| EP3552945 - UNDERWATER VEHICLE COMPRISING A LOCKABLE FLAP [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.10.2025 Database last updated on 18.03.2026 | |
| Former | The patent has been granted Status updated on 01.11.2024 | ||
| Former | Grant of patent is intended Status updated on 04.07.2024 | ||
| Former | Examination is in progress Status updated on 08.10.2021 | ||
| Former | Request for examination was made Status updated on 24.04.2020 | ||
| Former | The application has been published Status updated on 13.09.2019 | Most recent event Tooltip | 23.01.2026 | Lapse of the patent in a contracting state New state(s): BE, CH | published on 25.02.2026 [2026/09] | Applicant(s) | For all designated states thyssenkrupp Marine Systems GmbH Werftstraße 112-114 24143 Kiel / DE | For all designated states thyssenkrupp AG ThyssenKrupp Allee 1 45143 Essen / DE | [2021/10] |
| Former [2019/42] | For all designated states thyssenkrupp Marine Systems GmbH Werftstraße 112-114 24143 Kiel / DE | ||
| For all designated states thyssenkrupp AG Thyssenkrupp Allee 1 45143 Essen / DE | Inventor(s) | 01 /
Jenk, Eric Klosterkamp 15 24232 Schönkirchen / DE | [2019/42] | Representative(s) | thyssenkrupp Intellectual Property GmbH ThyssenKrupp Allee 1 45143 Essen / DE | [2019/42] | Application number, filing date | 19166966.2 | 03.04.2019 | [2019/42] | Priority number, date | DE201810205487 | 11.04.2018 Original published format: DE102018205487 | [2019/42] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3552945 | Date: | 16.10.2019 | Language: | DE | [2019/42] | Type: | B1 Patent specification | No.: | EP3552945 | Date: | 04.12.2024 | Language: | DE | [2024/49] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 24.07.2019 | Classification | IPC: | B63B19/08, B63B3/13, B63G8/00, // B63G8/41, B63B19/14 | [2019/42] | CPC: |
B63B3/13 (EP);
B63B19/08 (EP);
B63G8/00 (EP);
B63B19/14 (EP);
B63G8/41 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/22] |
| Former [2019/42] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | UNTERWASSERFAHRZEUG MIT EINER ARRETIERBAREN KLAPPE | [2019/42] | English: | UNDERWATER VEHICLE COMPRISING A LOCKABLE FLAP | [2019/42] | French: | VÉHICULE SOUS-MARIN DOTÉ D'UN VOLET POUVANT ÊTRE BLOQUÉ | [2019/42] | Examination procedure | 18.03.2020 | Amendment by applicant (claims and/or description) | 16.04.2020 | Examination requested [2020/22] | 16.04.2020 | Date on which the examining division has become responsible | 22.10.2021 | Despatch of a communication from the examining division (Time limit: M06) | 21.03.2022 | Reply to a communication from the examining division | 10.07.2023 | Despatch of a communication from the examining division (Time limit: M02) | 28.08.2023 | Reply to a communication from the examining division | 05.07.2024 | Communication of intention to grant the patent | 21.10.2024 | Fee for grant paid | 21.10.2024 | Fee for publishing/printing paid | 21.10.2024 | Receipt of the translation of the claim(s) | Opposition(s) | 05.09.2025 | No opposition filed within time limit [2025/46] | Fees paid | Renewal fee | 29.04.2021 | Renewal fee patent year 03 | 25.03.2022 | Renewal fee patent year 04 | 25.04.2023 | Renewal fee patent year 05 | 24.04.2024 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | BG | 04.12.2024 | CZ | 04.12.2024 | DK | 04.12.2024 | EE | 04.12.2024 | ES | 04.12.2024 | FI | 04.12.2024 | HR | 04.12.2024 | IT | 04.12.2024 | LV | 04.12.2024 | MC | 04.12.2024 | NL | 04.12.2024 | PL | 04.12.2024 | RO | 04.12.2024 | SE | 04.12.2024 | SK | 04.12.2024 | SM | 04.12.2024 | NO | 04.03.2025 | RS | 04.03.2025 | GR | 05.03.2025 | GB | 03.04.2025 | LU | 03.04.2025 | IS | 04.04.2025 | PT | 04.04.2025 | BE | 30.04.2025 | CH | 30.04.2025 | [2026/09] |
| Former [2026/08] | BG | 04.12.2024 | |
| CZ | 04.12.2024 | ||
| DK | 04.12.2024 | ||
| EE | 04.12.2024 | ||
| ES | 04.12.2024 | ||
| FI | 04.12.2024 | ||
| HR | 04.12.2024 | ||
| IT | 04.12.2024 | ||
| LV | 04.12.2024 | ||
| MC | 04.12.2024 | ||
| NL | 04.12.2024 | ||
| PL | 04.12.2024 | ||
| RO | 04.12.2024 | ||
| SE | 04.12.2024 | ||
| SK | 04.12.2024 | ||
| SM | 04.12.2024 | ||
| NO | 04.03.2025 | ||
| RS | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| GB | 03.04.2025 | ||
| LU | 03.04.2025 | ||
| IS | 04.04.2025 | ||
| PT | 04.04.2025 | ||
| Former [2026/05] | BG | 04.12.2024 | |
| CZ | 04.12.2024 | ||
| DK | 04.12.2024 | ||
| EE | 04.12.2024 | ||
| ES | 04.12.2024 | ||
| FI | 04.12.2024 | ||
| HR | 04.12.2024 | ||
| IT | 04.12.2024 | ||
| LV | 04.12.2024 | ||
| MC | 04.12.2024 | ||
| NL | 04.12.2024 | ||
| PL | 04.12.2024 | ||
| RO | 04.12.2024 | ||
| SE | 04.12.2024 | ||
| SK | 04.12.2024 | ||
| SM | 04.12.2024 | ||
| NO | 04.03.2025 | ||
| RS | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| LU | 03.04.2025 | ||
| IS | 04.04.2025 | ||
| PT | 04.04.2025 | ||
| Former [2026/04] | BG | 04.12.2024 | |
| CZ | 04.12.2024 | ||
| DK | 04.12.2024 | ||
| EE | 04.12.2024 | ||
| ES | 04.12.2024 | ||
| FI | 04.12.2024 | ||
| HR | 04.12.2024 | ||
| IT | 04.12.2024 | ||
| LV | 04.12.2024 | ||
| NL | 04.12.2024 | ||
| PL | 04.12.2024 | ||
| RO | 04.12.2024 | ||
| SE | 04.12.2024 | ||
| SK | 04.12.2024 | ||
| SM | 04.12.2024 | ||
| NO | 04.03.2025 | ||
| RS | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| LU | 03.04.2025 | ||
| IS | 04.04.2025 | ||
| PT | 04.04.2025 | ||
| Former [2025/47] | BG | 04.12.2024 | |
| CZ | 04.12.2024 | ||
| DK | 04.12.2024 | ||
| EE | 04.12.2024 | ||
| ES | 04.12.2024 | ||
| FI | 04.12.2024 | ||
| HR | 04.12.2024 | ||
| IT | 04.12.2024 | ||
| LV | 04.12.2024 | ||
| NL | 04.12.2024 | ||
| PL | 04.12.2024 | ||
| RO | 04.12.2024 | ||
| SE | 04.12.2024 | ||
| SK | 04.12.2024 | ||
| SM | 04.12.2024 | ||
| NO | 04.03.2025 | ||
| RS | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| IS | 04.04.2025 | ||
| PT | 04.04.2025 | ||
| Former [2025/42] | BG | 04.12.2024 | |
| CZ | 04.12.2024 | ||
| EE | 04.12.2024 | ||
| ES | 04.12.2024 | ||
| FI | 04.12.2024 | ||
| HR | 04.12.2024 | ||
| IT | 04.12.2024 | ||
| LV | 04.12.2024 | ||
| NL | 04.12.2024 | ||
| PL | 04.12.2024 | ||
| RO | 04.12.2024 | ||
| SE | 04.12.2024 | ||
