Extract from the Register of European Patents

EP About this file: EP3556970

EP3556970 - CONCRETE PUMP TRUCK [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  15.03.2024
Database last updated on 28.03.2026
FormerThe patent has been granted
Status updated on  07.04.2023
FormerGrant of patent is intended
Status updated on  04.01.2023
FormerExamination is in progress
Status updated on  12.11.2021
FormerRequest for examination was made
Status updated on  24.04.2020
FormerThe application has been published
Status updated on  20.09.2019
Most recent event   Tooltip05.09.2025Lapse of the patent in a contracting state
New state(s): HU
published on 08.10.2025  [2025/41]
Applicant(s)For all designated states
Liebherr-Mischtechnik GmbH
Im Elchgrund 12
88427 Bad Schussenried / DE
[2020/45]
Former [2019/43]For all designated states
Liebherr-Betonpumpen GmbH
Lessingstr. 4
89231 Neu-Ulm / DE
Inventor(s)01 / Peters, Stefan
Im Eppen 28
89185 Hüttisheim / DE
02 / Haberkorn, Rainer
Zur Birkenallee 14
89284 Pfaffenhofen a.d. Roth / DE
03 / Pfänder, Martin
Neudorferstr. 16
89584 Herbertshofen / DE
 [2020/04]
Former [2019/48]01 / Peters, Stefan
Lindenstr. 4
89185 Hüttisheim / DE
02 / Haberkorn, Rainer
Zur Birkenallee 14
89284 Pfaffenhofen a.d. Roth / DE
03 / Pfänder, Martin
Neudorferstr. 16
89584 Herbertshofen / DE
Former [2019/43]01 / Peters, Stefan
Lindenstr. 4
89185 Hüttisheim / DE
02 / Haberkorn, Rainer
Adlerstr. 10
89278 Nersingen / DE
03 / Pfänder, Martin
Neudorferstr. 16
89584 Herbertshofen / DE
Representative(s)Laufhütte, Dieter
Lorenz Seidler Gossel
Rechtsanwälte Patentanwälte
Partnerschaft mbB
Widenmayerstraße 23
80538 München / DE
[2019/43]
Application number, filing date19168994.212.04.2019
[2019/43]
Priority number, dateDE20181010922418.04.2018         Original published format: DE102018109224
[2019/43]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3556970
Date:23.10.2019
Language:DE
[2019/43]
Type: B1 Patent specification 
No.:EP3556970
Date:10.05.2023
Language:DE
[2023/19]
Search report(s)(Supplementary) European search report - dispatched on:EP12.09.2019
ClassificationIPC:E04G21/04, B66C23/78
[2019/43]
CPC:
E04G21/0445 (EP); B66C23/78 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/43]
TitleGerman:AUTOBETONPUMPE[2019/43]
English:CONCRETE PUMP TRUCK[2019/43]
French:POMPE À BÉTON[2019/43]
Examination procedure22.04.2020Amendment by applicant (claims and/or description)
22.04.2020Examination requested  [2020/22]
22.04.2020Date on which the examining division has become responsible
11.11.2021Despatch of a communication from the examining division (Time limit: M04)
11.03.2022Reply to a communication from the examining division
05.01.2023Communication of intention to grant the patent
27.03.2023Fee for grant paid
27.03.2023Fee for publishing/printing paid
27.03.2023Receipt of the translation of the claim(s)
Opposition(s)13.02.2024No opposition filed within time limit [2024/16]
Fees paidRenewal fee
24.04.2021Renewal fee patent year 03
15.03.2022Renewal fee patent year 04
16.03.2023Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCY12.04.2019
HU12.04.2019
