EP3534099 - MODULAR AIR COOLED CONDENSER APPARATUS AND METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 28.05.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 19.06.2020 | ||
Former | Grant of patent is intended Status updated on 18.02.2020 | ||
Former | Request for examination was made Status updated on 25.10.2019 | ||
Former | The application has been published Status updated on 02.08.2019 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states SPG Dry Cooling USA LLC 7401 West 129th Street Overland Park KS 66213 / US | [2019/36] | Inventor(s) | 01 /
VOUCHE, Michel Rue Jumeree 1A 1495 Sart-Dames-Avelines / BE | 02 /
DELEPLANQUE, Christophe Avenue Herbert Hoover 55 1030 Bruxelles / BE | 03 /
FAUCONNIER, Fabien Rue de la Station 109 7070 Le Roeulx / BE | [2019/36] | Representative(s) | ABYOO Centre Monnet Avenue Jean Monnet 1 1348 Louvain-La-Neuve / BE | [2019/36] | Application number, filing date | 19163430.2 | 21.05.2013 | [2019/36] | Priority number, date | US201213478827 | 23.05.2012 Original published format: US201213478827 | [2019/36] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3534099 | Date: | 04.09.2019 | Language: | EN | [2019/36] | Type: | B1 Patent specification | No.: | EP3534099 | Date: | 22.07.2020 | Language: | EN | [2020/30] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.07.2019 | Classification | IPC: | F28B1/06 | [2019/36] | CPC: |
F28B1/06 (EP,CN,US);
F28F9/013 (KR);
B23P15/26 (US);
B23P21/00 (CN);
F28B7/00 (US);
F28B9/00 (CN);
F28B9/02 (US);
F28C3/02 (KR);
F28F1/00 (CN);
Y10T29/4935 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/48] |
Former [2019/36] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VORRICHTUNG UND VERFAHREN FÜR MODULAREN LUFTGEKÜHLTEN KONDENSATOR | [2019/36] | English: | MODULAR AIR COOLED CONDENSER APPARATUS AND METHOD | [2019/36] | French: | APPAREIL ET PROCÉDÉ DE CONDENSEUR REFROIDI PAR AIR MODULAIRE | [2019/36] | Examination procedure | 17.10.2019 | Amendment by applicant (claims and/or description) | 17.10.2019 | Examination requested [2019/48] | 17.10.2019 | Date on which the examining division has become responsible | 19.02.2020 | Communication of intention to grant the patent | 11.06.2020 | Fee for grant paid | 11.06.2020 | Fee for publishing/printing paid | 11.06.2020 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP13168596.8 / EP2667133 | Opposition(s) | 23.04.2021 | No opposition filed within time limit [2021/26] | Fees paid | Renewal fee | 18.03.2019 | Renewal fee patent year 03 | 18.03.2019 | Renewal fee patent year 04 | 18.03.2019 | Renewal fee patent year 05 | 18.03.2019 | Renewal fee patent year 06 | 13.05.2019 | Renewal fee patent year 07 | 12.05.2020 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.05.2013 | AL | 22.07.2020 | AT | 22.07.2020 | CY | 22.07.2020 | CZ | 22.07.2020 | DK | 22.07.2020 | EE | 22.07.2020 | FI | 22.07.2020 | HR | 22.07.2020 | LT | 22.07.2020 | LV | 22.07.2020 | MC | 22.07.2020 | MK | 22.07.2020 | MT | 22.07.2020 | NL | 22.07.2020 | PL | 22.07.2020 | RO | 22.07.2020 | RS | 22.07.2020 | SE | 22.07.2020 | SI | 22.07.2020 | SK | 22.07.2020 | SM | 22.07.2020 | BG | 22.10.2020 | NO | 22.10.2020 | GR | 23.10.2020 | IS | 22.11.2020 | PT | 23.11.2020 | [2024/42] |
Former [2024/23] | HU | 21.05.2013 | |
AL | 22.07.2020 | ||
AT | 22.07.2020 | ||
CY | 22.07.2020 | ||
CZ | 22.07.2020 | ||
DK | 22.07.2020 | ||
EE | 22.07.2020 | ||
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
MC | 22.07.2020 | ||
MK | 22.07.2020 | ||
NL | 22.07.2020 | ||
PL | 22.07.2020 | ||
RO | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
SI | 22.07.2020 | ||
SK | 22.07.2020 | ||
SM | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2023/33] | HU | 21.05.2013 | |
AL | 22.07.2020 | ||
AT | 22.07.2020 | ||
CY | 22.07.2020 | ||
CZ | 22.07.2020 | ||
DK | 22.07.2020 | ||
EE | 22.07.2020 | ||
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
