blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3722599

EP3722599 - ELECTROMAGNETIC GROUNDING ARRANGEMENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.08.2023
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  26.08.2022
FormerGrant of patent is intended
Status updated on  03.05.2022
FormerRequest for examination was made
Status updated on  06.11.2020
FormerThe application has been published
Status updated on  11.09.2020
Most recent event   Tooltip24.05.2024Lapse of the patent in a contracting state
New state(s): IT
published on 26.06.2024  [2024/26]
Applicant(s)For all designated states
Siemens Gamesa Renewable Energy A/S
Borupvej 16
7330 Brande / DK
[2020/42]
Inventor(s)01 / Jensen, Henrik Abild
Toftevej 9
8800 Viborg / DK
 [2020/42]
Representative(s)SGRE-Association
Siemens Energy Global GmbH & Co. KG
SE I IM P Intellectual Property
Siemenspromenade 9
91058 Erlangen / DE
[N/P]
Former [2022/39]SGRE-Association
Siemens Gamesa Renewable
Energy GmbH & Co KG
Schlierseestraße 28
81539 München / DE
Former [2020/42]Aspacher, Karl-Georg
Siemens Gamesa Renewable Energy GmbH & Co. KG
Otto-Hahn-Ring 6
81739 München / DE
Application number, filing date19168180.809.04.2019
[2020/42]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3722599
Date:14.10.2020
Language:EN
[2020/42]
Type: B1 Patent specification 
No.:EP3722599
Date:28.09.2022
Language:EN
[2022/39]
Search report(s)(Supplementary) European search report - dispatched on:EP22.10.2019
ClassificationIPC:F03D13/20, F03D80/80, H02G13/00
[2020/42]
CPC:
F03D13/22 (EP,US); F03D80/82 (CN); H01R4/66 (CN,US);
E02D27/425 (US); F03D80/85 (EP); H01B13/0036 (US);
H01B9/02 (US); H02G13/40 (EP); Y02E10/728 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/50]
Former [2020/42]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ELEKTROMAGNETISCHE ERDUNGSANORDNUNG[2020/42]
English:ELECTROMAGNETIC GROUNDING ARRANGEMENT[2020/42]
French:AGENCEMENT DE MISE À LA TERRE ÉLECTROMAGNÉTIQUE[2020/42]
Examination procedure30.10.2020Amendment by applicant (claims and/or description)
03.11.2020Examination requested  [2020/50]
03.11.2020Date on which the examining division has become responsible
04.05.2022Communication of intention to grant the patent
22.08.2022Fee for grant paid
22.08.2022Fee for publishing/printing paid
22.08.2022Receipt of the translation of the claim(s)
Opposition(s)29.06.2023No opposition filed within time limit [2023/36]
Fees paidRenewal fee
19.04.2021Renewal fee patent year 03
02.05.2022Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL28.09.2022
AT28.09.2022
CZ28.09.2022
DK28.09.2022
EE28.09.2022
ES28.09.2022
FI28.09.2022
HR28.09.2022
IT28.09.2022
