EP3593765 - PROSTHETIC SOCKET FOR A CONNECTION TO A LOWER LIMB PROSTHESIS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.03.2023 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 02.04.2022 | ||
Former | Grant of patent is intended Status updated on 10.01.2022 | ||
Former | Request for examination was made Status updated on 17.07.2020 | ||
Former | The application has been published Status updated on 13.12.2019 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Livit Orthopedie B.V. Kabelweg 40 1014 BB Amsterdam / NL | [2020/03] | Inventor(s) | 01 /
De Kiefte, Bertus Evert Colorado 102 3315 WD DORDRECHT / NL | 02 /
Ravestein, Maurits Willem Saffier 31 2651 SZ BERKEL EN RODENRIJS / NL | [2020/03] | Representative(s) | Luten, Martin Haaije, et al Arnold & Siedsma Bezuidenhoutseweg 57 2594 AC The Hague / NL | [2020/03] | Application number, filing date | 19185766.3 | 11.07.2019 | [2020/03] | Priority number, date | NL20182021306 | 13.07.2018 Original published format: NL 2021306 | [2020/03] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3593765 | Date: | 15.01.2020 | Language: | EN | [2020/03] | Type: | B1 Patent specification | No.: | EP3593765 | Date: | 04.05.2022 | Language: | EN | [2022/18] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.08.2019 | Classification | IPC: | A61F2/80 | [2020/03] | CPC: |
A61F2/80 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/34] |
Former [2020/03] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | PROTHESENSCHAFT FÜR EINE VERBINDUNG MIT EINER UNTERSCHENKELPROTHESE | [2020/03] | English: | PROSTHETIC SOCKET FOR A CONNECTION TO A LOWER LIMB PROSTHESIS | [2020/03] | French: | EMBOÎTURE DE PROTHÈSE POUR UNE CONNEXION À UNE PROTHÈSE DE MEMBRE INFÉRIEUR | [2020/03] | Examination procedure | 14.07.2020 | Amendment by applicant (claims and/or description) | 14.07.2020 | Examination requested [2020/34] | 14.07.2020 | Date on which the examining division has become responsible | 11.01.2022 | Communication of intention to grant the patent | 24.03.2022 | Fee for grant paid | 24.03.2022 | Fee for publishing/printing paid | 24.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 07.02.2023 | No opposition filed within time limit [2023/15] | Fees paid | Renewal fee | 27.07.2021 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.07.2019 | AL | 04.05.2022 | AT | 04.05.2022 | CY | 04.05.2022 | CZ | 04.05.2022 | DK | 04.05.2022 | EE | 04.05.2022 | ES | 04.05.2022 | HR | 04.05.2022 | LT | 04.05.2022 | LV | 04.05.2022 | MC | 04.05.2022 | MK | 04.05.2022 | RO | 04.05.2022 | RS | 04.05.2022 | SI | 04.05.2022 | SK | 04.05.2022 | SM | 04.05.2022 | IE | 11.07.2022 | LU | 11.07.2022 | CH | 31.07.2022 | LI | 31.07.2022 | BG | 04.08.2022 | NO | 04.08.2022 | GR | 05.08.2022 | IS | 04.09.2022 | PT | 05.09.2022 | [2024/23] |
Former [2024/20] | HU | 11.07.2019 | |
AL | 04.05.2022 | ||
AT | 04.05.2022 | ||
CY | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 11.07.2022 | ||
LU | 11.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2024/18] | HU | 11.07.2019 | |
AL | 04.05.2022 | ||
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 11.07.2022 | ||
LU | 11.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/33] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 11.07.2022 | ||
LU | 11.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/25] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
LU | 11.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/21] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
LU | 11.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/17] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/11] | AT | 04.05.2022 | |
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/09] | AT | 04.05.2022 | |
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/07] | AT | 04.05.2022 | |
DK | 04.05.2022 | ||
ES | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
RS | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2022/51] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
RS | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2022/50] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
RS | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/49] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/47] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
LT | 04.05.2022 | ||
NO | 04.08.2022 | ||
PT | 05.09.2022 | Documents cited: | Search | [XI]AU686514B (MADAN MOHAN TELIKICHERLA) [X] 1-6,9,11,12 * abstract * * page 18, paragraph 3 - paragraph 4 * * page 19, paragraph 1 - paragraph 2 * [I] 7,8,10,13-15; | [XI]US2010036505 (HASSLER ANDREAS [DE]) [X] 1-6,9,11,12 * abstract * [I] 7,8,10,13-15; | [X]WO2013071308 (LIM INNOVATIONS INC [US]) [X] 1-15* abstract * |