EP3549776 - PRINTING APPARATUS AND MEDIUM CONVEYANCE METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.01.2022 Database last updated on 24.07.2024 | |
Former | The patent has been granted Status updated on 12.02.2021 | ||
Former | Grant of patent is intended Status updated on 08.10.2020 | ||
Former | Request for examination was made Status updated on 21.02.2020 | ||
Former | The application has been published Status updated on 06.09.2019 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Seiko Epson Corporation 1-6, Shinjuku 4-chome Shinjuku-ku Tokyo 160-8801 / JP | [2019/41] | Inventor(s) | 01 /
YAMASHITA, Takahiro c/o Seiko Epson Corporation 3-5 Owa 3-chome Suwa-shi, Nagano 392-8502 / JP | 02 /
SASAKI, Tsutomu c/o Seiko Epson Corporation 3-5 Owa 3-chome Suwa-shi, Nagano 392-8502 / JP | [2019/41] | Representative(s) | Miller Sturt Kenyon 9 John Street London WC1N 2ES / GB | [2019/41] | Application number, filing date | 19163496.3 | 18.03.2019 | [2019/41] | Priority number, date | JP20180051039 | 19.03.2018 Original published format: JP 2018051039 | [2019/41] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3549776 | Date: | 09.10.2019 | Language: | EN | [2019/41] | Type: | B1 Patent specification | No.: | EP3549776 | Date: | 17.03.2021 | Language: | EN | [2021/11] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 11.09.2019 | Classification | IPC: | B41J11/00, B41J3/407, B41J11/42 | [2019/41] | CPC: |
B41J11/007 (EP,US);
B41J11/04 (US);
B41J11/0045 (CN);
B41J11/42 (EP,US);
B41J13/02 (CN);
B41J15/046 (CN);
B41J3/4078 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/13] |
Former [2019/41] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | DRUCKVORRICHTUNG UND MEDIUMFÖRDERVERFAHREN | [2019/41] | English: | PRINTING APPARATUS AND MEDIUM CONVEYANCE METHOD | [2019/41] | French: | IMPRIMANTE ET PROCÉDÉ DE TRANSPORT DE SUPPORTS | [2019/41] | Examination procedure | 13.02.2020 | Examination requested [2020/13] | 13.02.2020 | Date on which the examining division has become responsible | 09.10.2020 | Communication of intention to grant the patent | 04.02.2021 | Fee for grant paid | 04.02.2021 | Fee for publishing/printing paid | 04.02.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 20.12.2021 | No opposition filed within time limit [2022/08] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.03.2019 | AL | 17.03.2021 | AT | 17.03.2021 | CY | 17.03.2021 | CZ | 17.03.2021 | DK | 17.03.2021 | EE | 17.03.2021 | ES | 17.03.2021 | FI | 17.03.2021 | HR | 17.03.2021 | IT | 17.03.2021 | LT | 17.03.2021 | LV | 17.03.2021 | MC | 17.03.2021 | MK | 17.03.2021 | NL | 17.03.2021 | PL | 17.03.2021 | RO | 17.03.2021 | RS | 17.03.2021 | SE | 17.03.2021 | SI | 17.03.2021 | SK | 17.03.2021 | SM | 17.03.2021 | TR | 17.03.2021 | IE | 18.03.2021 | LU | 18.03.2021 | BE | 31.03.2021 | FR | 17.05.2021 | BG | 17.06.2021 | NO | 17.06.2021 | GR | 18.06.2021 | IS | 17.07.2021 | PT | 19.07.2021 | [2024/29] |
Former [2024/23] | HU | 18.03.2019 | |
AL | 17.03.2021 | ||
AT | 17.03.2021 | ||
CY | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
MK | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
IE | 18.03.2021 | ||
LU | 18.03.2021 | ||
BE | 31.03.2021 | ||
FR | 17.05.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2023/33] | HU | 18.03.2019 | |
AL | 17.03.2021 | ||
AT | 17.03.2021 | ||
CY | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
IE | 18.03.2021 | ||
LU | 18.03.2021 | ||
BE | 31.03.2021 | ||
FR | 17.05.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2023/30] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CY | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
IE | 18.03.2021 | ||
LU | 18.03.2021 | ||
BE | 31.03.2021 | ||
FR | 17.05.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2022/34] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
IE | 18.03.2021 | ||
LU | 18.03.2021 | ||
BE | 31.03.2021 | ||
FR | 17.05.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2022/23] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
IE | 18.03.2021 | ||
LU | 18.03.2021 | ||
FR | 17.05.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2022/13] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
IE | 18.03.2021 | ||
LU | 18.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
PT | 19.07.2021 | ||
Former [2022/10] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
IE | 18.03.2021 | ||
LU | 18.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
PT | 19.07.2021 | ||
Former [2022/08] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
IE | 18.03.2021 | ||
LU | 18.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2022/07] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
IE | 18.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2021/52] | AT | 17.03.2021 | |
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2021/51] | AT | 17.03.2021 | |
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2021/50] | AT | 17.03.2021 | |
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
PT | 19.07.2021 | ||
Former [2021/48] | AT | 17.03.2021 | |
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/46] | AT | 17.03.2021 | |
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/43] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/38] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
LV | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/37] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
LV | 17.03.2021 | ||
RS | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/36] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/35] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
NO | 17.06.2021 | ||
Former [2021/33] | FI | 17.03.2021 | |
NO | 17.06.2021 | Documents cited: | Search | [AD]JP2012116093 (KONICA MINOLTA IJ TECHNOLOGIES) [AD] 1-9 * paragraph [0041] - paragraph [0042]; figure 1 ** paragraph [0011] - paragraph [0012] * | by applicant | JP2012116093 |