EP3702131 - MATERIAL UNIT FOR AN ADDITIVE MANUFACTURING DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.09.2023 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 21.10.2022 | ||
Former | Grant of patent is intended Status updated on 04.07.2022 | ||
Former | Request for examination was made Status updated on 05.03.2021 | ||
Former | The application has been published Status updated on 31.07.2020 | Most recent event Tooltip | 16.02.2024 | Lapse of the patent in a contracting state New state(s): BE | published on 20.03.2024 [2024/12] | Applicant(s) | For all designated states Sirona Dental Systems GmbH Fabrikstr. 31 64625 Bensheim / DE | For all designated states DENTSPLY SIRONA Inc. 221 W. Philadelphia Street, Suite 60 W. York, PA 17401 / US | [2022/47] |
Former [2020/36] | For all designated states Sirona Dental Systems GmbH Fabrikstr. 31 64625 Bensheim / DE | ||
For all designated states DENTSPLY SIRONA Inc. 221 W. Philadelphia Street, Suite 60 W. York, PA 17401 / US | Inventor(s) | 01 /
SCHMIDT, Christian Jakobsweg 70 64625 Bensheim / DE | 02 /
HASENZAHL, Thomas Stresemannstr. 12 64297 Darmstadt / DE | 03 /
SCHWAIGER, Michael Erlgasse 48/9 1120 Wien / AT | 04 /
KUHNLE, Markus Planierungsstraße 91-93 3421 Höflein an der Donau / AT | 05 /
RIES, Andreas Müllerstraße 22 64289 Darmstadt / DE | 06 /
RICHTER, Torsten Paul-Wagner-Straße 28 64285 Darmstadt / DE | [2020/36] | Representative(s) | Özer, Alpdeniz Sirona Dental Systems GmbH Corporate Legal Fabrikstraße 31 64625 Bensheim / DE | [2022/47] |
Former [2020/36] | Özer, Alpdeniz Dentsply Sirona Legal IP Department Fabrikstraße 31 64625 Bensheim / DE | Application number, filing date | 19160125.1 | 28.02.2019 | [2020/36] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3702131 | Date: | 02.09.2020 | Language: | EN | [2020/36] | Type: | B1 Patent specification | No.: | EP3702131 | Date: | 23.11.2022 | Language: | EN | [2022/47] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 19.11.2019 | Classification | IPC: | B29C64/124, G01F23/26, B29C64/241, B29C64/259, B33Y40/00, B33Y30/00, B29C64/321, B29C64/314, B01F23/00, B01F31/23, B01F31/441, B01F33/452, G01F23/263 | [2022/26] | CPC: |
B29C64/124 (EP);
B29C64/135 (KR);
B29C64/255 (KR,US);
B01F23/023 (EP,KR);
B01F31/23 (EP,KR);
B01F31/441 (EP,KR);
B01F33/452 (EP,KR);
B29C64/241 (EP,KR);
B29C64/259 (EP,KR);
B29C64/314 (EP,KR,US);
B29C64/321 (EP,KR);
B29C64/343 (US);
B29C64/386 (US);
B33Y30/00 (EP,KR,US);
B33Y40/00 (EP,KR);
B33Y40/10 (US);
B33Y50/00 (US);
G01F23/263 (EP,KR,US);
G01F23/268 (EP)
(-)
|
Former IPC [2020/36] | B29C64/124, B29C64/314, B29C64/321, B33Y30/00, B33Y40/00, B29C64/259, B29C64/241, B01F13/08, G01F23/26 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/14] |
Former [2020/36] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | MATERIALEINHEIT FÜR EINE VORRICHTUNG ZUR GENERATIVEN FERTIGUNG | [2020/36] | English: | MATERIAL UNIT FOR AN ADDITIVE MANUFACTURING DEVICE | [2020/36] | French: | UNITÉ DE MATÉRIAU POUR DISPOSITIF DE FABRICATION ADDITIVE | [2020/36] | Examination procedure | 26.02.2021 | Amendment by applicant (claims and/or description) | 26.02.2021 | Examination requested [2021/14] | 26.02.2021 | Date on which the examining division has become responsible | 05.07.2022 | Communication of intention to grant the patent | 17.10.2022 | Fee for grant paid | 17.10.2022 | Fee for publishing/printing paid | 17.10.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 24.08.2023 | No opposition filed within time limit [2023/44] | Fees paid | Renewal fee | 12.02.2021 | Renewal fee patent year 03 | 14.01.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 23.11.2022 | DK | 23.11.2022 | EE | 23.11.2022 | ES | 23.11.2022 | FI | 23.11.2022 | HR | 23.11.2022 | LT | 23.11.2022 | LV | 23.11.2022 | MC | 23.11.2022 | NL | 23.11.2022 | PL | 23.11.2022 | RO | 23.11.2022 | RS | 23.11.2022 | SE | 23.11.2022 | SI | 23.11.2022 | SK | 23.11.2022 | SM | 23.11.2022 | NO | 23.02.2023 | GR | 24.02.2023 | BE | 28.02.2023 | IE | 28.02.2023 | LU | 28.02.2023 | IS | 23.03.2023 | PT | 23.03.2023 | [2024/12] |