BG10.05.2023
CZ10.05.2023
DK10.05.2023
EE10.05.2023
FI10.05.2023
HR10.05.2023
LT10.05.2023
LV10.05.2023
MC10.05.2023
NL10.05.2023
PL10.05.2023
RO10.05.2023
RS10.05.2023
SE10.05.2023
SI10.05.2023
SK10.05.2023
SM10.05.2023
NO10.08.2023
GR11.08.2023
IS10.09.2023
PT11.09.2023
[2025/41]
Former [2025/37]CY12.04.2019
BG10.05.2023
CZ10.05.2023
DK10.05.2023
EE10.05.2023
FI10.05.2023
HR10.05.2023
LT10.05.2023
LV10.05.2023
MC10.05.2023
NL10.05.2023
PL10.05.2023
RO10.05.2023
RS10.05.2023
SE10.05.2023
SI10.05.2023
SK10.05.2023
SM10.05.2023
NO10.08.2023
GR11.08.2023
IS10.09.2023
PT11.09.2023
Former [2024/52]BG10.05.2023
CZ10.05.2023
DK10.05.2023
EE10.05.2023
FI10.05.2023
HR10.05.2023
LT10.05.2023
LV10.05.2023
MC10.05.2023
NL10.05.2023
PL10.05.2023
RO10.05.2023
RS10.05.2023
SE10.05.2023
SI10.05.2023
SK10.05.2023
SM10.05.2023
NO10.08.2023
GR11.08.2023
IS10.09.2023
PT11.09.2023
Former [2024/51]BG10.05.2023
CZ10.05.2023
DK10.05.2023
EE10.05.2023
FI10.05.2023
HR10.05.2023
LT10.05.2023
LV10.05.2023
NL10.05.2023
PL10.05.2023
RO10.05.2023
RS10.05.2023
SE10.05.2023
SI10.05.2023
SK10.05.2023
SM10.05.2023
NO10.08.2023
GR11.08.2023
IS10.09.2023
PT11.09.2023
Former [2024/25]CZ10.05.2023
DK10.05.2023
EE10.05.2023
FI10.05.2023
HR10.05.2023
LT10.05.2023
LV10.05.2023
NL10.05.2023
PL10.05.2023
RO10.05.2023
RS10.05.2023
SE10.05.2023
SI10.05.2023
SK10.05.2023
SM10.05.2023
NO10.08.2023
GR11.08.2023
IS10.09.2023
PT11.09.2023
Former [2024/10]CZ10.05.2023
DK10.05.2023
EE10.05.2023
FI10.05.2023
HR10.05.2023
LT10.05.2023
LV10.05.2023
NL10.05.2023
PL10.05.2023
RO10.05.2023
RS10.05.2023
SE10.05.2023
SK10.05.2023
SM10.05.2023
NO10.08.2023
GR11.08.2023
IS10.09.2023
PT11.09.2023
Former [2024/08]FI10.05.2023
HR10.05.2023
LT10.05.2023
LV10.05.2023
NL10.05.2023
PL10.05.2023
RS10.05.2023
SE10.05.2023
SK10.05.2023
SM10.05.2023
NO10.08.2023
GR11.08.2023
IS10.09.2023
PT11.09.2023
Former [2024/03]FI10.05.2023
HR10.05.2023
LT10.05.2023
LV10.05.2023
NL10.05.2023
PL10.05.2023
RS10.05.2023
SE10.05.2023
NO10.08.2023
GR11.08.2023
IS10.09.2023
PT11.09.2023
Former [2024/01]HR10.05.2023
LT10.05.2023
LV10.05.2023
NL10.05.2023
PL10.05.2023
RS10.05.2023
SE10.05.2023
NO10.08.2023
GR11.08.2023
IS10.09.2023
PT11.09.2023
Former [2023/51]HR10.05.2023
NL10.05.2023
PL10.05.2023
RS10.05.2023
SE10.05.2023
NO10.08.2023
GR11.08.2023
IS10.09.2023
PT11.09.2023
Former [2023/50]NL10.05.2023
PL10.05.2023
SE10.05.2023
NO10.08.2023
GR11.08.2023
IS10.09.2023
PT11.09.2023
Former [2023/48]NL10.05.2023
SE10.05.2023
NO10.08.2023
PT11.09.2023
Former [2023/46]PT11.09.2023
Documents cited:Search[X] DE19805359  (PUTZMEISTER AG et al.) [X] 1,2,5-7,9,10 * pages 2,3; figures 1-3c *
 [I] FR2239103  (FONTAN JEAN et al.) [I] 1-4,9,10 * the whole document *
 [I] GB2087813  (HARNISCHFEGER CORP et al.) [I] 1,5,6,8-10 * pages 2,3; figures 1-6 *
 [A] DE102016104653  (SCHWING GMBH F et al.) [A] 1-10 * paragraphs [0034] - [0050]; figures 1-10 *
 [A] EP0308758  (KIDDE IND INC et al.) [A] 1-10 * the whole document *
 [A] EP1170245  (DEERE & CO et al.) [A] 1-10 * the whole document *
ExaminationDE29511528
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.