blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3540999

EP3540999 - METHOD AND APPARATUS FOR HANDLING TRANSMISSION DURING A RANDOM ACCESS PROCEDURE IN A WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.06.2021
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  03.07.2020
FormerGrant of patent is intended
Status updated on  29.04.2020
FormerRequest for examination was made
Status updated on  07.02.2020
FormerThe application has been published
Status updated on  16.08.2019
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
ASUSTek Computer Inc.
No. 15, Lite Rd.
Peitou Dist.
Taipei City 112 / TW
[2020/27]
Former [2019/38]For all designated states
ASUSTek Computer Inc.
No. 15, Lite Road
Peitou, Taipei-City 112 / TW
Inventor(s)01 / KUNG, Yi-Hsuan
c/o ASUSTek Computer Inc.
No. 15, Lite Rd., Peitou Dist.
Taipei City 112 / TW
02 / GUO, Yu-Hsuan
c/o ASUSTek Computer Inc.
No.15, Lite Rd., Peitou Dist.
Taipei City 112 / TW
03 / KUO, Richard Lee-Chee
c/o ASUSTek Computer Inc.
No. 15, Lite Rd., Peitou Dist.
Taipei City 112 / TW
 [2020/27]
Former [2019/38]01 / KUNG, Yi-Hsuan
c/o ASUSTek Computer Inc.
No. 15, Lite Rd., Peitou Dist.
112 Taipei City / TW
02 / GUO, Yu-Hsuan
c/o ASUSTek Computer Inc.
No.15, Lite Rd., Peitou Dist.
112 Taipei City / TW
03 / KUO, Richard Lee-Chee
c/o ASUSTek Computer Inc.
No. 15, Lite Rd., Peitou Dist.
112 Taipei City / TW
Representative(s)Hoefer & Partner Patentanwälte mbB
Pilgersheimer Straße 20
81543 München / DE
[2019/38]
Application number, filing date19159263.326.02.2019
[2019/38]
Priority number, dateUS201862642305P13.03.2018         Original published format: US 201862642305 P
US201862646607P22.03.2018         Original published format: US 201862646607 P
[2019/38]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3540999
Date:18.09.2019
Language:EN
[2019/38]
Type: B1 Patent specification 
No.:EP3540999
Date:05.08.2020
Language:EN
[2020/32]
Search report(s)(Supplementary) European search report - dispatched on:EP09.08.2019
ClassificationIPC:H04L1/18
[2019/38]
CPC:
H04L1/1887 (EP,US); H04W74/0833 (CN,US); H04L1/1812 (US);
H04W28/04 (US); H04W72/23 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/11]
Former [2019/38]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN UND VORRICHTUNG ZUR HANDHABUNG DER ÜBERTRAGUNG WÄHREND EINER DIREKTZUGRIFFPROZEDUR IN EINEM DRAHTLOSKOMMUNIKATIONSSYSTEM[2019/38]
English:METHOD AND APPARATUS FOR HANDLING TRANSMISSION DURING A RANDOM ACCESS PROCEDURE IN A WIRELESS COMMUNICATION SYSTEM[2019/38]
French:PROCÉDÉ ET APPAREIL POUR MANIPULER LA TRANSMISSION PENDANT UNE PROCÉDURE D'ACCÈS ALÉATOIRE DANS UN SYSTÈME DE COMMUNICATION SANS FIL[2019/38]
Examination procedure05.02.2020Amendment by applicant (claims and/or description)
05.02.2020Examination requested  [2020/11]
05.02.2020Date on which the examining division has become responsible
30.04.2020Communication of intention to grant the patent
26.05.2020Fee for grant paid
26.05.2020Fee for publishing/printing paid
26.05.2020Receipt of the translation of the claim(s)
Opposition(s)07.05.2021No opposition filed within time limit [2021/28]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU26.02.2019
AL05.08.2020
AT05.08.2020
CY05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
MK05.08.2020
MT05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
TR05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
IE26.02.2021
LU26.02.2021
BE28.02.2021
[2024/42]
Former [2024/29]HU26.02.2019
AL05.08.2020
AT05.08.2020
CY05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
MK05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
TR05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
IE26.02.2021
LU26.02.2021
BE28.02.2021
Former [2024/23]HU26.02.2019
AL05.08.2020
AT05.08.2020
CY05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
MK05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
IE26.02.2021
LU26.02.2021
BE28.02.2021
Former [2023/33]HU26.02.2019
AL05.08.2020
AT05.08.2020
CY05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
IE26.02.2021
LU26.02.2021
BE28.02.2021
Former [2023/30]AL05.08.2020
AT05.08.2020
CY05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
IE26.02.2021
LU26.02.2021
BE28.02.2021
Former [2022/34]AL05.08.2020
AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
IE26.02.2021
LU26.02.2021
BE28.02.2021
Former [2022/07]AL05.08.2020
AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
IE26.02.2021
LU26.02.2021
Former [2021/47]AL05.08.2020
AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
LU26.02.2021
Former [2021/41]AL05.08.2020
AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
MC05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/36]AL05.08.2020
AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SI05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/34]AL05.08.2020
AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
IT05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/28]AL05.08.2020
AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SK05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/25]AL05.08.2020
AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/22]AT05.08.2020
CZ05.08.2020
DK05.08.2020
EE05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RO05.08.2020
RS05.08.2020
SE05.08.2020
SM05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/21]AT05.08.2020
DK05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RS05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/12]AT05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
NL05.08.2020
PL05.08.2020
RS05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/10]AT05.08.2020
ES05.08.2020
FI05.08.2020
HR05.08.2020
LT05.08.2020
LV05.08.2020
PL05.08.2020
RS05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
IS05.12.2020
PT07.12.2020
Former [2021/09]AT05.08.2020
ES05.08.2020
FI05.08.2020
LT05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
GR06.11.2020
PT07.12.2020
Former [2021/08]ES05.08.2020
FI05.08.2020
LT05.08.2020
SE05.08.2020
BG05.11.2020
NO05.11.2020
PT07.12.2020
Former [2021/07]FI05.08.2020
LT05.08.2020
NO05.11.2020
Documents cited:Search[XAI]US2010322172  (HSU CHIA-CHUN [TW]) [X] 1-6,9-11 * figures 1, 4, 5, 7 * * paragraph [0004] - paragraph [0018] * * paragraph [0032] - paragraph [0048] * * paragraph [0055] - paragraph [0060] * [A] 7 [I] 8;
 [X]  - ERICSSON, "Collision of TTI bundle and Msg3", vol. RAN WG2, no. Ljubljana, Slovenia; 20131007 - 20131011, (20130928), 3GPP DRAFT; R2-133427 COLLISION OF TTI BUNDLE AND MSG3, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_83bis/Docs/, (20130928), XP050719181 [X] 1-3,9-11 * figures 1-3 * * sections 2.1-2.3 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.