blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3537060

EP3537060 - VERTICAL FLUID HEAT EXCHANGER INSTALLED WITHIN NATURAL THERMAL ENERGY BODY [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  25.03.2022
Database last updated on 17.08.2024
FormerThe patent has been granted
Status updated on  16.04.2021
FormerGrant of patent is intended
Status updated on  07.12.2020
FormerRequest for examination was made
Status updated on  17.07.2020
FormerThe application has been published
Status updated on  09.08.2019
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
Yang, Tai-Her
No. 59, Chung Hsing 8 St.
Si-Hu Town
Dzan-Hwa / TW
[2019/37]
Inventor(s)01 / see applicant
...
 [2019/37]
Representative(s)Wright, Howard Hugh Burnby
Withers & Rogers LLP
2 London Bridge
London SE1 9RA / GB
[N/P]
Former [2019/37]Wright, Howard Hugh Burnby
Withers & Rogers LLP
4 More London Riverside
London SE1 2AU / GB
Application number, filing date19168750.805.11.2010
[2019/37]
Priority number, dateUS2009059102405.11.2009         Original published format: US 591024
[2019/37]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP3537060
Date:11.09.2019
Language:EN
[2019/37]
Type: A3 Search report 
No.:EP3537060
Date:15.01.2020
Language:EN
[2020/03]
Type: B1 Patent specification 
No.:EP3537060
Date:19.05.2021
Language:EN
[2021/20]
Search report(s)(Supplementary) European search report - dispatched on:EP12.12.2019
ClassificationIPC:F28D20/00
[2020/50]
CPC:
F28D20/0034 (EP,US); F24T10/30 (EP,US); F28D20/0052 (EP,US);
F28F2270/00 (EP); Y02E10/10 (EP,US); Y02E60/14 (EP,US)
Former IPC [2019/37]F24T10/30
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/34]
Former [2019/37]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:IN EINEM NATÜRLICHEN WÄRMEENERGIEKÖRPER INSTALLIERTER VERTIKALER FLÜSSIGKEITSWÄRMETAUSCHER[2019/37]
English:VERTICAL FLUID HEAT EXCHANGER INSTALLED WITHIN NATURAL THERMAL ENERGY BODY[2019/37]
French:ÉCHANGEUR THERMIQUE À FLUIDE VERTICAL INSTALLÉ DANS UN CORPS D'ÉNERGIE THERMIQUE NATURELLE[2019/37]
Examination procedure14.07.2020Amendment by applicant (claims and/or description)
14.07.2020Examination requested  [2020/34]
14.07.2020Date on which the examining division has become responsible
08.12.2020Communication of intention to grant the patent
08.04.2021Fee for grant paid
08.04.2021Fee for publishing/printing paid
08.04.2021Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP10190257.5  / EP2320187
Opposition(s)22.02.2022No opposition filed within time limit [2022/17]
Fees paidRenewal fee
11.04.2019Renewal fee patent year 03
11.04.2019Renewal fee patent year 04
11.04.2019Renewal fee patent year 05
11.04.2019Renewal fee patent year 06
11.04.2019Renewal fee patent year 07
11.04.2019Renewal fee patent year 08
11.04.2019Renewal fee patent year 09
22.11.2019Renewal fee patent year 10
31.03.2021Renewal fee patent year 11
Penalty fee
Additional fee for renewal fee
30.11.202011   M06   Fee paid on   31.03.2021
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU05.11.2010
AL19.05.2021
AT19.05.2021
CY19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
MK19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
IE05.11.2021
LU05.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
[2024/23]
Former [2023/33]HU05.11.2010
AL19.05.2021
AT19.05.2021
CY19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
IE05.11.2021
LU05.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
Former [2023/24]AL19.05.2021
AT19.05.2021
CY19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
IE05.11.2021
LU05.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
Former [2022/48]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
IE05.11.2021
LU05.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
Former [2022/37]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
LU05.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
Former [2022/34]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
LU05.11.2021
BE30.11.2021
Former [2022/33]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
BE30.11.2021
Former [2022/29]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/26]AL19.05.2021
AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/23]AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/10]AT19.05.2021
CZ19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
PT20.09.2021
IS22.12.2021
Former [2022/09]AT19.05.2021
CZ19.05.2021
DK19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/08]AT19.05.2021
CZ19.05.2021
DK19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
PL19.05.2021
RS19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/07]AT19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
PL19.05.2021
RS19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2021/52]AT19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
PL19.05.2021
RS19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2021/51]AT19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
RS19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2021/50]AT19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
PT20.09.2021
Former [2021/49]AT19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
Former [2021/47]AT19.05.2021
FI19.05.2021
LT19.05.2021
BG19.08.2021
Former [2021/46]AT19.05.2021
FI19.05.2021
LT19.05.2021
Documents cited:Search[A]JPS53150948U  (A) [A] 3 * figures 1,2 *;
 [A]US4375831  (DOWNING JR JAMES E [US]) [A] 1 * figure 1 *;
 [A]WO03060389  (WATERKOTTE WAERMEPUMPEN GMBH [DE], et al) [A] 3* figure 1 *;
 [YA]JP2006038256  (TOKO KOGYO KK) [Y] 2 * figures 1,3,4,7 * [A] 3;
 [XYI]US2009211727  (YIN XUEJUN [CN], et al) [X] 1 * paragraph [0077]; figures 5,6,12,13 * [Y] 2 [I] 2
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.