| EP3553025 - ACCELERATOR FOR MINERAL BINDER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.09.2021 Database last updated on 21.03.2026 | |
| Former | The patent has been granted Status updated on 16.10.2020 | ||
| Former | Grant of patent is intended Status updated on 28.06.2020 | ||
| Former | Request for examination was made Status updated on 24.04.2020 | ||
| Former | The application has been published Status updated on 13.09.2019 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states SIKA TECHNOLOGY AG Zugerstrasse 50 6340 Baar / CH | [2019/42] | Inventor(s) | 01 /
Mäder, Gilbert Schillingstrasse 18 8460 Marthalen / CH | 02 /
Kurz, Christophe Finstergässli 12 5304 Endingen / CH | 03 /
Marazzani, Beat Rebbergstrasse 47a 8102 Oberengstringen / CH | 04 /
Bürge, Christian Lenzburgerstrasse 4 5503 Schafisheim / CH | [2019/42] | Representative(s) | Sika Patent Attorneys C/o Sika Technology AG Corp. IP Dept. Tüffenwies 16 8048 Zürich / CH | [N/P] |
| Former [2019/42] | Sika Patent Attorneys c/o Sika Technology AG Corp. IP Dept. Tüffenwies 16 Postfach 8048 Zürich / CH | Application number, filing date | 19171619.0 | 21.05.2014 | [2019/42] | Priority number, date | EP20130169868 | 30.05.2013 Original published format: EP 13169868 | [2019/42] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3553025 | Date: | 16.10.2019 | Language: | DE | [2019/42] | Type: | B1 Patent specification | No.: | EP3553025 | Date: | 18.11.2020 | Language: | DE | [2020/47] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.08.2019 | Classification | IPC: | C01B33/24, C04B22/00, C04B28/04, C04B40/00, // C04B103/12, C04B103/14 | [2019/42] | CPC: |
C04B40/0039 (EP,RU,US);
C04B22/0086 (RU);
C01B33/24 (EP,RU,US);
C04B22/00 (US);
C04B22/00863 (EP,US);
C04B28/04 (EP,RU,US);
| C-Set: |
C04B28/04, C04B14/043, C04B14/06, C04B14/28, C04B20/0076, C04B40/0608 (US,EP);
C04B40/0039, C04B12/04, C04B22/08 (EP,US) | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/22] |
| Former [2019/42] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | BESCHLEUNIGER FÜR MINERALISCHE BINDEMITTEL | [2019/42] | English: | ACCELERATOR FOR MINERAL BINDER | [2019/42] | French: | ACCÉLÉRATEUR POUR LIANT MINÉRAL | [2019/42] | Examination procedure | 14.04.2020 | Amendment by applicant (claims and/or description) | 16.04.2020 | Examination requested [2020/22] | 16.04.2020 | Date on which the examining division has become responsible | 29.06.2020 | Communication of intention to grant the patent | 06.10.2020 | Fee for grant paid | 06.10.2020 | Fee for publishing/printing paid | 06.10.2020 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP14729611.5 / EP3003977 | Opposition(s) | 19.08.2021 | No opposition filed within time limit [2021/43] | Fees paid | Renewal fee | 29.08.2019 | Renewal fee patent year 03 | 29.08.2019 | Renewal fee patent year 04 | 29.08.2019 | Renewal fee patent year 05 | 29.08.2019 | Renewal fee patent year 06 | 02.06.2020 | Renewal fee patent year 07 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.05.2014 | AL | 18.11.2020 | CY | 18.11.2020 | CZ | 18.11.2020 | DK | 18.11.2020 | EE | 18.11.2020 | ES | 18.11.2020 | FI | 18.11.2020 | HR | 18.11.2020 | IT | 18.11.2020 | LT | 18.11.2020 | LV | 18.11.2020 | MC | 18.11.2020 | MK | 18.11.2020 | MT | 18.11.2020 | NL | 18.11.2020 | PL | 18.11.2020 | RO | 18.11.2020 | RS | 18.11.2020 | SI | 18.11.2020 | SK | 18.11.2020 | SM | 18.11.2020 | TR | 18.11.2020 | BG | 18.02.2021 | NO | 18.02.2021 | GR | 19.02.2021 | IS | 18.03.2021 | PT | 18.03.2021 | AT | 21.05.2021 | IE | 21.05.2021 | LU | 21.05.2021 | BE | 31.05.2021 | CH | 31.05.2021 | LI | 31.05.2021 | [2026/04] |
| Former [2024/42] | HU | 21.05.2014 | |
| AL | 18.11.2020 | ||
| CY | 18.11.2020 | ||
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| ES | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| IT | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| MC | 18.11.2020 | ||
| MK | 18.11.2020 | ||
| MT | 18.11.2020 | ||
| NL | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SI | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| AT | 21.05.2021 | ||
| IE | 21.05.2021 | ||
| LU | 21.05.2021 | ||
| BE | 31.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| Former [2024/23] | HU | 21.05.2014 | |
| AL | 18.11.2020 | ||
| CY | 18.11.2020 | ||
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| ES | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| IT | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| MC | 18.11.2020 | ||
| MK | 18.11.2020 | ||
| NL | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SI | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| AT | 21.05.2021 | ||
| IE | 21.05.2021 | ||
| LU | 21.05.2021 | ||
| BE | 31.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| Former [2023/33] | HU | 21.05.2014 | |
| AL | 18.11.2020 | ||
| CY | 18.11.2020 | ||
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| ES | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| IT | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| MC | 18.11.2020 | ||
| NL | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SI | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| AT | 21.05.2021 | ||
| IE | 21.05.2021 | ||
| LU | 21.05.2021 | ||
| BE | 31.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| Former [2023/30] | AL | 18.11.2020 | |
| CY | 18.11.2020 | ||
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| ES | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| IT | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| MC | 18.11.2020 | ||
| NL | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SI | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| AT | 21.05.2021 | ||
