EP3542840 - PERITONEAL DIALYSIS SYSTEMS [Right-click to bookmark this link] | |||
Former [2019/39] | PERITONEAL DIALYSIS SYSTEMS, DEVICES, AND METHODS | ||
[2022/45] | Status | No opposition filed within time limit Status updated on 01.03.2024 Database last updated on 18.10.2024 | |
Former | The patent has been granted Status updated on 24.03.2023 | ||
Former | Grant of patent is intended Status updated on 17.10.2022 | ||
Former | Examination is in progress Status updated on 20.06.2020 | ||
Former | Request for examination was made Status updated on 27.03.2020 | ||
Former | The application has been published Status updated on 23.08.2019 | Most recent event Tooltip | 17.05.2024 | Lapse of the patent in a contracting state New state(s): SI | published on 19.06.2024 [2024/25] | Applicant(s) | For all designated states NxStage Medical, Inc. 350 Merrimack Street Lawrence, MA 01843 / US | [2023/17] |
Former [2019/39] | For all designated states NxStage Medical Inc. 350 Merrimack Street Lawrence, MA 01843 / US | Inventor(s) | 01 /
BURBANK, Jeffrey, H. 35 Coolidge Point Manchester, MA 01944 / US | 02 /
BRUGGER, James, M. 4 Savory Street Newburyport, MA 01950 / US | 03 /
TREU, Dennis, M. 4222 Serenade Road Castle Rock, CO 80104 / US | 04 /
WYETH, Mark, T. 19 Timothy Drive Andover, MA 01810 / US | [2023/17] |
Former [2019/52] | 01 /
BURBANK, Jeffrey, H. 35 Coolidge Point Manchester, MA 01944 / US | ||
02 /
BRUGGER, James, M. 4 Savory Street Newburyport, MA Massachusetts 01950 / US | |||
03 /
TREU, Dennis, M. 4222 Serenade Road Castle Rock, CO 80104 / US | |||
04 /
WYETH, Mark, T. 19 Timothy Drive Andover, MA 01810 / US | |||
Former [2019/44] | 01 /
BURBANK, Jeffrey, H. 35 Coolidge Point Manchester, MA 01944 / US | ||
02 /
BRUGGER, James, M. 4 Savory Street Newburyport, MA Massachusetts 01950 / US | |||
03 /
TREU, Dennis, M. 8 Twin Brook Lane Bedford, NH New Hampshire 03110 / US | |||
04 /
WYETH, Mark, T. 10492 Allante Court Gibsonia, PA Pennsylvania 15044 / US | |||
Former [2019/39] | 01 /
BURBANK, Jeffrey, H. 18 Sunrise Road Boxford, MA Massachusetts 01920 / US | ||
02 /
BRUGGER, James, M. 4 Savory Street Newburyport, MA Massachusetts 01950 / US | |||
03 /
TREU, Dennis, M. 8 Twin Brook Lane Bedford, NH New Hampshire 03110 / US | |||
04 /
WYETH, Mark, T. 10492 Allante Court Gibsonia, PA Pennsylvania 15044 / US | Representative(s) | Viering, Jentschura & Partner mbB Patent- und Rechtsanwälte Am Brauhaus 8 01099 Dresden / DE | [2019/39] | Application number, filing date | 19173274.2 | 23.03.2012 | [2019/39] | Priority number, date | US201161466921P | 23.03.2011 Original published format: US 201161466921 P | US201161490183P | 26.05.2011 Original published format: US 201161490183 P | US201161509240P | 19.07.2011 Original published format: US 201161509240 P | [2019/39] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3542840 | Date: | 25.09.2019 | Language: | EN | [2019/39] | Type: | B1 Patent specification | No.: | EP3542840 | Date: | 26.04.2023 | Language: | EN | [2023/17] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 29.07.2019 | Classification | IPC: | A61M1/28 | [2019/39] | CPC: |
A61M1/282 (EP,US);
A61M1/28 (EP,CN,GB,US);
A61M1/1524 (EP,CN,GB,US);
A61M1/154 (EP,CN,GB,US);
A61M1/155 (EP,CN,GB,US);
A61M1/1562 (EP,CN,GB,US);
A61M1/1565 (EP,CN,GB,US);
A61M1/159 (EP,CN,GB,US);
A61M1/1656 (EP,US);
A61M1/166 (EP,US);
A61M1/1664 (EP,US);
