blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3534066

EP3534066 - LUMINAIRE, HOUSING COMPONENT FOR A LUMINAIRE AND METHOD FOR MANUFACTURING A LUMINAIRE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.11.2021
Database last updated on 07.10.2024
FormerThe patent has been granted
Status updated on  27.11.2020
FormerGrant of patent is intended
Status updated on  16.07.2020
FormerExamination is in progress
Status updated on  01.05.2020
FormerRequest for examination was made
Status updated on  06.03.2020
FormerThe application has been published
Status updated on  02.08.2019
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
H4X e.U.
Auer-Welsbach-Gasse 36
8055 Graz / AT
[2019/36]
Inventor(s)01 / HIERZER, Andreas
Alberstraße 15/3
8010 Graz / AT
 [2020/52]
Former [2019/36]01 / HIERZER, Andreas
Herrengasse 7/4, Stiege 1, Top 524
8010 Graz / AT
Representative(s)Isarpatent
Patent- und Rechtsanwälte Barth
Charles Hassa Peckmann & Partner mbB
Friedrichstrasse 31
80801 München / DE
[N/P]
Former [2019/36]Isarpatent
Patent- und Rechtsanwälte Behnisch Barth Charles
Hassa Peckmann & Partner mbB
Friedrichstrasse 31
80801 München / DE
Application number, filing date19160429.704.03.2019
[2019/36]
Priority number, dateDE2018100165302.03.2018         Original published format: DE102018001653
[2019/36]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3534066
Date:04.09.2019
Language:DE
[2019/36]
Type: B1 Patent specification 
No.:EP3534066
Date:30.12.2020
Language:DE
[2020/53]
Search report(s)(Supplementary) European search report - dispatched on:EP31.05.2019
ClassificationIPC:F21V17/00, F21V19/00, F21V29/70, F21V29/83, // F21Y115/10
[2019/36]
CPC:
F21V17/002 (EP,US); F21V21/02 (AT); F21V29/70 (EP,AT,US);
F21S8/026 (US); F21S8/046 (AT); F21V19/003 (AT,US);
F21V19/0035 (EP,US); F21V23/003 (US); F21V23/02 (US);
F21V29/83 (EP,US); F21Y2105/10 (AT); F21Y2115/10 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/15]
Former [2019/36]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:LEUCHTE, GEHÄUSEKOMPONENTE FÜR EINE LEUCHTE, SOWIE VERFAHREN ZUR HERSTELLUNG EINER LEUCHTE[2019/36]
English:LUMINAIRE, HOUSING COMPONENT FOR A LUMINAIRE AND METHOD FOR MANUFACTURING A LUMINAIRE[2019/36]
French:LUMINAIRE, ÉLÉMENT DE BOÎTIER POUR UN LUMINAIRE AINSI QUE PROCÉDÉ DE FABRICATION D'UN LUMINAIRE[2020/52]
Former [2019/36]LUMINAIRE, ÉLÉMENTS DE BOÎTIER POUR UN LUMINAIRE AINSI QUE PROCÉDÉ DE FABRICATION D'UN LUMINAIRE
Examination procedure27.02.2020Amendment by applicant (claims and/or description)
27.02.2020Examination requested  [2020/15]
27.02.2020Date on which the examining division has become responsible
07.05.2020Despatch of a communication from the examining division (Time limit: M04)
26.06.2020Reply to a communication from the examining division
17.07.2020Communication of intention to grant the patent
12.11.2020Fee for grant paid
12.11.2020Fee for publishing/printing paid
12.11.2020Receipt of the translation of the claim(s)
Opposition(s)01.10.2021No opposition filed within time limit [2021/49]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.03.2019
AL30.12.2020
CY30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
ES30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
MK30.12.2020
MT30.12.2020
NL30.12.2020
RO30.12.2020
RS30.12.2020
SI30.12.2020
SK30.12.2020
SM30.12.2020
TR30.12.2020
IE04.03.2021
LU04.03.2021
BG30.03.2021
NO30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
[2024/42]
Former [2024/29]HU04.03.2019
AL30.12.2020
CY30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
ES30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
MK30.12.2020
NL30.12.2020
RO30.12.2020
RS30.12.2020
SI30.12.2020
SK30.12.2020
SM30.12.2020
TR30.12.2020
IE04.03.2021
LU04.03.2021
BG30.03.2021
NO30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
Former [2024/23]HU04.03.2019
AL30.12.2020
CY30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
ES30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
MK30.12.2020
NL30.12.2020
RO30.12.2020
RS30.12.2020
SI30.12.2020
SK30.12.2020
SM30.12.2020
IE04.03.2021
LU04.03.2021
BG30.03.2021
NO30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
Former [2023/33]HU04.03.2019
AL30.12.2020
CY30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
ES30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
