blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3549776

EP3549776 - PRINTING APPARATUS AND MEDIUM CONVEYANCE METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.01.2022
Database last updated on 24.07.2024
FormerThe patent has been granted
Status updated on  12.02.2021
FormerGrant of patent is intended
Status updated on  08.10.2020
FormerRequest for examination was made
Status updated on  21.02.2020
FormerThe application has been published
Status updated on  06.09.2019
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Seiko Epson Corporation
1-6, Shinjuku 4-chome
Shinjuku-ku
Tokyo 160-8801 / JP
[2019/41]
Inventor(s)01 / YAMASHITA, Takahiro
c/o Seiko Epson Corporation
3-5 Owa 3-chome
Suwa-shi, Nagano 392-8502 / JP
02 / SASAKI, Tsutomu
c/o Seiko Epson Corporation
3-5 Owa 3-chome
Suwa-shi, Nagano 392-8502 / JP
 [2019/41]
Representative(s)Miller Sturt Kenyon
9 John Street
London WC1N 2ES / GB
[2019/41]
Application number, filing date19163496.318.03.2019
[2019/41]
Priority number, dateJP2018005103919.03.2018         Original published format: JP 2018051039
[2019/41]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3549776
Date:09.10.2019
Language:EN
[2019/41]
Type: B1 Patent specification 
No.:EP3549776
Date:17.03.2021
Language:EN
[2021/11]
Search report(s)(Supplementary) European search report - dispatched on:EP11.09.2019
ClassificationIPC:B41J11/00, B41J3/407, B41J11/42
[2019/41]
CPC:
B41J11/007 (EP,US); B41J11/04 (US); B41J11/0045 (CN);
B41J11/42 (EP,US); B41J13/02 (CN); B41J15/046 (CN);
B41J3/4078 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/13]
Former [2019/41]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:DRUCKVORRICHTUNG UND MEDIUMFÖRDERVERFAHREN[2019/41]
English:PRINTING APPARATUS AND MEDIUM CONVEYANCE METHOD[2019/41]
French:IMPRIMANTE ET PROCÉDÉ DE TRANSPORT DE SUPPORTS[2019/41]
Examination procedure13.02.2020Examination requested  [2020/13]
13.02.2020Date on which the examining division has become responsible
09.10.2020Communication of intention to grant the patent
04.02.2021Fee for grant paid
04.02.2021Fee for publishing/printing paid
04.02.2021Receipt of the translation of the claim(s)
Opposition(s)20.12.2021No opposition filed within time limit [2022/08]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.03.2019
AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
MK17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
TR17.03.2021
IE18.03.2021
LU18.03.2021
BE31.03.2021
FR17.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
[2024/29]
Former [2024/23]HU18.03.2019
AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
MK17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE18.03.2021
LU18.03.2021
BE31.03.2021
FR17.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2023/33]HU18.03.2019
AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE18.03.2021
LU18.03.2021
BE31.03.2021
FR17.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2023/30]AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE18.03.2021
LU18.03.2021
BE31.03.2021
FR17.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/34]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE18.03.2021
LU18.03.2021
BE31.03.2021
FR17.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/23]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE18.03.2021
LU18.03.2021
FR17.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/13]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE18.03.2021
LU18.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2022/10]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
IE18.03.2021
LU18.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2022/08]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
IE18.03.2021
LU18.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/07]AL17.03.2021
AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
IE18.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2021/52]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2021/51]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2021/50]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2021/48]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RS17.03.2021
SE17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/46]AT17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RS17.03.2021
SE17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/43]FI17.03.2021
HR17.03.2021
LV17.03.2021
NL17.03.2021
RS17.03.2021
SE17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/38]FI17.03.2021
HR17.03.2021
LV17.03.2021
RS17.03.2021
SE17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/37]FI17.03.2021
HR17.03.2021
LV17.03.2021
RS17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/36]FI17.03.2021
HR17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/35]FI17.03.2021
HR17.03.2021
NO17.06.2021
Former [2021/33]FI17.03.2021
NO17.06.2021
Documents cited:Search[AD]JP2012116093  (KONICA MINOLTA IJ TECHNOLOGIES) [AD] 1-9 * paragraph [0041] - paragraph [0042]; figure 1 ** paragraph [0011] - paragraph [0012] *
by applicantJP2012116093
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.