EP3594601 - THERMAL STORAGE SYSTEM (TSS) BY PHASE CHANGE MATERIALS (PCM) COMPRISING A DEVICE FOR CONTROLLING CRYSTALLISATION BY GAS INJECTION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.08.2022 Database last updated on 03.08.2024 | |
Former | The patent has been granted Status updated on 03.09.2021 | ||
Former | Grant of patent is intended Status updated on 09.05.2021 | ||
Former | Request for examination was made Status updated on 31.03.2021 | ||
Former | Grant of patent is intended Status updated on 07.12.2020 | ||
Former | Request for examination was made Status updated on 13.12.2019 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Commissariat à l'Energie Atomique et aux Energies Alternatives Bâtiment "Le Ponant D" 25, rue Leblanc 75015 Paris / FR | [2020/03] | Inventor(s) | 01 /
BENTIVOGLIO, Fabrice CEA GRENOBLE 17 avenue des Martyrs 38054 GRENOBLE CEDEX 09 / FR | 02 /
SORIANO, Olivier CEA GRENOBLE 17 avenue des Martyrs 38054 GRENOBLE CEDEX 09 / FR | [2020/03] | Representative(s) | Brizio Delaporte, Allison Cabinet Hautier 20, rue de la Liberté 06000 Nice / FR | [2020/03] | Application number, filing date | 19181019.1 | 18.06.2019 | [2020/03] | Priority number, date | FR20180055548 | 22.06.2018 Original published format: FR 1855548 | [2020/03] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP3594601 | Date: | 15.01.2020 | Language: | FR | [2020/03] | Type: | B1 Patent specification | No.: | EP3594601 | Date: | 06.10.2021 | Language: | FR | [2021/40] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 16.12.2019 | Classification | IPC: | F28D20/02 | [2020/03] | CPC: |
F28D20/021 (EP);
F28D20/028 (EP);
F28D2020/0069 (EP);
Y02E60/14 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/03] | Title | German: | THERMISCHES SPEICHERSYSTEM ANHAND VON PHASENWECHSELMATERIAL (PCM), DAS EINE KONTROLLVORRICHTUNG DER KRISTALLISATION DURCH GASEINSPRITZUNG UMFASST | [2020/03] | English: | THERMAL STORAGE SYSTEM (TSS) BY PHASE CHANGE MATERIALS (PCM) COMPRISING A DEVICE FOR CONTROLLING CRYSTALLISATION BY GAS INJECTION | [2020/03] | French: | SYSTÈME DE STOCKAGE THERMIQUE (SST) PAR MATÉRIAUX À CHANGEMENT DE PHASE (MCP) COMPRENANT UN DISPOSITIF DE CONTRÔLE DE LA CRISTALLISATION PAR INJECTION DE GAZ | [2020/03] | Examination procedure | 18.06.2019 | Examination requested [2020/03] | 08.12.2020 | Communication of intention to grant the patent | 30.03.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 10.05.2021 | Communication of intention to grant the patent | 30.08.2021 | Fee for grant paid | 30.08.2021 | Fee for publishing/printing paid | 30.08.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 07.07.2022 | No opposition filed within time limit [2022/37] | Fees paid | Renewal fee | 28.05.2021 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.06.2019 | AL | 06.10.2021 | AT | 06.10.2021 | CY | 06.10.2021 | CZ | 06.10.2021 | EE | 06.10.2021 | ES | 06.10.2021 | HR | 06.10.2021 | LT | 06.10.2021 | LV | 06.10.2021 | MC | 06.10.2021 | MK | 06.10.2021 | NL | 06.10.2021 | PL | 06.10.2021 | RO | 06.10.2021 | RS | 06.10.2021 | SI | 06.10.2021 | SK | 06.10.2021 | SM | 06.10.2021 | TR | 06.10.2021 | BG | 06.01.2022 | NO | 06.01.2022 | GR | 07.01.2022 | IS | 06.02.2022 | PT | 07.02.2022 | IE | 18.06.2022 | LU | 18.06.2022 | BE | 30.06.2022 | CH | 30.06.2022 | LI | 30.06.2022 | [2024/29] |
Former [2024/25] | HU | 18.06.2019 | |
AL | 06.10.2021 | ||
AT | 06.10.2021 | ||
CY | 06.10.2021 | ||
CZ | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
MK | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
IE | 18.06.2022 | ||
LU | 18.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2024/23] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CY | 06.10.2021 | ||
CZ | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
MK | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
IE | 18.06.2022 | ||
LU | 18.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2024/20] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CY | 06.10.2021 | ||
CZ | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
IE | 18.06.2022 | ||
LU | 18.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/25] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
IE | 18.06.2022 | ||
LU | 18.06.2022 | ||
BE | 30.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/21] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
IE | 18.06.2022 | ||
LU | 18.06.2022 | ||
CH | 30.06.2022 | ||
LI | 30.06.2022 | ||
Former [2023/20] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
IE | 18.06.2022 | ||
Former [2023/08] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2023/01] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/49] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/35] | AT | 06.10.2021 | |
CZ | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/34] | AT | 06.10.2021 | |
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/33] | AT | 06.10.2021 | |
ES | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RS | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/25] | AT | 06.10.2021 | |
ES | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RS | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/24] | AT | 06.10.2021 | |
ES | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RS | 06.10.2021 | ||
BG | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/23] | AT | 06.10.2021 | |
ES | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
PL | 06.10.2021 | ||
RS | 06.10.2021 | ||
BG | 06.01.2022 | ||
PT | 07.02.2022 | ||
Former [2022/22] | AT | 06.10.2021 | |
LT | 06.10.2021 | ||
RS | 06.10.2021 | ||
BG | 06.01.2022 | ||
Former [2022/21] | AT | 06.10.2021 | |
RS | 06.10.2021 | ||
BG | 06.01.2022 | ||
Former [2022/19] | BG | 06.01.2022 | Documents cited: | Search | [A]DE19731351 (ROBIONEK HANS JOACHIM [DE]) [A] 1* figure 1 *; | [A]JPH1144494 (MITSUBISHI CHEM ENG CORP) [A] 1-15 * figure 1 *; | [A]EP3312539 (COMMISSARIAT ENERGIE ATOMIQUE [FR]) [A] 1-15 * figure 1 * |