blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3744895

EP3744895 - METHOD FOR PRODUCING A TRAFFIC AREA, TRAFFIC AREA AND PRE-CAST CONCRETE PANEL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.11.2022
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  03.12.2021
FormerGrant of patent is intended
Status updated on  11.08.2021
FormerRequest for examination was made
Status updated on  22.01.2021
FormerThe application has been published
Status updated on  30.10.2020
Most recent event   Tooltip17.05.2024Lapse of the patent in a contracting state
New state(s): HU
published on 19.06.2024 [2024/25]
Applicant(s)For all designated states
BTE Stelcon GmbH
Philippsburger Straße 4
76726 Germersheim / DE
For all designated states
Heinz Schnorpfeil Bau GmbH
Kastellauner Straße 51
56253 Treis-Karden / DE
For all designated states
Otto Alte-Teigeler GmbH
Obere Hardt 13
76467 Bietigheim / DE
[2020/49]
Inventor(s)01 / Tulke, Ralf
Wildpfad 9
29313 Hambüren / DE
02 / Kispert, Michael
Ludwigstr. 93 a
76768 Berg / DE
03 / Tiemann, Andreas
Kastellauner Str. 51
56253 Treis-Karden / DE
 [2020/49]
Representative(s)Andrejewski - Honke Patent- und Rechtsanwälte Partnerschaft mbB
An der Reichsbank 8
45127 Essen / DE
[2020/49]
Application number, filing date19177211.029.05.2019
[2020/49]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3744895
Date:02.12.2020
Language:DE
[2020/49]
Type: B1 Patent specification 
No.:EP3744895
Date:05.01.2022
Language:DE
[2022/01]
Search report(s)(Supplementary) European search report - dispatched on:EP19.03.2020
ClassificationIPC:E01C5/06, E01C11/10, E01C7/14, E01C23/10
[2020/49]
CPC:
E01C5/06 (EP); E01C11/103 (EP); E01C23/10 (EP);
E01C7/147 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/08]
Former [2020/49]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINER VERKEHRSFLÄCHE, VERKEHRSFLÄCHE UND FERTIGBETONPLATTE[2020/49]
English:METHOD FOR PRODUCING A TRAFFIC AREA, TRAFFIC AREA AND PRE-CAST CONCRETE PANEL[2020/49]
French:PROCÉDÉ DE FABRICATION D'UNE SURFACE DE CIRCULATION, SURFACE DE CIRCULATION ET DALLE EN BÉTON PRÉFABRIQUÉ[2020/49]
Examination procedure09.04.2020Amendment by applicant (claims and/or description)
19.01.2021Examination requested  [2021/08]
19.01.2021Date on which the examining division has become responsible
12.08.2021Communication of intention to grant the patent
21.10.2021Fee for grant paid
21.10.2021Fee for publishing/printing paid
25.11.2021Receipt of the translation of the claim(s)
Opposition(s)06.10.2022No opposition filed within time limit [2022/50]
Fees paidRenewal fee
07.05.2021Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU29.05.2019
AL05.01.2022
CY05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
IT05.01.2022
LT05.01.2022
LV05.01.2022
MC05.01.2022
MK05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SI05.01.2022
SK05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
IE29.05.2022
LU29.05.2022
BE31.05.2022
CH31.05.2022
FR31.05.2022
LI31.05.2022
[2024/25]
Former [2024/23]AL05.01.2022
CY05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
IT05.01.2022
LT05.01.2022
LV05.01.2022
MC05.01.2022
MK05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SI05.01.2022
SK05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
IE29.05.2022
LU29.05.2022
BE31.05.2022
CH31.05.2022
FR31.05.2022
LI31.05.2022
Former [2024/20]AL05.01.2022
CY05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
IT05.01.2022
LT05.01.2022
LV05.01.2022
MC05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SI05.01.2022
SK05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
IE29.05.2022
LU29.05.2022
BE31.05.2022
CH31.05.2022
FR31.05.2022
LI31.05.2022
Former [2023/35]AL05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
IT05.01.2022
LT05.01.2022
LV05.01.2022
MC05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SI05.01.2022
SK05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
IE29.05.2022
LU29.05.2022
BE31.05.2022
CH31.05.2022
FR31.05.2022
LI31.05.2022