Former [2024/08] | AL | 23.11.2022 | |
DK | 23.11.2022 | ||
EE | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
MC | 23.11.2022 | ||
NL | 23.11.2022 | ||
PL | 23.11.2022 | ||
RO | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SI | 23.11.2022 | ||
SK | 23.11.2022 | ||
SM | 23.11.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IE | 28.02.2023 | ||
LU | 28.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/51] | AL | 23.11.2022 | |
DK | 23.11.2022 | ||
EE | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
MC | 23.11.2022 | ||
NL | 23.11.2022 | ||
PL | 23.11.2022 | ||
RO | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SI | 23.11.2022 | ||
SK | 23.11.2022 | ||
SM | 23.11.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
LU | 28.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/49] | AL | 23.11.2022 | |
DK | 23.11.2022 | ||
EE | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
MC | 23.11.2022 | ||
NL | 23.11.2022 | ||
PL | 23.11.2022 | ||
RO | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SK | 23.11.2022 | ||
SM | 23.11.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
LU | 28.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/44] | AL | 23.11.2022 | |
DK | 23.11.2022 | ||
EE | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
MC | 23.11.2022 | ||
NL | 23.11.2022 | ||
PL | 23.11.2022 | ||
RO | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SK | 23.11.2022 | ||
SM | 23.11.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/38] | AL | 23.11.2022 | |
DK | 23.11.2022 | ||
EE | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
NL | 23.11.2022 | ||
PL | 23.11.2022 | ||
RO | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SK | 23.11.2022 | ||
SM | 23.11.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/37] | AL | 23.11.2022 | |
DK | 23.11.2022 | ||
EE | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
NL | 23.11.2022 | ||
PL | 23.11.2022 | ||
RO | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SM | 23.11.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/35] | DK | 23.11.2022 | |
EE | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
NL | 23.11.2022 | ||
PL | 23.11.2022 | ||
RO | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SM | 23.11.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/34] | DK | 23.11.2022 | |
EE | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
NL | 23.11.2022 | ||
PL | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SM | 23.11.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/33] | DK | 23.11.2022 | |
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
NL | 23.11.2022 | ||
PL | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SM | 23.11.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/29] | ES | 23.11.2022 | |
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
NL | 23.11.2022 | ||
PL | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/25] | ES | 23.11.2022 | |
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
PL | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/23] | ES | 23.11.2022 | |
FI | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
SE | 23.11.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
PT | 23.03.2023 | ||
Former [2023/22] | ES | 23.11.2022 | |
FI | 23.11.2022 | ||
LT | 23.11.2022 | ||
SE | 23.11.2022 | ||
NO | 23.02.2023 | ||
PT | 23.03.2023 | ||
Former [2023/20] | LT | 23.11.2022 | |
NO | 23.02.2023 | Documents cited: | Search | [XAY]US2007075461 (HUNTER DON F [US], et al); | [Y]WO2015015261 (COSTABEBER ETTORE MAURIZIO [IT]); | [XA]WO2015092717 (COSTABEBER ETTORE MAURIZIO [IT]); | [Y]US2015210012 (ZENERE SERGIO [IT]); | [Y]CN104943164 (XYZ PRINTING INC, et al); | [X]EP3330062 (IVOCLAR VIVADENT AG [LI]); | [Y]EP3428585 (XYZPRINTING INC [TW], et al) |