blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3587343

EP3587343 - METHOD FOR MANUFACTURING AN AT LEAST PARTIALLY TRANSPARENT DEVICE INCLUDING A STRUCTURE SUCH AS A CAPACITOR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.04.2022
Database last updated on 17.09.2024
FormerThe patent has been granted
Status updated on  14.05.2021
FormerGrant of patent is intended
Status updated on  18.12.2020
FormerRequest for examination was made
Status updated on  05.12.2019
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Commissariat à l'énergie atomique et aux énergies alternatives
Bâtiment "Le Ponant D"
25 rue Leblanc
75015 Paris / FR
[2020/01]
Inventor(s)01 / LE RHUN, Gwenaël
CEA GRENOBLE
17 rue des Martyrs
38054 GRENOBLE CEDEX 09 / FR
 [2020/01]
Representative(s)Brevalex
Tour Trinity
1 B Place de la Défense
92400 Courbevoie / FR
[N/P]
Former [2020/01]Brevalex
95, rue d'Amsterdam
75378 Paris Cedex 8 / FR
Application number, filing date19181163.719.06.2019
[2020/01]
Priority number, dateFR2018005559222.06.2018         Original published format: FR 1855592
[2020/01]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP3587343
Date:01.01.2020
Language:FR
[2020/01]
Type: B1 Patent specification 
No.:EP3587343
Date:16.06.2021
Language:FR
[2021/24]
Search report(s)(Supplementary) European search report - dispatched on:EP05.11.2019
ClassificationIPC:B81C1/00
[2020/01]
CPC:
B81C1/0038 (EP); B06B1/0666 (US); H01L28/55 (US);
H10B53/30 (US); H10N15/15 (US); H10N30/06 (US);
H10N30/073 (US); H10N30/085 (US); H10N30/8554 (US);
B81C2201/0195 (EP); H10N30/082 (US); H10N30/853 (US);
H10N30/8536 (US); H10N30/8542 (US); H10N30/8548 (US);
H10N30/8561 (US); H10N30/878 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/01]
TitleGerman:HERSTELLUNGSVERFAHREN EINER VORRICHTUNG, DIE ZUMINDEST TEILWEISE TRANSPARENT IST UND EINE STRUKTUR VOM TYP KONDENSATOR UMFASST[2020/01]
English:METHOD FOR MANUFACTURING AN AT LEAST PARTIALLY TRANSPARENT DEVICE INCLUDING A STRUCTURE SUCH AS A CAPACITOR[2020/01]
French:PROCEDE DE REALISATION D'UN DISPOSITIF AU MOINS PARTIELLEMENT TRANSPARENT INTEGRANT UNE STRUCTURE DE TYPE CONDENSATEUR[2020/01]
Examination procedure19.06.2019Examination requested  [2020/01]
30.06.2020Amendment by applicant (claims and/or description)
13.01.2021Communication of intention to grant the patent
07.05.2021Fee for grant paid
07.05.2021Fee for publishing/printing paid
07.05.2021Receipt of the translation of the claim(s)
Opposition(s)17.03.2022No opposition filed within time limit [2022/21]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.06.2019
AL16.06.2021
AT16.06.2021
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
MK16.06.2021
MT16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
TR16.06.2021
IE19.06.2021
LU19.06.2021
BE30.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
[2024/42]
Former [2024/29]HU19.06.2019
AL16.06.2021
AT16.06.2021
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
MK16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
TR16.06.2021
IE19.06.2021
LU19.06.2021
BE30.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2024/23]HU19.06.2019
AL16.06.2021
AT16.06.2021
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
MK16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
IE19.06.2021
LU19.06.2021
BE30.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2023/33]HU19.06.2019
AL16.06.2021
AT16.06.2021
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
IE19.06.2021
LU19.06.2021
BE30.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2023/30]AL16.06.2021
AT16.06.2021
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
IE19.06.2021
LU19.06.2021
BE30.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/34]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
IE19.06.2021
LU19.06.2021
BE30.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/29]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
IE19.06.2021
LU19.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/26]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
IE19.06.2021
LU19.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/21]AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
IE19.06.2021
LU19.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/18]AT16.06.2021
CZ16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
LU19.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/11]AT16.06.2021
CZ16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/09]AT16.06.2021
CZ16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
PT18.10.2021
Former [2022/08]AT16.06.2021
CZ16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
RS16.06.2021
SE16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
Former [2022/07]AT16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
RS16.06.2021
SE16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
Former [2021/51]FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
RS16.06.2021
SE16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
Former [2021/49]FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
SE16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
Former [2021/46]FI16.06.2021
LT16.06.2021
BG16.09.2021
Documents cited:Search[A]US2013322663  (MELCHER JOERG [DE], et al);
 [A]US2018082989  (FONG THEODORE E [US], et al)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.