EP3751813 - DEVICE AND METHOD FOR PERFORMING THREAT DETECTION AND/OR MITIGATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 26.01.2024 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 17.02.2023 | ||
Former | Grant of patent is intended Status updated on 19.10.2022 | ||
Former | Request for examination was made Status updated on 30.09.2022 | ||
Former | Grant of patent is intended Status updated on 29.05.2022 | ||
Former | Request for examination was made Status updated on 18.06.2021 | ||
Former | The application has been published Status updated on 13.11.2020 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states ABB Schweiz AG Bruggerstrasse 66 5400 Baden / CH | [2022/45] |
Former [2020/51] | For all designated states ABB Schweiz AG Brown Boveri Strasse 6 5400 Baden / CH | Inventor(s) | 01 /
LOCHER, Thomas Otto Schütz-Weg 3 8050 Zürich / CH | 02 /
PIGNOLET, Yvonne-Anne 8808 Pfaeffikon / CH | 03 /
FERRANTI, Ettore Rotbuechstrasse 10 8165 Schleinikon / CH | 04 /
EIDENBENZ, Raphael Frankentalerstrasse 20 8049 Zürich / CH | 05 /
SCHOENBORN, Sandro Hauensteinstrasse 128 4059 Basel / CH | [2023/11] |
Former [2020/51] | 01 /
LOCHER, Thomas Otto Schütz-Weg 3 8050 Zürich / CH | ||
02 /
PIGNOLET, Yvonne-Anne Röntgenstrasse 47 8005 Zürich / CH | |||
03 /
FERRANTI, Ettore Rotbuechstrasse 10 8165 Schleinikon / CH | |||
04 /
EIDENBENZ, Raphael Frankentalerstrasse 20 8049 Zürich / CH | |||
05 /
SCHOENBORN, Sandro Hauensteinstrasse 128 4059 Basel / CH | Representative(s) | Zimmermann & Partner Patentanwälte mbB Postfach 330 920 80069 München / DE | [2020/51] | Application number, filing date | 19180060.6 | 13.06.2019 | [2020/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3751813 | Date: | 16.12.2020 | Language: | EN | [2020/51] | Type: | B1 Patent specification | No.: | EP3751813 | Date: | 22.03.2023 | Language: | EN | [2023/12] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 11.10.2019 | Classification | IPC: | H04L9/40, H04L67/12, G06F21/55 | [2022/24] | CPC: |
G06F21/55 (EP);
H04L63/1425 (EP);
H04L67/12 (EP);
H04W12/65 (EP);
Y04S40/18 (EP);
Y04S40/20 (EP)
|
Former IPC [2020/51] | H04L29/06, H04L29/08, G06F21/55 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/29] |
Former [2020/51] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VORRICHTUNG UND VERFAHREN ZUR DURCHFÜHRUNG VON GEFAHRENERKENNUNG UND/ODER -ABSCHWÄCHUNG | [2020/51] | English: | DEVICE AND METHOD FOR PERFORMING THREAT DETECTION AND/OR MITIGATION | [2020/51] | French: | DISPOSITIF ET PROCÉDÉ PERMETTANT D'EFFECTUER UNE DÉTECTION ET/OU ATTÉNUATION DE MENACES | [2020/51] | Examination procedure | 16.06.2021 | Amendment by applicant (claims and/or description) | 16.06.2021 | Examination requested [2021/29] | 16.06.2021 | Date on which the examining division has become responsible | 30.05.2022 | Communication of intention to grant the patent | 30.09.2022 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 19.10.2022 | Communication of intention to grant the patent | 09.02.2023 | Fee for grant paid | 09.02.2023 | Fee for publishing/printing paid | 09.02.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 02.01.2024 | No opposition filed within time limit [2024/09] | Fees paid | Renewal fee | 22.06.2021 | Renewal fee patent year 03 | 27.06.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 22.03.2023 | CZ | 22.03.2023 | DK | 22.03.2023 | EE | 22.03.2023 | ES | 22.03.2023 | FI | 22.03.2023 | HR | 22.03.2023 | IT | 22.03.2023 | LT | 22.03.2023 | LV | 22.03.2023 | MC | 22.03.2023 | NL | 22.03.2023 | PL | 22.03.2023 | RO | 22.03.2023 | RS | 22.03.2023 | SE | 22.03.2023 | SI | 22.03.2023 | SK | 22.03.2023 | SM | 22.03.2023 | IE | 13.06.2023 | LU | 13.06.2023 | NO | 22.06.2023 | GR | 23.06.2023 | BE | 30.06.2023 | IS | 22.07.2023 | PT | 24.07.2023 | [2024/26] |
Former [2024/25] | AT | 22.03.2023 | |
CZ | 22.03.2023 | ||
DK | 22.03.2023 | ||
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
MC | 22.03.2023 | ||
NL | 22.03.2023 | ||
PL | 22.03.2023 | ||