Former [2023/26]AL05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
MC05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SI05.01.2022
SK05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
IE29.05.2022
LU29.05.2022
BE31.05.2022
CH31.05.2022
FR31.05.2022
LI31.05.2022
Former [2023/22]AL05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
MC05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SI05.01.2022
SK05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
IE29.05.2022
LU29.05.2022
CH31.05.2022
FR31.05.2022
LI31.05.2022
Former [2023/20]AL05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
MC05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SI05.01.2022
SK05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
IE29.05.2022
LU29.05.2022
CH31.05.2022
LI31.05.2022
Former [2023/10]AL05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
MC05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SI05.01.2022
SK05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
LU29.05.2022
CH31.05.2022
LI31.05.2022
Former [2023/09]AL05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
MC05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SK05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
LU29.05.2022
CH31.05.2022
LI31.05.2022
Former [2023/08]AL05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
MC05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SK05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
LU29.05.2022
Former [2023/06]AL05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
MC05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SK05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
Former [2023/01]AL05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SK05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
Former [2022/49]CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SK05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
Former [2022/48]CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
Former [2022/47]DK05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
Former [2022/46]DK05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
NL05.01.2022
PL05.01.2022
RS05.01.2022
SE05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
Former [2022/42]ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
NL05.01.2022
PL05.01.2022
RS05.01.2022
SE05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
Former [2022/39]ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
NL05.01.2022
PL05.01.2022
RS05.01.2022
SE05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
PT05.05.2022
Former [2022/36]ES05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
NL05.01.2022
PL05.01.2022
RS05.01.2022
SE05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
PT05.05.2022
Former [2022/35]ES05.01.2022
HR05.01.2022
LT05.01.2022
NL05.01.2022
RS05.01.2022
SE05.01.2022
BG05.04.2022
NO05.04.2022
PT05.05.2022
Former [2022/34]ES05.01.2022
LT05.01.2022
NL05.01.2022
NO05.04.2022
PT05.05.2022
Former [2022/33]LT05.01.2022
NL05.01.2022
NO05.04.2022
Former [2022/31]NL05.01.2022
Documents cited:Search[Y]EP3263787  (BTE STELCON GMBH [DE]) [Y] 1-20 * paragraphs [0001] , [0003] - [0005] - [0007] - [0014] - [0016] - [0018] - [0020] - [0023] * * figures 1,2; claims 1-14 *;
 [Y]DE19928339  (HILTERHAUS KARL HEINZ [DE]) [Y] 1-20 * the whole document *;
 [YA]US9347232  (FRANCIES III SIDNEY E [US]) [Y] 8,20 * column 1, lines 14-16 * * column 2, lines 14-55 * * column 3, lines 5-31 * * column 4, line 44 - column 5, line 49 * * column 13, lines 1-4 * * figures 1,3,18,19,24A,24B * [A] 1-7,9-19;
 [YA]EP0224048  (RUEHL JOH CHR BAU GMBH [DE]) [Y] 9,19,20 * the whole document * [A] 1-8,10-18;
 [YA]KR20160111753  (CONVISIONS CO LTD [KR]) [Y] 12-14,19,20 * paragraphs [0001] , [0 24] - [0041] * * figures 1-11 * [A] 1-11,15-18;
 [YA]KR101641048B  (GUDULTECH CO LTD [KR]) [Y] 16,17 * paragraphs [0001] , [0007] , [0011] - [0026] * * figures 1-2b,3d * [A] 1-15,18-20;
 [A]DE4320118  (HENKEL KGAA [DE], et al) [A] 1-20 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.