÉRIEUR SÉQUENTIEL DE FEUILLES IMPRIMÉES | [2019/36] | Examination procedure | 18.02.2020 | Amendment by applicant (claims and/or description) | 18.02.2020 | Examination requested [2020/13] | 18.02.2020 | Date on which the examining division has become responsible | 24.08.2020 | Communication of intention to grant the patent | 17.12.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 17.12.2020 | Fee for grant paid | 17.12.2020 | Fee for publishing/printing paid | 02.02.2021 | Communication of intention to grant the patent | 27.04.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 03.03.2022 | No opposition filed within time limit [2022/19] | Fees paid | Renewal fee | 28.01.2021 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.02.2019 | AL | 02.06.2021 | CY | 02.06.2021 | CZ | 02.06.2021 | DK | 02.06.2021 | EE | 02.06.2021 | FI | 02.06.2021 | HR | 02.06.2021 | LT | 02.06.2021 | LV | 02.06.2021 | MC | 02.06.2021 | MK | 02.06.2021 | NL | 02.06.2021 | PL | 02.06.2021 | RO | 02.06.2021 | RS | 02.06.2021 | SE | 02.06.2021 | SI | 02.06.2021 | SK | 02.06.2021 | SM | 02.06.2021 | TR | 02.06.2021 | BG | 02.09.2021 | NO | 02.09.2021 | GR | 03.09.2021 | IS | 02.10.2021 | PT | 04.10.2021 | IE | 25.02.2022 | LU | 25.02.2022 | BE | 28.02.2022 | [2024/29] |
Former [2024/25] | HU | 25.02.2019 | |
AL | 02.06.2021 | ||
CY | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
MK | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
IE | 25.02.2022 | ||
LU | 25.02.2022 | ||
BE | 28.02.2022 | ||
Former [2024/23] | AL | 02.06.2021 | |
CY | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
MK | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
IE | 25.02.2022 | ||
LU | 25.02.2022 | ||
BE | 28.02.2022 | ||
Former [2024/20] | AL | 02.06.2021 | |
CY | 02.06.2021 | ||
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
IE | 25.02.2022 | ||
LU | 25.02.2022 | ||
BE | 28.02.2022 | ||
Former [2023/10] | AL | 02.06.2021 | |
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
IE | 25.02.2022 | ||
LU | 25.02.2022 | ||
BE | 28.02.2022 | ||
Former [2023/09] | AL | 02.06.2021 | |
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
IE | 25.02.2022 | ||
LU | 25.02.2022 | ||
Former [2022/47] | AL | 02.06.2021 | |
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
LU | 25.02.2022 | ||
Former [2022/44] | AL | 02.06.2021 | |
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
MC | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
Former [2022/29] | AL | 02.06.2021 | |
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SI | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
Former [2022/26] | AL | 02.06.2021 | |
CZ | 02.06.2021 | ||
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
Former [2022/21] | CZ | 02.06.2021 | |
DK | 02.06.2021 | ||
EE | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
Former [2022/10] | CZ | 02.06.2021 | |
EE | 02.06.2021 | ||
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
IS | 02.10.2021 | ||
PT | 04.10.2021 | ||
Former [2022/09] | CZ | 02.06.2021 | |
FI | 02.06.2021 | ||
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RO | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SK | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
PT | 04.10.2021 | ||
Former [2022/07] | FI | 02.06.2021 | |
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
NL | 02.06.2021 | ||
PL | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
SM | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
Former [2021/52] | FI | 02.06.2021 | |
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
PL | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
Former [2021/51] | FI | 02.06.2021 | |
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
RS | 02.06.2021 | ||
SE | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
Former [2021/49] | FI | 02.06.2021 | |
HR | 02.06.2021 | ||
LT | 02.06.2021 | ||
LV | 02.06.2021 | ||
SE | 02.06.2021 | ||
BG | 02.09.2021 | ||
NO | 02.09.2021 | ||
GR | 03.09.2021 | ||
Former [2021/47] | FI | 02.06.2021 | |
LT | 02.06.2021 | ||
BG | 02.09.2021 | ||
Former [2021/46] | FI | 02.06.2021 | |
LT | 02.06.2021 | Documents cited: | Search | [A]WO9518057 (FRANKENTHAL AG ALBERT [DE], et al) [A] 1-28 * page 7, paragraph 2 * * page 17, paragraph last; figure 8; claim 12 *; | [AD]EP2727868 (MUELLER MARTINI HOLDING AG [CH]) [AD] 1-28* paragraphs [0033] - [0038]; figures 1,2 *; | [A]EP3002241 (MÜLLER MARTINI HOLDING AG [CH]) [A] 1-28 * paragraphs [0049] , [0053] - [0055] - [0060] - [0062] - [0065]; figures 1-9; claims 9,11,16 *; | [AD]DE102016203043 (HEIDELBERGER DRUCKMASCH AG [DE]) [AD] 1-28 * paragraphs [0026] - [0028]; figures 3,4 * | by applicant | EP2502862 | EP2727868 | EP2727869 | EP2818331 | EP3002240 | DE102016203043 |