A61M1/1668 (EP,US);
A61M1/167 (EP,US);
A61M1/1672 (EP,US);
A61M1/1674 (EP,US);
A61M1/281 (US);
A61M1/285 (EP,US);
A61M1/287 (US);
A61M1/288 (EP,CN,GB,US);
A61M2025/0002 (EP,CN,GB,US);
A61M2205/12 (EP,US);
A61M2205/123 (US);
A61M2205/128 (EP,US);
A61M2205/14 (US);
A61M2205/18 (US);
A61M2205/33 (US);
A61M2205/3331 (US);
A61M2205/3334 (EP,CN,US);
A61M2205/3351 (EP,CN,US);
A61M2205/3355 (EP,CN,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/18] |
Former [2019/39] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | PERITONEALDIALYSESYSTEME | [2022/45] | English: | PERITONEAL DIALYSIS SYSTEMS | [2022/45] | French: | SYSTÈMES DE DIALYSE PÉRITONÉALE | [2022/45] |
Former [2019/39] | PERITONEALDIALYSESYSTEME, -VORRICHTUNGEN UND -VERFAHREN | ||
Former [2019/39] | PERITONEAL DIALYSIS SYSTEMS, DEVICES, AND METHODS | ||
Former [2019/39] | SYSTÈMES, DISPOSITIFS ET PROCÉDÉS DE DIALYSE PÉRITONÉALE | Examination procedure | 25.03.2020 | Amendment by applicant (claims and/or description) | 25.03.2020 | Examination requested [2020/18] | 25.03.2020 | Date on which the examining division has become responsible | 24.06.2020 | Despatch of a communication from the examining division (Time limit: M04) | 23.10.2020 | Reply to a communication from the examining division | 18.10.2022 | Communication of intention to grant the patent | 17.02.2023 | Fee for grant paid | 17.02.2023 | Fee for publishing/printing paid | 17.02.2023 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP12760085.6 / EP2688602 | Opposition(s) | 29.01.2024 | No opposition filed within time limit [2024/14] | Fees paid | Renewal fee | 08.05.2019 | Renewal fee patent year 03 | 08.05.2019 | Renewal fee patent year 04 | 08.05.2019 | Renewal fee patent year 05 | 08.05.2019 | Renewal fee patent year 06 | 08.05.2019 | Renewal fee patent year 07 | 08.05.2019 | Renewal fee patent year 08 | 27.03.2020 | Renewal fee patent year 09 | 29.03.2021 | Renewal fee patent year 10 | 28.03.2022 | Renewal fee patent year 11 | 21.03.2023 | Renewal fee patent year 12 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 26.04.2023 | CZ | 26.04.2023 | DK | 26.04.2023 | EE | 26.04.2023 | ES | 26.04.2023 | FI | 26.04.2023 | HR | 26.04.2023 | LT | 26.04.2023 | LV | 26.04.2023 | NL | 26.04.2023 | PL | 26.04.2023 | RO | 26.04.2023 | RS | 26.04.2023 | SE | 26.04.2023 | SI | 26.04.2023 | SK | 26.04.2023 | SM | 26.04.2023 | NO | 26.07.2023 | GR | 27.07.2023 | IS | 26.08.2023 | PT | 28.08.2023 | [2024/25] |
Former [2024/10] | AT | 26.04.2023 | |
CZ | 26.04.2023 | ||
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2024/08] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2024/03] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2024/01] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2023/51] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
HR | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2023/50] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2023/48] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
NL | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
PT | 28.08.2023 | ||
Former [2023/46] | ES | 26.04.2023 | |
NL | 26.04.2023 | ||
PT | 28.08.2023 | ||
Former [2023/43] | NL | 26.04.2023 | Documents cited: | Search | [X]WO0057935 (GAMBRO LUNDIA A B [SE]); | [X]WO02066099 (PIEDMONT RENAL CLINICS P A [US], et al) | by applicant | US2007179422 | WO2007118235 | WO2007US66251 |