EP3546143 - ROBOTIC END EFFECTOR ASSEMBLY, SYSTEM, AND METHOD OF USING THE SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.11.2023 Database last updated on 27.07.2024 | |
Former | The patent has been granted Status updated on 16.12.2022 | ||
Former | Grant of patent is intended Status updated on 21.08.2022 | ||
Former | Examination is in progress Status updated on 31.08.2019 | ||
Former | Request for examination was made Status updated on 30.08.2019 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states The Boeing Company 929 Long Bridge Drive Arlington, VA 22202 / US | [2023/12] |
Former [2019/40] | For all designated states The Boeing Company 100 North Riverside Plaza Chicago, IL 60606 / US | Inventor(s) | 01 /
OZOG, Stefan The Boeing Company 100 North Riverside Plaza Chicago, ILLINOIS 60606 / US | [2019/40] | Representative(s) | Bugnion S.p.A. - US1 Bugnion S.p.A. Via Pancaldo 68 37138 Verona / IT | [2023/03] |
Former [2019/40] | Inchingalo, Simona Bugnion S.p.A. Viale Lancetti, 17 20158 Milano / IT | Application number, filing date | 19159956.2 | 28.02.2019 | [2019/40] | Priority number, date | US201815937690 | 27.03.2018 Original published format: US201815937690 | [2019/40] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3546143 | Date: | 02.10.2019 | Language: | EN | [2019/40] | Type: | B1 Patent specification | No.: | EP3546143 | Date: | 18.01.2023 | Language: | EN | [2023/03] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 19.08.2019 | Classification | IPC: | B25J17/02, B23Q1/36, B25J9/00, F16M11/04, B23Q1/34, B23B31/08, B23B39/14, B25J11/00 | [2019/40] | CPC: |
B25J17/0225 (EP,US);
B25J18/02 (US);
B23B39/14 (EP,US);
B23B41/00 (CN);
B25J11/005 (EP,CN,US);
B25J11/0055 (US);
B25J15/0019 (CN);
B25J9/0015 (EP,US);
B23B2215/04 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/40] | Title | German: | ROBOTISCHE ENDEFFEKTORANORDNUNG, SYSTEM UND VERFAHREN ZU DEREN VERWENDUNG | [2022/34] | English: | ROBOTIC END EFFECTOR ASSEMBLY, SYSTEM, AND METHOD OF USING THE SAME | [2019/40] | French: | ENSEMBLE EFFECTEUR D'EXTRÉMITÉ ROBOTIQUE, SYSTÈME ET SON PROCÉDÉ D'UTILISATION | [2019/40] |
Former [2019/40] | ROBOTISCHE ENDEFFEKTORANORDNUNG, SYSTEM UND VERFAHREN ZUR VERWENDUNG DAVON | Examination procedure | 28.02.2019 | Examination requested [2019/40] | 19.08.2019 | Date on which the examining division has become responsible | 04.09.2019 | Despatch of a communication from the examining division (Time limit: M04) | 09.12.2019 | Reply to a communication from the examining division | 22.08.2022 | Communication of intention to grant the patent | 12.12.2022 | Fee for grant paid | 12.12.2022 | Fee for publishing/printing paid | 12.12.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 19.10.2023 | No opposition filed within time limit [2023/52] | Fees paid | Renewal fee | 25.02.2021 | Renewal fee patent year 03 | 25.02.