MC | 22.07.2020 | ||
NL | 22.07.2020 | ||
PL | 22.07.2020 | ||
RO | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
SI | 22.07.2020 | ||
SK | 22.07.2020 | ||
SM | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2023/30] | AL | 22.07.2020 | |
AT | 22.07.2020 | ||
CY | 22.07.2020 | ||
CZ | 22.07.2020 | ||
DK | 22.07.2020 | ||
EE | 22.07.2020 | ||
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
MC | 22.07.2020 | ||
NL | 22.07.2020 | ||
PL | 22.07.2020 | ||
RO | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
SI | 22.07.2020 | ||
SK | 22.07.2020 | ||
SM | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2022/07] | AL | 22.07.2020 | |
AT | 22.07.2020 | ||
CZ | 22.07.2020 | ||
DK | 22.07.2020 | ||
EE | 22.07.2020 | ||
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
MC | 22.07.2020 | ||
NL | 22.07.2020 | ||
PL | 22.07.2020 | ||
RO | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
SI | 22.07.2020 | ||
SK | 22.07.2020 | ||
SM | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2021/36] | AL | 22.07.2020 | |
AT | 22.07.2020 | ||
CZ | 22.07.2020 | ||
DK | 22.07.2020 | ||
EE | 22.07.2020 | ||
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
NL | 22.07.2020 | ||
PL | 22.07.2020 | ||
RO | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
SI | 22.07.2020 | ||
SK | 22.07.2020 | ||
SM | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2021/28] | AL | 22.07.2020 | |
AT | 22.07.2020 | ||
CZ | 22.07.2020 | ||
DK | 22.07.2020 | ||
EE | 22.07.2020 | ||
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
NL | 22.07.2020 | ||
PL | 22.07.2020 | ||
RO | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
SK | 22.07.2020 | ||
SM | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2021/25] | AL | 22.07.2020 | |
AT | 22.07.2020 | ||
CZ | 22.07.2020 | ||
DK | 22.07.2020 | ||
EE | 22.07.2020 | ||
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
NL | 22.07.2020 | ||
PL | 22.07.2020 | ||
RO | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
SM | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2021/22] | AT | 22.07.2020 | |
CZ | 22.07.2020 | ||
DK | 22.07.2020 | ||
EE | 22.07.2020 | ||
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
NL | 22.07.2020 | ||
PL | 22.07.2020 | ||
RO | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
SM | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2021/21] | AT | 22.07.2020 | |
DK | 22.07.2020 | ||
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
NL | 22.07.2020 | ||
PL | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2021/17] | AT | 22.07.2020 | |
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
NL | 22.07.2020 | ||
PL | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2021/10] | AT | 22.07.2020 | |
FI | 22.07.2020 | ||
HR | 22.07.2020 | ||
LT | 22.07.2020 | ||
LV | 22.07.2020 | ||
PL | 22.07.2020 | ||
RS | 22.07.2020 | ||
SE | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
IS | 22.11.2020 | ||
PT | 23.11.2020 | ||
Former [2021/09] | AT | 22.07.2020 | |
FI | 22.07.2020 | ||
LT | 22.07.2020 | ||
SE | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
GR | 23.10.2020 | ||
PT | 23.11.2020 | ||
Former [2021/08] | FI | 22.07.2020 | |
LT | 22.07.2020 | ||
SE | 22.07.2020 | ||
BG | 22.10.2020 | ||
NO | 22.10.2020 | ||
PT | 23.11.2020 | ||
Former [2021/07] | FI | 22.07.2020 | |
LT | 22.07.2020 | ||
NO | 22.10.2020 | Documents cited: | Search | [A]GB2017894 (HUDSON PRODUCTS CORP) [A] 1-9 * figure - *; | [Y]US5121613 (COX JIMMY L [US], et al) [Y] 1-9 * figures 1,3,3A *; | [A]EP0553435 (BALCKE DUERR AG [DE]) [A] 1-9 * figure 1 *; | [A]DE202005005302U (SPX COOLING TECHNOLOGIES GMBH [DE]) [A] 1-9 * figure - *; | [Y]CN101091098 (GEA ENERGIETECHNIK GMBH [DE]) [Y] 1-9 * figures 1,2 *; | [A]US2009165993 (YANG JIDONG [US], et al) [A] 1-9 * figures -t *; | [A]US2010263840 (NOBEL ARIE M [US]) [A] 1-9* figure - * |