LT28.09.2022
LV28.09.2022
MC28.09.2022
NL28.09.2022
PL28.09.2022
RO28.09.2022
RS28.09.2022
SE28.09.2022
SI28.09.2022
SK28.09.2022
SM28.09.2022
NO28.12.2022
GR29.12.2022
IS28.01.2023
PT30.01.2023
IE09.04.2023
LU09.04.2023
BE30.04.2023
CH30.04.2023
LI30.04.2023
[2024/26]
Former [2024/21]AL28.09.2022
AT28.09.2022
CZ28.09.2022
DK28.09.2022
EE28.09.2022
ES28.09.2022
FI28.09.2022
HR28.09.2022
LT28.09.2022
LV28.09.2022
MC28.09.2022
NL28.09.2022
PL28.09.2022
RO28.09.2022
RS28.09.2022
SE28.09.2022
SI28.09.2022
SK28.09.2022
SM28.09.2022
NO28.12.2022
GR29.12.2022
IS28.01.2023
PT30.01.2023
IE09.04.2023
LU09.04.2023
BE30.04.2023
CH30.04.2023
LI30.04.2023
Former [2024/12]AL28.09.2022
AT28.09.2022
CZ28.09.2022
DK28.09.2022
EE28.09.2022
ES28.09.2022
FI28.09.2022
HR28.09.2022
LT28.09.2022
LV28.09.2022
MC28.09.2022
NL28.09.2022
PL28.09.2022
RO28.09.2022
RS28.09.2022
SE28.09.2022
SI28.09.2022
SK28.09.2022
SM28.09.2022
NO28.12.2022
GR29.12.2022
IS28.01.2023
PT30.01.2023
LU09.04.2023
BE30.04.2023
CH30.04.2023
LI30.04.2023
Former [2024/09]AL28.09.2022
AT28.09.2022
CZ28.09.2022
DK28.09.2022
EE28.09.2022
ES28.09.2022
FI28.09.2022
HR28.09.2022
LT28.09.2022
LV28.09.2022
MC28.09.2022
NL28.09.2022
PL28.09.2022
RO28.09.2022
RS28.09.2022
SE28.09.2022
SI28.09.2022
SK28.09.2022
SM28.09.2022
NO28.12.2022
GR29.12.2022
IS28.01.2023
PT30.01.2023
LU09.04.2023
CH30.04.2023
LI30.04.2023
Former [2024/08]AL28.09.2022
AT28.09.2022
CZ28.09.2022
DK28.09.2022
EE28.09.2022
ES28.09.2022
FI28.09.2022
HR28.09.2022
LT28.09.2022
LV28.09.2022
MC28.09.2022
NL28.09.2022
PL28.09.2022
RO28.09.2022
RS28.09.2022
SE28.09.2022
SI28.09.2022
SK28.09.2022
SM28.09.2022
NO28.12.2022
GR29.12.2022
IS28.01.2023
PT30.01.2023
LU09.04.2023
Former [2024/04]AL28.09.2022
AT28.09.2022
CZ28.09.2022
DK28.09.2022
EE28.09.2022
ES28.09.2022
FI28.09.2022
HR28.09.2022
LT28.09.2022
LV28.09.2022
NL28.09.2022
PL28.09.2022
RO28.09.2022
RS28.09.2022
SE28.09.2022
SI28.09.2022
SK28.09.2022
SM28.09.2022
NO28.12.2022
GR29.12.2022
IS28.01.2023
PT30.01.2023
LU09.04.2023
Former [2023/51]AL28.09.2022
AT28.09.2022
CZ28.09.2022
DK28.09.2022
EE28.09.2022
ES28.09.2022
FI28.09.2022
HR28.09.2022
LT28.09.2022
LV28.09.2022
NL28.09.2022
PL28.09.2022
RO28.09.2022
RS28.09.2022
SE28.09.2022
SI28.09.2022
SK28.09.2022
SM28.09.2022
NO28.12.2022
GR29.12.2022
IS28.01.2023
PT30.01.2023
Former [2023/34]AL28.09.2022
AT28.09.2022
CZ28.09.2022
DK28.09.2022
EE28.09.2022
ES28.09.2022
FI28.09.2022
HR28.09.2022
LT28.09.2022
LV28.09.2022
NL28.09.2022
PL28.09.2022
RO28.09.2022
RS28.09.2022
SE28.09.2022
SK28.09.2022
SM28.09.2022
NO28.12.2022
GR29.12.2022
IS28.01.2023
PT30.01.2023
Former [2023/30]AL28.09.2022
AT28.09.2022
CZ28.09.2022