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 18.01.2023 | CZ | 18.01.2023 | DK | 18.01.2023 | EE | 18.01.2023 | ES | 18.01.2023 | FI | 18.01.2023 | HR | 18.01.2023 | IT | 18.01.2023 | LT | 18.01.2023 | LV | 18.01.2023 | MC | 18.01.2023 | NL | 18.01.2023 | PL | 18.01.2023 | RO | 18.01.2023 | RS | 18.01.2023 | SE | 18.01.2023 | SI | 18.01.2023 | SK | 18.01.2023 | SM | 18.01.2023 | BE | 28.02.2023 | CH | 28.02.2023 | IE | 28.02.2023 | LI | 28.02.2023 | LU | 28.02.2023 | NO | 18.04.2023 | GR | 19.04.2023 | IS | 18.05.2023 | PT | 18.05.2023 | [2024/26] |
Former [2024/11] | AT | 18.01.2023 | |
CZ | 18.01.2023 | ||
DK | 18.01.2023 | ||
EE | 18.01.2023 | ||
ES | 18.01.2023 | ||
FI | 18.01.2023 | ||
HR | 18.01.2023 | ||
LT | 18.01.2023 | ||
LV | 18.01.2023 | ||
MC | 18.01.2023 | ||
NL | 18.01.2023 | ||
PL | 18.01.2023 | ||
RO | 18.01.2023 | ||
RS | 18.01.2023 | ||
SE | 18.01.2023 | ||
SI | 18.01.2023 | ||
SK | 18.01.2023 | ||
SM | 18.01.2023 | ||
BE | 28.02.2023 | ||
CH | 28.02.2023 | ||
IE | 28.02.2023 | ||
LI | 28.02.2023 | ||
LU | 28.02.2023 | ||
NO | 18.04.2023 | ||
GR | 19.04.2023 | ||
IS | 18.05.2023 | ||
PT | 18.05.2023 | ||
Former [2024/08] | AT | 18.01.2023 | |
CZ | 18.01.2023 | ||
DK | 18.01.2023 | ||
EE | 18.01.2023 | ||
ES | 18.01.2023 | ||
FI | 18.01.2023 | ||
HR | 18.01.2023 | ||
LT | 18.01.2023 | ||
LV | 18.01.2023 | ||
MC | 18.01.2023 | ||
NL | 18.01.2023 | ||
PL | 18.01.2023 | ||
RO | 18.01.2023 | ||
RS | 18.01.2023 | ||
SE | 18.01.2023 | ||
SK | 18.01.2023 | ||
SM | 18.01.2023 | ||
CH | 28.02.2023 | ||
IE | 28.02.2023 | ||
LI | 28.02.2023 | ||
LU | 28.02.2023 | ||
NO | 18.04.2023 | ||
GR | 19.04.2023 | ||
IS | 18.05.2023 | ||
PT | 18.05.2023 | ||
Former [2023/50] | AT | 18.01.2023 | |
CZ | 18.01.2023 | ||
DK | 18.01.2023 | ||
EE | 18.01.2023 | ||
ES | 18.01.2023 | ||
FI | 18.01.2023 | ||
HR | 18.01.2023 | ||
LT | 18.01.2023 | ||
LV | 18.01.2023 | ||
MC | 18.01.2023 | ||
NL | 18.01.2023 | ||
PL | 18.01.2023 | ||
RO | 18.01.2023 | ||
RS | 18.01.2023 | ||
SE | 18.01.2023 | ||
SK | 18.01.2023 | ||
SM | 18.01.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
LU | 28.02.2023 | ||
NO | 18.04.2023 | ||
GR | 19.04.2023 | ||
IS | 18.05.2023 | ||
PT | 18.05.2023 | ||
Former [2023/49] | AT | 18.01.2023 | |
CZ | 18.01.2023 | ||
DK | 18.01.2023 | ||
EE | 18.01.2023 | ||
ES | 18.01.2023 | ||
FI | 18.01.2023 | ||
HR | 18.01.2023 | ||
LT | 18.01.2023 | ||
LV | 18.01.2023 | ||
MC | 18.01.2023 | ||
NL | 18.01.2023 | ||
PL | 18.01.2023 | ||
RO | 18.01.2023 | ||
RS | 18.01.2023 | ||
SE | 18.01.2023 | ||
SM | 18.01.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
LU | 28.02.2023 | ||
NO | 18.04.2023 | ||
GR | 19.04.2023 | ||
IS | 18.05.2023 | ||
PT | 18.05.2023 | ||
Former [2023/48] | AT | 18.01.2023 | |
DK | 18.01.2023 | ||
EE | 18.01.2023 | ||
ES | 18.01.2023 | ||
FI | 18.01.2023 | ||
HR | 18.01.2023 | ||
LT | 18.01.2023 | ||
LV | 18.01.2023 | ||
MC | 18.01.2023 | ||