RO | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
SI | 22.03.2023 | ||
SK | 22.03.2023 | ||
SM | 22.03.2023 | ||
IE | 13.06.2023 | ||
LU | 13.06.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
BE | 30.06.2023 | ||
IS | 22.07.2023 | ||
PT | 24.07.2023 | ||
Former [2024/21] | AT | 22.03.2023 | |
CZ | 22.03.2023 | ||
DK | 22.03.2023 | ||
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
MC | 22.03.2023 | ||
NL | 22.03.2023 | ||
PL | 22.03.2023 | ||
RO | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
SI | 22.03.2023 | ||
SK | 22.03.2023 | ||
SM | 22.03.2023 | ||
IE | 13.06.2023 | ||
LU | 13.06.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
IS | 22.07.2023 | ||
PT | 24.07.2023 | ||
Former [2024/15] | AT | 22.03.2023 | |
CZ | 22.03.2023 | ||
DK | 22.03.2023 | ||
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
MC | 22.03.2023 | ||
NL | 22.03.2023 | ||
PL | 22.03.2023 | ||
RO | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
SI | 22.03.2023 | ||
SK | 22.03.2023 | ||
SM | 22.03.2023 | ||
LU | 13.06.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
IS | 22.07.2023 | ||
PT | 24.07.2023 | ||
Former [2024/10] | AT | 22.03.2023 | |
CZ | 22.03.2023 | ||
DK | 22.03.2023 | ||
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
MC | 22.03.2023 | ||
NL | 22.03.2023 | ||
PL | 22.03.2023 | ||
RO | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
SI | 22.03.2023 | ||
SK | 22.03.2023 | ||
SM | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
IS | 22.07.2023 | ||
PT | 24.07.2023 | ||
Former [2024/09] | AT | 22.03.2023 | |
CZ | 22.03.2023 | ||
DK | 22.03.2023 | ||
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
MC | 22.03.2023 | ||
NL | 22.03.2023 | ||
PL | 22.03.2023 | ||
RO | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
SK | 22.03.2023 | ||
SM | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
IS | 22.07.2023 | ||
PT | 24.07.2023 | ||
Former [2023/50] | AT | 22.03.2023 | |
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
NL | 22.03.2023 | ||
PL | 22.03.2023 | ||
RO | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
SK | 22.03.2023 | ||
SM | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
IS | 22.07.2023 | ||
PT | 24.07.2023 | ||
Former [2023/49] | AT | 22.03.2023 | |
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
NL | 22.03.2023 | ||
RO | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
SM | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
PT | 24.07.2023 | ||
Former [2023/48] | AT | 22.03.2023 | |
EE | 22.03.2023 | ||
ES | 22.03.2023 | ||
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
NL | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
SM | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
PT | 24.07.2023 | ||
Former [2023/46] | ES | 22.03.2023 | |
FI | 22.03.2023 | ||
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
NL | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
SM | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
PT | 24.07.2023 | ||
Former [2023/38] | FI | 22.03.2023 | |
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
NL | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
Former [2023/37] | FI | 22.03.2023 | |
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
NO | 22.06.2023 | ||
GR | 23.06.2023 | ||
Former [2023/36] | FI | 22.03.2023 | |
HR | 22.03.2023 | ||
LT | 22.03.2023 | ||
LV | 22.03.2023 | ||
RS | 22.03.2023 | ||
SE | 22.03.2023 | ||
NO | 22.06.2023 | ||
Former [2023/35] | HR | 22.03.2023 | |
LT | 22.03.2023 | ||
RS | 22.03.2023 | ||
NO | 22.06.2023 | ||
Former [2023/34] | LT | 22.03.2023 | |
RS | 22.03.2023 | ||
Former [2023/33] | LT | 22.03.2023 | Documents cited: | Search | [XA]EP2657880 (VERINT SYSTEMS LTD [IL]) [X] 1-7,9-15 * abstract * * paragraphs [0017] - [0025] * * paragraphs [0034] , [0 35] * * paragraphs [0061] - [0064] *[A] 8; | [XA]EP2779569 (GEN ELECTRIC [US]) [X] 1-7,9-15 * abstract * * paragraphs [0013] , [0 16] , [0 17] * * paragraphs [0019] , [0 25] , [0 28] * [A] 8 |