blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3735083

EP3735083 - DEVICES AND METHODS FOR CROSS-SLOT SCHEDULING ADAPTATION [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  10.09.2021
Database last updated on 05.07.2024
FormerThe application has been published
Status updated on  02.10.2020
Most recent event   Tooltip10.09.2021Application deemed to be withdrawnpublished on 13.10.2021  [2021/41]
Applicant(s)For all designated states
Panasonic Intellectual Property Corporation of America
20000 Mariner Avenue, Suite 200
Torrance, CA 90503 / US
[2020/45]
Inventor(s)01 / LI, Hongchao
Panasonic R&D Center Germany GmbH
Monzastrasse 4c
63225 Langen / DE
02 / SUZUKI, Hidetoshi
Panasonic Intellectual Property Management Co.
Ltd.
1-61, Shiromi 2-chome, Chuo-ku
Osaka, Osaka 540-6207 / JP
03 / KUANG, Quan
Panasonic R&D Center Germany GmbH
Monzastrasse 4c
63225 Langen / DE
04 / BHAMRI, Ankit
Panasonic R&D Center Germany GmbH
Monzastrasse 4c
63225 Langen / DE
 [2020/45]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[2020/45]
Application number, filing date19172626.403.05.2019
[2020/45]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3735083
Date:04.11.2020
Language:EN
[2020/45]
Search report(s)(Supplementary) European search report - dispatched on:EP19.11.2019
ClassificationIPC:H04W72/12
[2020/45]
CPC:
H04W72/23 (EP,US); H04W72/044 (US); H04W72/1263 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/45]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:VORRICHTUNGEN UND VERFAHREN ZUR ANPASSUNG VON SCHLITZ-ÜBERGREIFENDER PLANUNG[2020/45]
English:DEVICES AND METHODS FOR CROSS-SLOT SCHEDULING ADAPTATION[2020/45]
French:DISPOSITIFS ET PROCÉDÉS D'ADAPTATION DE PROGRAMMATION ENTRE CRÉNEAUX[2020/45]
Examination procedure05.05.2021Application deemed to be withdrawn, date of legal effect  [2021/41]
28.05.2021Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time  [2021/41]
Fees paidPenalty fee
Additional fee for renewal fee
31.05.202103   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XI]  - APPLE INC, "Cross Slot Scheduling for UE Power Saving", vol. RAN WG1, no. Xi'an, China; 20190408 - 20190412, (20190403), 3GPP DRAFT; R1-1904986 CROSS SLOT SCHEDULING FOR UE POWER SAVING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANC, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F96b/Docs/R1%2D1904986%2Ezip, (20190403), XP051707360 [X] 1,2,5,7-16 * sections 2-3.2; pages 2-6 * [I] 3,4,6
 [A]  - CATT, "Power saving scheme with cross-slot scheduling operation", vol. RAN WG1, no. Xi'an, China; 20190408 - 20190412, (20190403), 3GPP DRAFT; R1-1905369, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F96b/Docs/R1%2D1905369%2Ezip, (20190403), XP051707443 [A] 1-16 * section 2; pages 1, 2 *
 [A]  - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Study on UE Power Saving (Release 16)", (20190406), 3GPP DRAFT; R2-1903118_TR38.840V100, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings%5F3GPP%5FSYNC/RAN2/Docs/R2%2D1903118%2Ezip, (20190406), XP051700472 [A] 1-16 * section 5.1.2; pages 13-17 *
 [A]  - QUALCOMM INCORPORATED, "UE Adaptation to the Traffic and UE Power Consumption Characteristics", vol. RAN WG1, no. Taipei, Taiwan; 20190121 - 20190125, (20190120), 3GPP DRAFT; R1-1900911 UE ADAPTATION FOR POWER SAVING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings%5F3GPP%5FSYNC/RAN1/Docs/R1%2D1900911%2Ezip, (20190120), XP051593757 [A] 1-16 * section 3; pages 6-14 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.