blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3588020

EP3588020 - DEVICE AND METHOD FOR PRODUCING ICE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  14.01.2022
Database last updated on 31.05.2024
FormerThe patent has been granted
Status updated on  05.02.2021
FormerGrant of patent is intended
Status updated on  03.11.2020
FormerRequest for examination was made
Status updated on  12.06.2020
FormerThe application has been published
Status updated on  05.12.2019
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024 [2024/23]
Applicant(s)For all designated states
CASTEL MAC S.R.L.
Via del Lavoro, 9
31033 Castelfranco Veneto (TV) / IT
[2021/08]
Former [2020/01]For all designated states
CASTEL MAC S.p.A.
Via del Lavoro, 9
31033 Castelfranco Veneto TV / IT
Inventor(s)01 / SPINETTI, Alberto Italo
c/o CASTEL MAC S.P.A.
VIA DEL LAVORO, 9
31033 CASTELFRANCO VENETO TV / IT
 [2020/01]
Representative(s)Burchielli, Riccardo, et al
Barzano & Zanardo Roma S.p.A.
Via Piemonte 26
00187 Roma / IT
[2020/01]
Application number, filing date19172483.003.05.2019
[2020/01]
Priority number, dateIT2018000658022.06.2018         Original published format: IT201800006580
[2020/01]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3588020
Date:01.01.2020
Language:EN
[2020/01]
Type: B1 Patent specification 
No.:EP3588020
Date:10.03.2021
Language:EN
[2021/10]
Search report(s)(Supplementary) European search report - dispatched on:EP22.07.2019
ClassificationIPC:G01F23/26, F25C1/25
[2020/01]
CPC:
F25C1/25 (EP); G01F23/265 (EP); F25C2700/04 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/29]
Former [2020/01]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VORRICHTUNG UND VERFAHREN ZUR HERSTELLUNG VON EIS[2020/45]
English:DEVICE AND METHOD FOR PRODUCING ICE[2020/01]
French:DISPOSITIF ET PROCÉDÉ POUR PRODUIRE DE LA GLACE[2020/45]
Former [2020/01]VORRICHTUNG ZUR HERSTELLUNG VON EIS UND VERFAHREN ZUR VERWENDUNG DAVON
Former [2020/01]DISPOSITIF DE PRODUCTION DE GLACE ET SON PROCÉDÉ D'UTILISATION
Examination procedure08.06.2020Amendment by applicant (claims and/or description)
08.06.2020Examination requested  [2020/29]
08.06.2020Date on which the examining division has become responsible
04.11.2020Communication of intention to grant the patent
26.01.2021Fee for grant paid
26.01.2021Fee for publishing/printing paid
26.01.2021Receipt of the translation of the claim(s)
Opposition(s)13.12.2021No opposition filed within time limit [2022/07]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU03.05.2019
AL10.03.2021
AT10.03.2021
CY10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
MK10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
IE03.05.2021
LU03.05.2021
BE31.05.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
[2024/23]
Former [2023/33]HU03.05.2019
AL10.03.2021
AT10.03.2021
CY10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
IE03.05.2021
LU03.05.2021
BE31.05.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2023/30]AL10.03.2021
AT10.03.2021
CY10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
IE03.05.2021
LU03.05.2021
BE31.05.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2022/34]AL10.03.2021
AT10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
IE03.05.2021
LU03.05.2021
BE31.05.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2022/23]AL10.03.2021
AT10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
IE03.05.2021
LU03.05.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2022/21]AL10.03.2021
AT10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
IE03.05.2021
LU03.05.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
PT12.07.2021
Former [2022/13]AL10.03.2021
AT10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
LU03.05.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
PT12.07.2021
Former [2022/10]AL10.03.2021
AT10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
LU03.05.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
PT12.07.2021
Former [2022/08]AL10.03.2021
AT10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
ES10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
LU03.05.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2022/07]AL10.03.2021
AT10.03.2021
CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2021/52]AT10.03.2021
CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2021/51]AT10.03.2021
CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2021/50]AT10.03.2021
CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
PT12.07.2021
Former [2021/48]AT10.03.2021
CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
RS10.03.2021
SE10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/46]AT10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
RS10.03.2021
SE10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/43]FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
NL10.03.2021
RS10.03.2021
SE10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/38]FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
RS10.03.2021
SE10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/37]FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
RS10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/36]FI10.03.2021
HR10.03.2021
LT10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/35]FI10.03.2021
HR10.03.2021
LT10.03.2021
NO10.06.2021
Former [2021/33]FI10.03.2021
LT10.03.2021
NO10.06.2021
Documents cited:Search[A]US6337959  (KWAK HEE-GUK [KR], et al) [A] 1,10* column 3, lines 37-55; figure - *;
 [A]WO2008013369  (WOONGJIN COWAY CO LTD [KR], et al) [A] 1,10 * paragraphs [0021] - [0028]; figure - *;
 [A]KR20090092387  (LG ELECTRONICS INC [KR]) [A] 1-10 * paragraphs [0050] - [0066]; figures 6-10 *;
 [A]US2012031114  (MUELLER LEE GERARD [US], et al) [A] 1-10 * paragraphs [0023] - [0030]; figure - *;
 [X]US2012247130  (ITO AKIHIRO [JP], et al) [X] 1-10 * figure -; claim - *;
 [A]US2017059386  (MUNOZ REGIS [FR]) [A] 1-10 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.