EP3594025 - PNEUMATIC TIRE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 31.12.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 22.01.2021 | ||
Former | Grant of patent is intended Status updated on 09.11.2020 | ||
Former | Examination is in progress Status updated on 07.08.2020 | ||
Former | Request for examination was made Status updated on 20.03.2020 | ||
Former | The application has been published Status updated on 13.12.2019 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Sumitomo Rubber Industries, Ltd. 6-9, Wakinohama-cho 3-chome Chuo-ku Kobe-shi Hyogo-ken 651-0072 / JP | [2020/03] | Inventor(s) | 01 /
HIGUCHI, Keiji c/o Sumitomo Rubber Industries, Ltd. 6-9, Wakinohama-cho 3-chome Chuo-ku Kobe-shi, Hyogo 651-0072 / JP | 02 /
KODAMA, Kenji c/o Sumitomo Rubber Industries, Ltd. 6-9, Wakinohama-cho 3-chome Chuo-ku Kobe-shi, Hyogo 651-0072 / JP | 03 /
UJIGAWA, Kazuma c/o Sumitomo Rubber Industries, Ltd. 6-9, Wakinohama-cho 3-chome Chuo-ku Kobe-shi, Hyogo 651-0072 / JP | 04 /
UEYAMA, Kiyotaka c/o Sumitomo Rubber Industries, Ltd. 6-9, Wakinohama-cho 3-chome Chuo-ku Kobe-shi, Hyogo 651-0072 / JP | [2020/03] | Representative(s) | Manitz Finsterwald Patent- und Rechtsanwaltspartnerschaft mbB Martin-Greif-Strasse 1 80336 München / DE | [2020/03] | Application number, filing date | 19185307.6 | 09.07.2019 | [2020/03] | Priority number, date | JP20180132269 | 12.07.2018 Original published format: JP 2018132269 | [2020/03] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3594025 | Date: | 15.01.2020 | Language: | EN | [2020/03] | Type: | B1 Patent specification | No.: | EP3594025 | Date: | 24.02.2021 | Language: | EN | [2021/08] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.11.2019 | Classification | IPC: | B60C15/024, B60C17/00, B60C15/00 | [2020/03] | CPC: |
B60C15/0242 (EP,US);
B60C13/00 (CN);
B60C15/0072 (US);
B60C15/0009 (CN);
B60C15/0045 (EP);
B60C15/02 (CN);
B60C15/024 (US);
B60C15/06 (US);
B60C15/0603 (US);
B60C15/0628 (CN);
B60C17/00 (CN);
B60C17/0009 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/17] |
Former [2020/03] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | LUFTREIFEN | [2020/03] | English: | PNEUMATIC TIRE | [2020/03] | French: | PNEUMATIQUE | [2020/03] | Examination procedure | 18.03.2020 | Examination requested [2020/17] | 18.03.2020 | Date on which the examining division has become responsible | 24.06.2020 | Amendment by applicant (claims and/or description) | 10.08.2020 | Despatch of a communication from the examining division (Time limit: M04) | 03.09.2020 | Reply to a communication from the examining division | 10.11.2020 | Communication of intention to grant the patent | 11.01.2021 | Fee for grant paid | 11.01.2021 | Fee for publishing/printing paid | 11.01.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 25.11.2021 | No opposition filed within time limit [2022/05] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.07.2019 | AL | 24.02.2021 | AT | 24.02.2021 | CY | 24.02.2021 | CZ | 24.02.2021 | DK | 24.02.2021 | EE | 24.02.2021 | ES | 24.02.2021 | FI | 24.02.2021 | HR | 24.02.2021 | IT | 24.02.2021 | LT | 24.02.2021 | LV | 24.02.2021 | MC | 24.02.2021 | MK | 24.02.2021 | MT | 24.02.2021 | NL | 24.02.2021 | PL | 24.02.2021 | RO | 24.02.2021 | RS | 24.02.2021 | SE | 24.02.2021 | SI | 24.02.2021 | SK | 24.02.2021 | SM | 24.02.2021 | TR | 24.02.2021 | BG | 24.05.2021 | NO | 24.05.2021 | GR | 25.05.2021 | IS | 24.06.2021 | PT | 24.06.2021 | IE | 09.07.2021 | LU | 09.07.2021 | BE | 31.07.2021 | [2024/42] |
Former [2024/29] | HU | 09.07.2019 | |
AL | 24.02.2021 | ||
AT | 24.02.2021 | ||
CY | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
MK | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
TR | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
IE | 09.07.2021 | ||
LU | 09.07.2021 | ||
BE | 31.07.2021 | ||
Former [2024/23] | HU | 09.07.2019 | |
AL | 24.02.2021 | ||
AT | 24.02.2021 | ||
CY | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
MK | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
IE | 09.07.2021 | ||
LU | 09.07.2021 | ||
BE | 31.07.2021 | ||
Former [2023/33] | HU | 09.07.2019 | |
AL | 24.02.2021 | ||
AT | 24.02.2021 | ||
CY | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
IE | 09.07.2021 | ||
LU | 09.07.2021 | ||
BE | 31.07.2021 | ||
Former [2023/30] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CY | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
IE | 09.07.2021 | ||
LU | 09.07.2021 | ||
BE | 31.07.2021 | ||
Former [2022/35] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
IE | 09.07.2021 | ||
LU | 09.07.2021 | ||
BE | 31.07.2021 | ||
Former [2022/34] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
LU | 09.07.2021 | ||
BE | 31.07.2021 | ||
Former [2022/23] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
LU | 09.07.2021 | ||
Former [2022/18] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2022/13] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2022/10] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2022/08] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2022/07] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/50] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SK | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/49] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/48] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/47] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/46] | AT | 24.02.2021 | |
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/42] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/39] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
PL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/38] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/37] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
RS | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/36] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/35] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
NO | 24.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/33] | FI | 24.02.2021 | |
LT | 24.02.2021 | ||
NO | 24.05.2021 | ||
PT | 24.06.2021 | Documents cited: | Search | [A]JPH11157311 (BRIDGESTONE CORP) [A] 1-12* abstract *; | [Y]EP2072289 (SUMITOMO RUBBER IND [JP]) [Y] 1 * paragraphs [0065] , [0066] , [0069]; figure 1 *; | [A]US2013270892 (NAKAYAMA SOUTO [JP]) [A] 1,2 * paragraph [0029]; figure 1; table 1 *; | [IA]US2016001608 (ABDALLAH JR DAVID G [US], et al) [I] 1-5,12 * paragraphs [0027] , [0039]; figures 1,2 * [A] 6-11; | [XAY]US2017225522 (TOMITA SHINTARO [JP], et al) [X] 1-5 * paragraphs [0101] , [0126] , [0127] , [0203]; figures 1,2 * [A] 6-12 [Y] 1; | [IA]EP3315327 (SUMITOMO RUBBER IND [JP]) [I] 1-5,10 * paragraphs [0072] , [0073] , [0089]; figures 1,2 * [A] 6-9,11,12; | [IPA]WO2019115055 (CONTINENTAL REIFEN DEUTSCHLAND GMBH [DE]) [IP] 1,3 * figure .; claim 1 * [A] 2,4-12; | [XPA]EP3505371 (SUMITOMO RUBBER IND [JP]) [XP] 1,3-5 * paragraphs [0083] , [0088]; figure 2 * [A] 2,6-12 | by applicant | JP2015199473 | JP2018132269 |