blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3552788

EP3552788 - MIXING APPARATUS FOR WET OR DRY MATERIALS, IN PARTICULAR COMPONENTS FOR MANUFACTURING CONCRETE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  25.06.2021
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  17.07.2020
FormerGrant of patent is intended
Status updated on  20.01.2020
FormerRequest for examination was made
Status updated on  05.12.2019
FormerThe application has been published
Status updated on  13.09.2019
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Skako Concrete A/S
Bygmestervej 2
5600 Faaborg / DK
[2020/34]
Former [2020/24]For all designated states
Skako Concrete A/S
Bygmestervej 2
5600 Faaborg / DK
Former [2019/42]For all designated states
Skako Concrete
Rue des Séquoias
Parc d' Activité du Mélantois
59810 Lesquin / FR
Inventor(s)01 / AALBORG NIELSEN, Jens
Blåhøj 21
7000 FREDERICIA / DK
02 / BRUNQUET, Eric
17 rue Robert Diers
62840 FLEURBAIX / FR
 [2019/42]
Representative(s)Zacco Denmark A/S
Arne Jacobsens Allé 15
2300 Copenhagen S / DK
[2020/34]
Former [2019/42]Bureau Duthoit Legros Associés
31 rue des Poissonceaux
CS 40009
59044 Lille Cedex / FR
Application number, filing date19165308.826.03.2019
[2019/42]
Priority number, dateFR2018005305809.04.2018         Original published format: FR 1853058
[2019/42]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP3552788
Date:16.10.2019
Language:FR
[2019/42]
Type: B1 Patent specification 
No.:EP3552788
Date:19.08.2020
Language:FR
[2020/34]
Search report(s)(Supplementary) European search report - dispatched on:EP06.09.2019
ClassificationIPC:B28C5/08, B01F7/30, B28C5/16
[2019/42]
CPC:
B28C5/168 (EP); B01F27/95 (EP); B28C5/0818 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/01]
Former [2019/42]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:MISCHGERÄT FÜR FEUCHTE ODER TROCKENE MATERIALIEN, INSBESONDERE KOMPONENTEN FÜR DIE BETONHERSTELLUNG[2019/42]
English:MIXING APPARATUS FOR WET OR DRY MATERIALS, IN PARTICULAR COMPONENTS FOR MANUFACTURING CONCRETE[2019/42]
French:APPAREIL DE MALAXAGE POUR MATERIAUX HUMIDES OU SECS, NOTAMMENT DE COMPOSANTS POUR LA FABRICATION DE BETON[2019/42]
Examination procedure27.11.2019Examination requested  [2020/01]
27.11.2019Date on which the examining division has become responsible
21.01.2020Communication of intention to grant the patent
13.05.2020Receipt of the translation of the claim(s)
19.05.2020Fee for grant paid
19.05.2020Fee for publishing/printing paid
Opposition(s)20.05.2021No opposition filed within time limit [2021/30]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU26.03.2019
AL19.08.2020
AT19.08.2020
CY19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
ES19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
MK19.08.2020
MT19.08.2020
NL19.08.2020
PL19.08.2020
RO19.08.2020
RS19.08.2020
SE19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
IE26.03.2021
LU26.03.2021
BE31.03.2021
[2024/42]
Former [2024/23]HU26.03.2019
AL19.08.2020
AT19.08.2020
CY19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
ES19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
MK19.08.2020
NL19.08.2020
PL19.08.2020
RO19.08.2020
RS19.08.2020
SE19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
IE26.03.2021
LU26.03.2021
BE31.03.2021
Former [2023/33]HU26.03.2019
AL19.08.2020
AT19.08.2020
CY19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
ES19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
NL19.08.2020
PL19.08.2020
RO19.08.2020
RS19.08.2020
SE19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
IE26.03.2021
LU26.03.2021
BE31.03.2021
Former [2023/30]AL19.08.2020
AT19.08.2020
CY19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
ES19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
NL19.08.2020
PL19.08.2020
RO19.08.2020
RS19.08.2020
SE19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
IE26.03.2021
LU26.03.2021
BE31.03.2021
Former [2022/34]AL19.08.2020
AT19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
ES19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
NL19.08.2020
PL19.08.2020
RO19.08.2020
RS19.08.2020
SE19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
IE26.03.2021
LU26.03.2021
BE31.03.2021
Former [2022/09]AL19.08.2020
AT19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
ES19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
NL19.08.2020
PL19.08.2020
RO19.08.2020
RS19.08.2020
SE19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
IE26.03.2021
LU26.03.2021
Former [2022/07]AL19.08.2020
AT19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
ES19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
NL19.08.2020
PL19.08.2020
RO19.08.2020
RS19.08.2020
SE19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
IE26.03.2021
Former [2021/45]AL19.08.2020
AT19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
ES19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
MC19.08.2020
NL19.08.2020
PL19.08.2020
RO19.08.2020
RS19.08.2020
SE19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/36]AL19.08.2020
AT19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
ES19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
NL19.08.2020
PL19.08.2020
RO19.08.2020
RS19.08.2020
SE19.08.2020
SI19.08.2020
SK19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/28]AL19.08.2020
AT19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
ES19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
NL19.08.2020
PL19.08.2020
RO19.08.2020
RS19.08.2020
SE19.08.2020
SK19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/25]AL19.08.2020
AT19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
ES19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
NL19.08.2020
PL19.08.2020
RO19.08.2020
RS19.08.2020
SE19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/23]AT19.08.2020
CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
NL19.08.2020
PL19.08.2020
RO19.08.2020
RS19.08.2020
SE19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/22]CZ19.08.2020
DK19.08.2020
EE19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
NL19.08.2020
PL19.08.2020
RO19.08.2020
RS19.08.2020
SE19.08.2020
SM19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/21]DK19.08.2020
FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
NL19.08.2020
PL19.08.2020
RS19.08.2020
SE19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/12]FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
NL19.08.2020
PL19.08.2020
RS19.08.2020
SE19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/10]FI19.08.2020
HR19.08.2020
LT19.08.2020
LV19.08.2020
PL19.08.2020
RS19.08.2020
SE19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
IS19.12.2020
PT21.12.2020
Former [2021/09]FI19.08.2020
LT19.08.2020
SE19.08.2020
BG19.11.2020
NO19.11.2020
GR20.11.2020
PT21.12.2020
Former [2021/08]FI19.08.2020
LT19.08.2020
SE19.08.2020
BG19.11.2020
NO19.11.2020
PT21.12.2020
Former [2021/07]FI19.08.2020
LT19.08.2020
NO19.11.2020
Documents cited:Search[A]FR2527939  (COUVROT LAINE CIE [FR]) [A] 1-11 * figures 1,2 * * page 4, lines 11-16 * * page 4, line 35 - page 5, line 14 *;
 [A]DE102008033644  (ELBA WERK MASCHINEN GMBH & CO [DE]) [A] 1-11 * figures 1-4 ** paragraphs [0026] - [0031] *;
 [A]DE102014008067  (AMMANN ELBA BETON GMBH [DE]) [A] 1-11 * figures 1-4 * * paragraphs [0023] , [0024] , [0027] , [0028] , [0029] , [0030] , [0035] - [0038] *
by applicantFR2527939
 WO9511120
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.