EP3705204 - A STOPPER ROD AND A METHOD FOR PROVIDING A UNIFORM GAS CURTAIN AROUND A STOPPER ROD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 09.06.2023 Database last updated on 07.06.2024 | |
Former | The patent has been granted Status updated on 01.07.2022 | ||
Former | Grant of patent is intended Status updated on 28.03.2022 | ||
Former | Examination is in progress Status updated on 04.03.2021 | ||
Former | Request for examination was made Status updated on 29.01.2021 | ||
Former | The application has been published Status updated on 07.08.2020 | Most recent event Tooltip | 09.02.2024 | Lapse of the patent in a contracting state New state(s): FR | published on 13.03.2024 [2024/11] | Applicant(s) | For all designated states Refractory Intellectual Property GmbH & Co. KG Wienerbergstraße 11 1100 Wien / AT | [2022/31] |
Former [2020/37] | For all designated states Refractory Intellectual Property GmbH & Co. KG Wienerbergstrasse 11 1100 Wien / AT | Inventor(s) | 01 /
HACKL, Gernot Brückengasse 20 8793 Trofaiach / AT | 02 /
FELLNER, Wolfgang Radmeistergasse 15 8700 Leoben / AT | [2020/37] | Representative(s) | Berkenbrink, Kai-Oliver Patentanwälte Becker & Müller Turmstrasse 22 40878 Ratingen / DE | [2020/37] | Application number, filing date | 19161721.6 | 08.03.2019 | [2020/37] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3705204 | Date: | 09.09.2020 | Language: | EN | [2020/37] | Type: | B1 Patent specification | No.: | EP3705204 | Date: | 03.08.2022 | Language: | EN | [2022/31] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 11.06.2019 | Classification | IPC: | B22D41/18 | [2020/37] | CPC: |
B22D41/186 (EP,KR,US);
B22D41/42 (KR);
B22D41/58 (KR)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/09] |
Former [2020/37] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | STOPFENSTANGE UND VERFAHREN ZUR BEREITSTELLUNG EINES GLEICHMÄSSIGEN GASVORHANGS UM EINE STOPFENSTANGE | [2020/37] | English: | A STOPPER ROD AND A METHOD FOR PROVIDING A UNIFORM GAS CURTAIN AROUND A STOPPER ROD | [2020/37] | French: | TIGE DE BUTÉE ET PROCÉDÉ DE FOURNITURE D'UN RIDEAU DE GAZ UNIFORME AUTOUR D'UNE TIGE DE BUTÉE | [2020/37] | Examination procedure | 21.01.2021 | Amendment by applicant (claims and/or description) | 21.01.2021 | Examination requested [2021/09] | 21.01.2021 | Date on which the examining division has become responsible | 03.03.2021 | Despatch of a communication from the examining division (Time limit: M04) | 13.04.2021 | Reply to a communication from the examining division | 29.03.2022 | Communication of intention to grant the patent | 28.06.2022 | Fee for grant paid | 28.06.2022 | Fee for publishing/printing paid | 28.06.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 04.05.2023 | No opposition filed within time limit [2023/28] | Fees paid | Renewal fee | 05.03.2021 | Renewal fee patent year 03 | 15.02.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 03.08.2022 | AT | 03.08.2022 | CZ | 03.08.2022 | DK | 03.08.2022 | EE | 03.08.2022 | ES | 03.08.2022 | FI | 03.08.2022 | HR | 03.08.2022 | LT | 03.08.2022 | LV | 03.08.2022 | MC | 03.08.2022 | NL | 03.08.2022 | RO | 03.08.2022 | RS | 03.08.2022 | SE | 03.08.2022 | SI | 03.08.2022 | SK | 03.08.2022 | SM | 03.08.2022 | NO | 03.11.2022 | GR | 04.11.2022 | IS | 03.12.2022 | PT | 05.12.2022 | GB | 08.03.2023 | IE | 08.03.2023 | LU | 08.03.2023 | CH | 31.03.2023 | FR | 31.03.2023 | LI | 31.03.2023 | [2024/11] |
Former [2024/09] | AL | 03.08.2022 | |
AT | 03.08.2022 | ||
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
EE | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
MC | 03.08.2022 | ||
NL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SI | 03.08.2022 | ||
SK | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
PT | 05.12.2022 | ||
GB | 08.03.2023 | ||
IE | 08.03.2023 | ||
LU | 08.03.2023 | ||
CH | 31.03.2023 | ||
LI | 31.03.2023 | ||
Former [2024/08] | AL | 03.08.2022 | |
AT | 03.08.2022 | ||
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
EE | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
MC | 03.08.2022 | ||
NL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SI | 03.08.2022 | ||
SK | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
PT | 05.12.2022 | ||
GB | 08.03.2023 | ||
IE | 08.03.2023 | ||
LU | 08.03.2023 | ||
Former [2024/02] | AL | 03.08.2022 | |
AT | 03.08.2022 | ||
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
EE | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
MC | 03.08.2022 | ||
NL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SI | 03.08.2022 | ||
SK | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
PT | 05.12.2022 | ||
LU | 08.03.2023 | ||
Former [2023/48] | AL | 03.08.2022 | |
AT | 03.08.2022 | ||
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
EE | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
MC | 03.08.2022 | ||
NL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SI | 03.08.2022 | ||
SK | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
PT | 05.12.2022 | ||
Former [2023/37] | AL | 03.08.2022 | |
AT | 03.08.2022 | ||
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
EE | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SI | 03.08.2022 | ||
SK | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
PT | 05.12.2022 | ||
Former [2023/29] | AL | 03.08.2022 | |
AT | 03.08.2022 | ||
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
EE | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SK | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
PT | 05.12.2022 | ||
Former [2023/23] | AT | 03.08.2022 | |
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
EE | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SK | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
PT | 05.12.2022 | ||
Former [2023/22] | AT | 03.08.2022 | |
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
PT | 05.12.2022 | ||
Former [2023/21] | DK | 03.08.2022 | |
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
PT | 05.12.2022 | ||
Former [2023/20] | ES | 03.08.2022 | |
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
PT | 05.12.2022 | ||
Former [2023/12] | ES | 03.08.2022 | |
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
PT | 05.12.2022 | ||
Former [2023/10] | ES | 03.08.2022 | |
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
PT | 05.12.2022 | ||
Former [2023/09] | ES | 03.08.2022 | |
FI | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
NO | 03.11.2022 | ||
PT | 05.12.2022 | ||
Former [2023/08] | ES | 03.08.2022 | |
FI | 03.08.2022 | ||
LT | 03.08.2022 | ||
NL | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
NO | 03.11.2022 | Documents cited: | Search | [A]AT340620B (VOEST AG [AT]) [A] 1-15* figure 2 *; | [A]JPH03110048 (AKECHI CERAMICS KK) [A] 1-15 * abstract *; | [A]EP1736260 (REFRACTORY INTELLECTUAL PROP [AT]) [A] 1-15 * figure 2 *; | [A]KR20140082497 (POSCO [KR]) [A] 1-15 * figure 1 * | by applicant | EP2067549 | EP2189231 | EP2233227 |