NL30.12.2020
RO30.12.2020
RS30.12.2020
SI30.12.2020
SK30.12.2020
SM30.12.2020
IE04.03.2021
LU04.03.2021
BG30.03.2021
NO30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
Former [2023/30]AL30.12.2020
CY30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
ES30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
NL30.12.2020
RO30.12.2020
RS30.12.2020
SI30.12.2020
SK30.12.2020
IE04.03.2021
LU04.03.2021
BG30.03.2021
NO30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
Former [2023/29]AL30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
ES30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
NL30.12.2020
RO30.12.2020
RS30.12.2020
SI30.12.2020
SK30.12.2020
IE04.03.2021
LU04.03.2021
BG30.03.2021
NO30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
Former [2022/23]AL30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
ES30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
RO30.12.2020
RS30.12.2020
SI30.12.2020
SK30.12.2020
IE04.03.2021
LU04.03.2021
BG30.03.2021
NO30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
Former [2022/13]AL30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
ES30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
RO30.12.2020
RS30.12.2020
SI30.12.2020
SK30.12.2020
IE04.03.2021
LU04.03.2021
BG30.03.2021
NO30.03.2021
GR31.03.2021
PT30.04.2021
Former [2022/10]AL30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
ES30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
RO30.12.2020
RS30.12.2020
SK30.12.2020
IE04.03.2021
LU04.03.2021
BG30.03.2021
NO30.03.2021
GR31.03.2021
PT30.04.2021
Former [2022/08]AL30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
ES30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
RO30.12.2020
RS30.12.2020
SK30.12.2020
IE04.03.2021
LU04.03.2021
BG30.03.2021
NO30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
Former [2022/07]AL30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
RO30.12.2020
RS30.12.2020
SK30.12.2020
IE04.03.2021
BG30.03.2021
NO30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
Former [2021/49]AL30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
RO30.12.2020
RS30.12.2020
SK30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
Former [2021/45]AL30.12.2020
CZ30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
RO30.12.2020
RS30.12.2020
SK30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
Former [2021/42]CZ30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
RO30.12.2020
RS30.12.2020
SK30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
Former [2021/36]CZ30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
RO30.12.2020
RS30.12.2020
SK30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
PT30.04.2021
Former [2021/35]CZ30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
RO30.12.2020
RS30.12.2020
SK30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
PT30.04.2021
Former [2021/33]FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
RS30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
PT30.04.2021
Former [2021/28]FI30.12.2020
HR30.12.2020
LV30.12.2020
RS30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
Former [2021/23]FI30.12.2020
LV30.12.2020
RS30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
Former [2021/22]FI30.12.2020
RS30.12.2020
NO30.03.2021
Former [2021/20]FI30.12.2020
Documents cited:Search[XI]US2007098334  (CHEN KUEI-FANG [TW]) [X] 1,2,4,6-10,12,13,18,21,22 * paragraph [0026] * * paragraphs [0034] - [0037] * * figures 3, 9, 10 * [I] 11,14-17,19,20,23;
 [XI]US2009154160  (LI HAO [CN], et al) [X] 1-4,21 * paragraph [0020] * * figure 2 * [I] 15-20;
 [A]US7631985  (KNOBLE DAVID W [US], et al) [A] 1,3,6,9* figure 5 *;
 [XYI]DE202011000426U  (RICHTER LIGHTING TECHNOLOGIES GMBH [DE]) [X] 1,4,21 * paragraph [0026] * * figure 2 * [Y] 6-20,22,23 [I] 2;
 [XI]WO2013153758  (PANASONIC CORP [JP]) [X] 1,3,21 * paragraphs [0030] , [0 77] * * figure 8 * [I] 2,15-20,22;
 [XI]US2017167665  (GERMAIN STEVE [CA], et al) [X] 1,2,4,21 * paragraphs [0026] , [0 27] * * figures 1B, 2 * [I] 15-20;
 [Y]US2017175987  (NEWTON PHILIP STEVEN [NL], et al) [Y] 6-20,22,23 * figures 1-5 *;
 [XI]US2018058676  (HUANG HUAN HSIANG [TW], et al) [X] 1-3,21 * paragraph [0026] * * figures 2, 4, 5 * [I] 15-20
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.