| IE | 21.05.2021 | ||
| LU | 21.05.2021 | ||
| BE | 31.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| Former [2022/37] | AL | 18.11.2020 | |
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| ES | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| IT | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| MC | 18.11.2020 | ||
| NL | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SI | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| AT | 21.05.2021 | ||
| IE | 21.05.2021 | ||
| LU | 21.05.2021 | ||
| BE | 31.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| Former [2022/34] | AL | 18.11.2020 | |
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| ES | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| IT | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| MC | 18.11.2020 | ||
| NL | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SI | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| IE | 21.05.2021 | ||
| LU | 21.05.2021 | ||
| BE | 31.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| Former [2022/23] | AL | 18.11.2020 | |
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| ES | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| IT | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| MC | 18.11.2020 | ||
| NL | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SI | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| IE | 21.05.2021 | ||
| LU | 21.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| Former [2022/21] | AL | 18.11.2020 | |
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| ES | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| IT | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| MC | 18.11.2020 | ||
| NL | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SI | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| PT | 18.03.2021 | ||
| IE | 21.05.2021 | ||
| LU | 21.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| Former [2022/10] | AL | 18.11.2020 | |
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| ES | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| IT | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| MC | 18.11.2020 | ||
| NL | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SI | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| PT | 18.03.2021 | ||
| LU | 21.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| Former [2022/08] | AL | 18.11.2020 | |
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| ES | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| IT | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| MC | 18.11.2020 | ||
| NL | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SI | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| LU | 21.05.2021 | ||
| Former [2022/07] | AL | 18.11.2020 | |
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| IT | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| MC | 18.11.2020 | ||
| NL | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SI | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/50] | AL | 18.11.2020 | |
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| IT | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| NL | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SI | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/48] | AL | 18.11.2020 | |
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| IT | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| NL | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/46] | AL | 18.11.2020 | |
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| NL | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/45] | AL | 18.11.2020 | |
| CZ | 18.11.2020 | ||
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/37] | CZ | 18.11.2020 | |
| DK | 18.11.2020 | ||
| EE | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/36] | CZ | 18.11.2020 | |
| EE | 18.11.2020 | ||
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/35] | CZ | 18.11.2020 | |
| FI | 18.11.2020 | ||
| HR | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RO | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SK | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/33] | FI | 18.11.2020 | |
| HR | 18.11.2020 | ||
| LT | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/32] | FI | 18.11.2020 | |
| HR | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| SM | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/28] | FI | 18.11.2020 | |
| HR | 18.11.2020 | ||
| LV | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/25] | FI | 18.11.2020 | |
| LV | 18.11.2020 | ||
| PL | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| IS | 18.03.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/24] | FI | 18.11.2020 | |
| LV | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| BG | 18.02.2021 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/23] | FI | 18.11.2020 | |
| LV | 18.11.2020 | ||
| RS | 18.11.2020 | ||
| NO | 18.02.2021 | ||
| GR | 19.02.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/22] | FI | 18.11.2020 | |
| RS | 18.11.2020 | ||
| NO | 18.02.2021 | ||
| PT | 18.03.2021 | ||
| Former [2021/21] | FI | 18.11.2020 | |
| PT | 18.03.2021 | ||
| Former [2021/20] | FI | 18.11.2020 | Documents cited: | Search | [XP] EP2607329 (SIKA TECHNOLOGY AG et al.) | [XD] DE202009017741 (CONSTR RES & TECH GMBH et al.) | [XP] GB891170 (CAPE ASBESTOS COMPANY LTD et al.) [XP] 1-15 * the whole document * | [XD] GB1467717 (NISSAN CHEMICAL IND LTD et al.) [XD] 1-9,13-15 * paragraph [0001] - paragraph [0045] * | [A] WO2015004196 (SIKA TECHNOLOGY AG et al.) [A] 1-5,13 * pages 1,2,5-8 * | by applicant | DE202009017741 | "Rmpp Chemie Lexikon", 1995, GEORG THIEME VERLAG |