EE28.09.2022
ES28.09.2022
FI28.09.2022
HR28.09.2022
LT28.09.2022
LV28.09.2022
NL28.09.2022
PL28.09.2022
RO28.09.2022
RS28.09.2022
SE28.09.2022
SK28.09.2022
SM28.09.2022
NO28.12.2022
GR29.12.2022
IS28.01.2023
PT30.01.2023
Former [2023/29]AL28.09.2022
AT28.09.2022
CZ28.09.2022
EE28.09.2022
ES28.09.2022
FI28.09.2022
HR28.09.2022
LT28.09.2022
LV28.09.2022
PL28.09.2022
RO28.09.2022
RS28.09.2022
SE28.09.2022
SK28.09.2022
SM28.09.2022
NO28.12.2022
GR29.12.2022
IS28.01.2023
PT30.01.2023
Former [2023/26]AT28.09.2022
CZ28.09.2022
EE28.09.2022
ES28.09.2022
FI28.09.2022
HR28.09.2022
LT28.09.2022
LV28.09.2022
PL28.09.2022
RO28.09.2022
RS28.09.2022
SE28.09.2022
SK28.09.2022
SM28.09.2022
NO28.12.2022
GR29.12.2022
IS28.01.2023
PT30.01.2023
Former [2023/23]AT28.09.2022
CZ28.09.2022
EE28.09.2022
ES28.09.2022
FI28.09.2022
HR28.09.2022
LT28.09.2022
LV28.09.2022
RO28.09.2022
RS28.09.2022
SE28.09.2022
SK28.09.2022
SM28.09.2022
NO28.12.2022
GR29.12.2022
PT30.01.2023
Former [2023/22]AT28.09.2022
CZ28.09.2022
ES28.09.2022
FI28.09.2022
HR28.09.2022
LT28.09.2022
LV28.09.2022
RO28.09.2022
RS28.09.2022
SE28.09.2022
SM28.09.2022
NO28.12.2022
GR29.12.2022
PT30.01.2023
Former [2023/20]FI28.09.2022
HR28.09.2022
LT28.09.2022
LV28.09.2022
RS28.09.2022
SE28.09.2022
SM28.09.2022
NO28.12.2022
GR29.12.2022
Former [2023/10]FI28.09.2022
HR28.09.2022
LT28.09.2022
LV28.09.2022
RS28.09.2022
SE28.09.2022
NO28.12.2022
GR29.12.2022
Former [2023/09]FI28.09.2022
LT28.09.2022
LV28.09.2022
RS28.09.2022
SE28.09.2022
NO28.12.2022
Former [2023/08]FI28.09.2022
LT28.09.2022
RS28.09.2022
SE28.09.2022
NO28.12.2022
Documents cited:Search[Y]WO2007134599  (VESTAS WIND SYS AS [DK], et al) [Y] 1-15 * abstract * * page 2, line 27 - page 4, line 14 * * page 7, line 15 - line 26 * * page 8, line 5 - line 15 * * page 11, line 11 - page 12, line 3 * * page 16, line 9 - line 19 * * page 17, line 10 - line 16 * * page 18, line 11 - page 19, line 15; figures 1,2,5-7 *;
 [Y]US7455534  (FREDERICKSEN ROSS T [US], et al) [Y] 1-15 * abstract * * column 1, line 26 - line 67 * * column 2, line 10 - line 44 * * column 3, line 13 - column 4, line 23 * * column 6, line 27 - line 54; figures 1,2,3,4,6 *;
 [A]US2011027100  (CUMMANE DANIEL FRANCIS [US], et al) [A] 1-15 * abstract * * paragraph [0016] * * paragraph [0031]; figures 1-3 *;
 [A]  - LORENTZOU M I ET AL, "Analysis of wind turbine grounding systems", ELECTROTECHNICAL CONFERENCE, 2000. MELECON 2000. 10TH MEDITERRANEAN MAY 29-31, 2000, PISCATAWAY, NJ, USA,IEEE, (20000529), vol. 3, ISBN 978-0-7803-6290-1, pages 936 - 939, XP010518597 [A] 1-15 * abstract * * paragraphs [0003] , [00 4] , [00 6] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.