blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3730225

EP3730225 - DUST REMOVAL SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  26.07.2024
Database last updated on 26.07.2024
FormerThe patent has been granted
Status updated on  18.08.2023
FormerGrant of patent is intended
Status updated on  24.05.2023
FormerExamination is in progress
Status updated on  20.08.2021
FormerRequest for examination was made
Status updated on  18.12.2020
FormerThe application has been published
Status updated on  25.09.2020
Most recent event   Tooltip26.07.2024No opposition filed within time limitpublished on 28.08.2024 [2024/35]
Applicant(s)For all designated states
Kraemer, Thilo
Röntgenstrasse 68
64291 Darmstadt / DE
[2020/44]
Inventor(s)01 / see applicant
...
 [2020/44]
Representative(s)Hamel, Armin
Iridium IP
Friedrich-König-Strasse 3-5
68167 Mannheim / DE
[2020/44]
Application number, filing date19171338.726.04.2019
[2020/44]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3730225
Date:28.10.2020
Language:DE
[2020/44]
Type: B1 Patent specification 
No.:EP3730225
Date:20.09.2023
Language:DE
[2023/38]
Search report(s)(Supplementary) European search report - dispatched on:EP06.11.2019
ClassificationIPC:B07B1/40, B07B13/05, B07B1/46, B07B13/16
[2020/44]
CPC:
B07B1/40 (EP); B07B1/469 (EP); B07B13/05 (EP);
B07B13/16 (EP); G01N1/34 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/03]
Former [2020/44]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ENTSTAUBUNGSANLAGE[2020/44]
English:DUST REMOVAL SYSTEM[2020/44]
French:INSTALLATION DE DÉPOUSSIÉRAGE[2020/44]
Examination procedure15.12.2020Amendment by applicant (claims and/or description)
15.12.2020Examination requested  [2021/03]
15.12.2020Date on which the examining division has become responsible
20.08.2021Despatch of a communication from the examining division (Time limit: M04)
07.12.2021Reply to a communication from the examining division
20.04.2023Cancellation of oral proceeding that was planned for 11.05.2023
11.05.2023Date of oral proceedings (cancelled)
25.05.2023Communication of intention to grant the patent
11.08.2023Fee for grant paid
11.08.2023Fee for publishing/printing paid
11.08.2023Receipt of the translation of the claim(s)
Opposition(s)21.06.2024No opposition filed within time limit [2024/35]
Fees paidRenewal fee
28.04.2021Renewal fee patent year 03
14.03.2022Renewal fee patent year 04
29.03.2023Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ20.09.2023
DK20.09.2023
EE20.09.2023
FI20.09.2023
HR20.09.2023
LT20.09.2023
LV20.09.2023
PL20.09.2023
RO20.09.2023
RS20.09.2023
SE20.09.2023
SK20.09.2023
SM20.09.2023
NO20.12.2023
GR21.12.2023
IS20.01.2024
PT22.01.2024
[2024/33]
Former [2024/25]CZ20.09.2023
EE20.09.2023
FI20.09.2023
HR20.09.2023
LT20.09.2023
LV20.09.2023
PL20.09.2023
RO20.09.2023
RS20.09.2023
SE20.09.2023
SK20.09.2023
SM20.09.2023
NO20.12.2023
GR21.12.2023
IS20.01.2024
PT22.01.2024
Former [2024/23]CZ20.09.2023
EE20.09.2023
FI20.09.2023
HR20.09.2023
LT20.09.2023
LV20.09.2023
RO20.09.2023
RS20.09.2023
SE20.09.2023
SK20.09.2023
SM20.09.2023
NO20.12.2023
GR21.12.2023
IS20.01.2024
PT22.01.2024
Former [2024/20]FI20.09.2023
HR20.09.2023
LT20.09.2023
LV20.09.2023
RS20.09.2023
SE20.09.2023
SM20.09.2023
NO20.12.2023
GR21.12.2023
IS20.01.2024
Former [2024/10]FI20.09.2023
HR20.09.2023
LT20.09.2023
LV20.09.2023
RS20.09.2023
SE20.09.2023
NO20.12.2023
GR21.12.2023
Former [2024/09]FI20.09.2023
LT20.09.2023
SE20.09.2023
NO20.12.2023
GR21.12.2023
Former [2024/08]LT20.09.2023
NO20.12.2023
GR21.12.2023
Documents cited:Search[Y]GB1579719  (FUJISAWA PHARMACEUTICAL CO) [Y] 4,8 * claim 1 *;
 [A]US2008128002  (JEFFS DAWNETTE E [US]) [A] 1-9* the whole document *;
 [XYI]DE102008038645  (ZEPPELIN SILOS & SYSTEMS GMBH [DE]) [X] 1-3,5-7 * paragraphs [0015] , [0 18] , [0 19] , [0 68] , [0 69]; figure 2 * [Y] 4,8 [I] 9;
 [Y]DE202014103239U  (YU SI LIN [TW]) [Y] 4,8 * paragraph [0017] *
ExaminationWO2008032363
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.