blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3719207

EP3719207 - UNDERGROUND WALL MILLING DEVICE AND METHOD FOR CREATING A MILLED SLIT IN THE GROUND [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.01.2023
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  18.02.2022
FormerGrant of patent is intended
Status updated on  15.12.2021
FormerRequest for examination was made
Status updated on  04.09.2020
Most recent event   Tooltip27.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 30.10.2024 [2024/44]
Applicant(s)For all designated states
BAUER Maschinen GmbH
BAUER-Str. 1
86529 Schrobenhausen / DE
[2020/41]
Inventor(s)01 / WEIXLER, Leonhard
Michael-Maier-Str. 16
86672 Thierhaupten / DE
02 / FINKENZELLER, Stefan
Bachhäcker 9
85084 Reichertshofen / DE
03 / HERRMANN, Christian
Erzgebirgsstr. 6
86551 Aichach / DE
04 / PLATZEK, Peter
An der Weilach 20
86529 Schrobenhausen / DE
 [2020/41]
Representative(s)Wunderlich & Heim Patentanwälte PartG mbB
Irmgardstraße 3
81479 München / DE
[N/P]
Former [2022/12]Wunderlich & Heim Patentanwälte Partnerschaftsgesellschaft mbB
Irmgardstraße 3
81479 München / DE
Former [2020/41]Wunderlich & Heim Patentanwälte Partnerschaftsgesellschaft mbB
Irmgardstrasse 3
81479 München / DE
Application number, filing date19167353.204.04.2019
[2020/41]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3719207
Date:07.10.2020
Language:DE
[2020/41]
Type: B1 Patent specification 
No.:EP3719207
Date:23.03.2022
Language:DE
[2022/12]
Search report(s)(Supplementary) European search report - dispatched on:EP16.10.2019
ClassificationIPC:E02D17/13, E02F3/20
[2020/41]
CPC:
E02D17/13 (EP,KR); E02F3/205 (EP,KR,US); E02F9/2045 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/41]
TitleGerman:SCHLITZWANDFRÄSVORRICHTUNG UND VERFAHREN ZUM FRÄSEN EINES FRÄSSCHLITZES IM BODEN[2020/41]
English:UNDERGROUND WALL MILLING DEVICE AND METHOD FOR CREATING A MILLED SLIT IN THE GROUND[2020/41]
French:DISPOSITIF DE FRAISAGE D'UNE FOUILLE DE FONDATION ET PROCÉDÉ DE FRAISAGE D'UNE FOUILLE DANS LE SOL[2020/41]
Examination procedure19.11.2019Examination requested  [2020/41]
19.11.2019Date on which the examining division has become responsible
16.01.2020Amendment by applicant (claims and/or description)
16.12.2021Communication of intention to grant the patent
09.02.2022Fee for grant paid
09.02.2022Fee for publishing/printing paid
09.02.2022Receipt of the translation of the claim(s)
Opposition(s)02.01.2023No opposition filed within time limit [2023/09]
Fees paidRenewal fee
27.04.2021Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.04.2019
AL23.03.2022
CY23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
MK23.03.2022
MT23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
IE04.04.2022
LU04.04.2022
CH30.04.2022
LI30.04.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
[2024/44]
Former [2024/25]HU04.04.2019
AL23.03.2022
CY23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
MK23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
IE04.04.2022
LU04.04.2022
CH30.04.2022
LI30.04.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2024/23]AL23.03.2022
CY23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
MK23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
IE04.04.2022
LU04.04.2022
CH30.04.2022
LI30.04.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2024/20]AL23.03.2022
CY23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
IE04.04.2022
LU04.04.2022
CH30.04.2022
LI30.04.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/25]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
IE04.04.2022
LU04.04.2022
CH30.04.2022
LI30.04.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/20]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
IE04.04.2022
LU04.04.2022
CH30.04.2022
LI30.04.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/09]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
LU04.04.2022
CH30.04.2022
LI30.04.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/08]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
LU04.04.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/07]AL23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/06]AL23.03.2022
CZ23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/01]AL23.03.2022
CZ23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2022/51]CZ23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2022/50]CZ23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/49]CZ23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/48]CZ23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/47]FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/44]FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
Former [2022/39]FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
Former [2022/36]HR23.03.2022
LT23.03.2022
LV23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
Former [2022/35]HR23.03.2022
LT23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
Former [2022/33]LT23.03.2022
NO23.06.2022
Documents cited:Search[XA]FR2573475  (SOLETANCHE [FR]) [X] 11 * abstract *[A] 1-10,12-15;
 [XDA]EP0518297  (BAUER SPEZIALTIEFBAU [DE]) [XD] 11 * column 3, lines 10-22; figure 1 * [A] 1-10,12-15;
 [XDA]DE602004008375T  (CIE DU SOL [FR]) [XD] 11,12 * paragraphs [0025] - [0033]; figures 1,2,4 * [A] 1-10,13-15;
 [XDA]EP3208384  (BAUER MASCHINEN GMBH [DE]) [XD] 11 * paragraph [0014]; figure 1 * [A] 1-10,12-15
by applicantEP0518297
 DE102004013790
 DE602004008375T
 EP3208384
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.