blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3517684

EP3517684 - COMPRESSOR ROLLER [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.04.2021
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  15.05.2020
FormerGrant of patent is intended
Status updated on  13.02.2020
FormerRequest for examination was made
Status updated on  20.12.2019
FormerThe application has been published
Status updated on  28.06.2019
Most recent event   Tooltip08.09.2023Lapse of the patent in a contracting state
New state(s): SI
published on 11.10.2023  [2023/41]
Applicant(s)For all designated states
Hamm AG
Hammstrasse 1
95643 Tirschenreuth / DE
[2019/31]
Inventor(s)01 / Janner, Peter
Steinbühl 2
92703 Krummenaab / DE
02 / Römer, Axel
Martin-Luther-Straße 43
95643 Tirschenreuth / DE
 [2019/31]
Representative(s)Ruttensperger Lachnit Trossin Gomoll
Patent- und Rechtsanwälte
PartG mbB
Arnulfstraße 58
80335 München / DE
[2019/31]
Application number, filing date19161465.013.12.2017
[2019/31]
Priority number, dateDE20161012592730.12.2016         Original published format: DE102016125927
[2019/31]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3517684
Date:31.07.2019
Language:DE
[2019/31]
Type: B1 Patent specification 
No.:EP3517684
Date:17.06.2020
Language:DE
[2020/25]
Search report(s)(Supplementary) European search report - dispatched on:EP21.06.2019
ClassificationIPC:E01C19/28
[2019/31]
CPC:
E02D3/026 (EP,US); E01C19/236 (US); E01C19/286 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/04]
Former [2019/31]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERDICHTERWALZE[2019/31]
English:COMPRESSOR ROLLER[2019/31]
French:CYLINDRE COMPACTEUR[2019/31]
Examination procedure17.12.2019Amendment by applicant (claims and/or description)
17.12.2019Examination requested  [2020/04]
17.12.2019Date on which the examining division has become responsible
14.02.2020Communication of intention to grant the patent
12.05.2020Fee for grant paid
12.05.2020Fee for publishing/printing paid
12.05.2020Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP17206933.8  / EP3342931
Opposition(s)18.03.2021No opposition filed within time limit [2021/21]
Fees paidRenewal fee
23.12.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.12.2017
AL17.06.2020
CY17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MK17.06.2020
MT17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
TR17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
IE13.12.2020
LU13.12.2020
BE31.12.2020
CH31.12.2020
FR31.12.2020
LI31.12.2020
[2023/41]
Former [2022/33]HU13.12.2017
AL17.06.2020
CY17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MK17.06.2020
MT17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SK17.06.2020
SM17.06.2020
TR17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
IE13.12.2020
LU13.12.2020
BE31.12.2020
CH31.12.2020
FR31.12.2020
LI31.12.2020
Former [2022/27]HU13.12.2017
AL17.06.2020
CY17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MT17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SK17.06.2020
SM17.06.2020
TR17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
IE13.12.2020
LU13.12.2020
CH31.12.2020
FR31.12.2020
LI31.12.2020
Former [2021/52]AL17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
IE13.12.2020
LU13.12.2020
CH31.12.2020
FR31.12.2020
LI31.12.2020
Former [2021/48]AL17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
IE13.12.2020
LU13.12.2020
FR31.12.2020
Former [2021/46]AL17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
IE13.12.2020
LU13.12.2020
Former [2021/40]AL17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/21]AL17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/10]AL17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/09]AL17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
RO17.06.2020
RS17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
PT19.10.2020
Former [2021/04]AL17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
RS17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
Former [2021/01]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
RS17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
Former [2020/51]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
RS17.06.2020
NO17.09.2020
GR18.09.2020
Former [2020/50]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
NO17.09.2020
GR18.09.2020
Former [2020/48]FI17.06.2020
LT17.06.2020
NO17.09.2020
Former [2020/47]LT17.06.2020
NO17.09.2020
Documents cited:Search[XI]US4089616  (FAIRCHILD LOUIS F, et al) [X] 1-4,6-8,10 * column 1, lines 5-11 * * column 2, lines 23-26 * * column 3, lines 15-57 * * figure 1 * [I] 5,9;
 [XA]EP0089386  (LOSENHAUSEN MASCHINENBAU AG [DE]) [X] 1,2,10 * the whole document * [A] 3-9;
 [XA]EP0945187  (BOMAG GMBH [DE]) [X] 1,6-10 * paragraphs [0001] , [0005]; figure 1; claim 1 * [A] 2-5;
 [XAI]US2002114667  (KALDENBERG JAMES A [US], et al) [X] 1,2,10 * paragraphs [0004] , [0012] , [0026] * * figure 1 * [A] 3,5-9 [I] 4;
 [XA]US6561729  (POTTS DEAN R [US]) [X] 1-6,8,10 * column 1, lines 6-8 * * column 2, lines 10-42 * * column 3, lines 13-57 * * figures 2,3 * [A] 7,9;
 [XAI]US2004012244  (WATERMAN TERRY M [US], et al) [X] 1,2,6-10 * the whole document * [A] 3[I] 4,5
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.