NL | 18.01.2023 | ||
PL | 18.01.2023 | ||
RS | 18.01.2023 | ||
SE | 18.01.2023 | ||
SM | 18.01.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
NO | 18.04.2023 | ||
GR | 19.04.2023 | ||
IS | 18.05.2023 | ||
PT | 18.05.2023 | ||
Former [2023/46] | AT | 18.01.2023 | |
DK | 18.01.2023 | ||
ES | 18.01.2023 | ||
FI | 18.01.2023 | ||
HR | 18.01.2023 | ||
LT | 18.01.2023 | ||
LV | 18.01.2023 | ||
NL | 18.01.2023 | ||
PL | 18.01.2023 | ||
RS | 18.01.2023 | ||
SE | 18.01.2023 | ||
SM | 18.01.2023 | ||
NO | 18.04.2023 | ||
GR | 19.04.2023 | ||
IS | 18.05.2023 | ||
PT | 18.05.2023 | ||
Former [2023/39] | AT | 18.01.2023 | |
ES | 18.01.2023 | ||
FI | 18.01.2023 | ||
HR | 18.01.2023 | ||
LT | 18.01.2023 | ||
LV | 18.01.2023 | ||
NL | 18.01.2023 | ||
PL | 18.01.2023 | ||
RS | 18.01.2023 | ||
SE | 18.01.2023 | ||
NO | 18.04.2023 | ||
GR | 19.04.2023 | ||
IS | 18.05.2023 | ||
PT | 18.05.2023 | ||
Former [2023/38] | AT | 18.01.2023 | |
ES | 18.01.2023 | ||
FI | 18.01.2023 | ||
HR | 18.01.2023 | ||
LT | 18.01.2023 | ||
LV | 18.01.2023 | ||
NL | 18.01.2023 | ||
PL | 18.01.2023 | ||
RS | 18.01.2023 | ||
SE | 18.01.2023 | ||
NO | 18.04.2023 | ||
GR | 19.04.2023 | ||
PT | 18.05.2023 | ||
Former [2023/37] | AT | 18.01.2023 | |
ES | 18.01.2023 | ||
FI | 18.01.2023 | ||
HR | 18.01.2023 | ||
LT | 18.01.2023 | ||
LV | 18.01.2023 | ||
NL | 18.01.2023 | ||
RS | 18.01.2023 | ||
SE | 18.01.2023 | ||
NO | 18.04.2023 | ||
GR | 19.04.2023 | ||
PT | 18.05.2023 | ||
Former [2023/36] | AT | 18.01.2023 | |
ES | 18.01.2023 | ||
FI | 18.01.2023 | ||
HR | 18.01.2023 | ||
LT | 18.01.2023 | ||
LV | 18.01.2023 | ||
NL | 18.01.2023 | ||
RS | 18.01.2023 | ||
SE | 18.01.2023 | ||
NO | 18.04.2023 | ||
PT | 18.05.2023 | ||
Former [2023/35] | AT | 18.01.2023 | |
ES | 18.01.2023 | ||
HR | 18.01.2023 | ||
LT | 18.01.2023 | ||
NL | 18.01.2023 | ||
RS | 18.01.2023 | ||
NO | 18.04.2023 | ||
PT | 18.05.2023 | ||
Former [2023/34] | ES | 18.01.2023 | |
LT | 18.01.2023 | ||
NL | 18.01.2023 | ||
RS | 18.01.2023 | ||
PT | 18.05.2023 | ||
Former [2023/33] | ES | 18.01.2023 | |
LT | 18.01.2023 | ||
NL | 18.01.2023 | ||
Former [2023/31] | NL | 18.01.2023 | Documents cited: | Search | [Y]GB775043 (SIGMA INSTR CO LTD) [Y] 7,11,14 * figure . ** page 1, line 65 - line 74 *; | [Y]US5157823 (DELAVAL JACQUES [FR], et al) [Y] 4 * abstract * * column 2, line 58 - line 64 *; | [XY]US2001012478 (GIANNI TRIONFETTI [IT]) [X] 1-3,8,9 * figure 1 * * paragraph [0027] - paragraph [0034] * * paragraph [0040] * [Y] 7,11,14; | [X]DE202006017265U (THIELENHAUS TECHNOLOGIES GMBH [DE]) [X] 1,2,8,9 * figures 1,2 * * paragraph [0016] *; | [XY]DE102009035877 (FRAUNHOFER GES FORSCHUNG [DE]) [X] 1,2,6,8-10,12,13 * abstract * * paragraph [0016] * * paragraph [0051] - paragraph [0055] * * paragraph [0070] * * paragraph [0075] - paragraph [0078] * [Y] 4,5,15; | [Y]EP2842672 (BOEING CO [US]) [Y] 5,15 * abstract * * paragraph [0006] * * paragraph [0055] * |