| SK | 04.12.2024 | ||
| SM | 04.12.2024 | ||
| NO | 04.03.2025 | ||
| RS | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| IS | 04.04.2025 | ||
| PT | 04.04.2025 | ||
| Former [2025/36] | BG | 04.12.2024 | |
| CZ | 04.12.2024 | ||
| EE | 04.12.2024 | ||
| ES | 04.12.2024 | ||
| FI | 04.12.2024 | ||
| HR | 04.12.2024 | ||
| IT | 04.12.2024 | ||
| LV | 04.12.2024 | ||
| NL | 04.12.2024 | ||
| PL | 04.12.2024 | ||
| RO | 04.12.2024 | ||
| SK | 04.12.2024 | ||
| SM | 04.12.2024 | ||
| NO | 04.03.2025 | ||
| RS | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| IS | 04.04.2025 | ||
| PT | 04.04.2025 | ||
| Former [2025/35] | BG | 04.12.2024 | |
| EE | 04.12.2024 | ||
| ES | 04.12.2024 | ||
| FI | 04.12.2024 | ||
| HR | 04.12.2024 | ||
| LV | 04.12.2024 | ||
| NL | 04.12.2024 | ||
| PL | 04.12.2024 | ||
| RO | 04.12.2024 | ||
| SM | 04.12.2024 | ||
| NO | 04.03.2025 | ||
| RS | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| IS | 04.04.2025 | ||
| PT | 04.04.2025 | ||
| Former [2025/34] | BG | 04.12.2024 | |
| ES | 04.12.2024 | ||
| FI | 04.12.2024 | ||
| HR | 04.12.2024 | ||
| LV | 04.12.2024 | ||
| NL | 04.12.2024 | ||
| PL | 04.12.2024 | ||
| SM | 04.12.2024 | ||
| NO | 04.03.2025 | ||
| RS | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| IS | 04.04.2025 | ||
| PT | 04.04.2025 | ||
| Former [2025/33] | BG | 04.12.2024 | |
| ES | 04.12.2024 | ||
| FI | 04.12.2024 | ||
| HR | 04.12.2024 | ||
| LV | 04.12.2024 | ||
| NL | 04.12.2024 | ||
| PL | 04.12.2024 | ||
| SM | 04.12.2024 | ||
| NO | 04.03.2025 | ||
| RS | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| Former [2025/32] | BG | 04.12.2024 | |
| ES | 04.12.2024 | ||
| FI | 04.12.2024 | ||
| HR | 04.12.2024 | ||
| LV | 04.12.2024 | ||
| NL | 04.12.2024 | ||
| SM | 04.12.2024 | ||
| NO | 04.03.2025 | ||
| RS | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| Former [2025/25] | BG | 04.12.2024 | |
| ES | 04.12.2024 | ||
| FI | 04.12.2024 | ||
| HR | 04.12.2024 | ||
| LV | 04.12.2024 | ||
| NL | 04.12.2024 | ||
| NO | 04.03.2025 | ||
| RS | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| Former [2025/23] | BG | 04.12.2024 | |
| ES | 04.12.2024 | ||
| FI | 04.12.2024 | ||
| HR | 04.12.2024 | ||
| LV | 04.12.2024 | ||
| NO | 04.03.2025 | ||
| RS | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| Former [2025/22] | BG | 04.12.2024 | |
| ES | 04.12.2024 | ||
| FI | 04.12.2024 | ||
| HR | 04.12.2024 | ||
| LV | 04.12.2024 | ||
| NO | 04.03.2025 | ||
| GR | 05.03.2025 | ||
| Former [2025/21] | BG | 04.12.2024 | |
| ES | 04.12.2024 | ||
| FI | 04.12.2024 | ||
| HR | 04.12.2024 | Documents cited: | Search | [XI] DE202006004805 (HOWALDTSWERKE DEUTSCHE WERFT et al.) | [XI] DE102007041724 (HOWALDTSWERKE DEUTSCHE WERFT et al.) [X] 1,3,5 * paragraph [0024] - paragraph [0029] * * figures 1 - 3 *[I] 13 | [XY] US3051280 (BURTON BERGMAN et al.) [X] 1,2,4-8 * paragraphs [0035] , [0 36] * * figures 4, 6 *[Y] 9-12 | [Y] CN201834177 (WUXI DONGZHOU MARINE FITTINGS et al.) [Y] 9-12 * column 5, line 31 - line 41 * * figures 1, 2, 10 * | Examination | DE202006004805 |