EP3604715 - STRAKE FOR SCRUTON HELIX, METHOD FOR ASSEMBLING A SCRUTON HELIX AND METHOD FOR ERECTING A WIND POWER PLANT [Right-click to bookmark this link] | |||
Former [2020/06] | STRAND FOR SCRUTON SPIRAL, METHOD FOR ASSEMBLING A SCRUTON SPIRAL AND METHOD FOR ERECTING A WIND POWER PLANT | ||
[2021/31] | Status | No opposition filed within time limit Status updated on 05.08.2022 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 27.08.2021 | ||
Former | Grant of patent is intended Status updated on 24.02.2021 | ||
Former | Request for examination was made Status updated on 03.07.2020 | ||
Former | The application has been published Status updated on 03.01.2020 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Nordex Energy SE & Co. KG Langenhorner Chaussee 600 22419 Hamburg / DE | [2021/07] |
Former [2020/06] | For all designated states Nordex Energy GmbH Langenhorner Chaussee 600 22419 Hamburg / DE | Inventor(s) | 01 /
Jensen, Christin Meiereistr. 17 24991 Großsolt / DE | 02 /
Fingerhut, Stephan Hinter der Twiete 35 22851 Norderstedt / DE | 03 /
Hartung, Bastian Hellbrookstr. 78 22305 Hamburg / DE | [2020/06] | Representative(s) | Hauck Patentanwaltspartnerschaft mbB Postfach 11 31 53 20431 Hamburg / DE | [2020/06] | Application number, filing date | 19189869.1 | 02.08.2019 | [2020/06] | Priority number, date | DE201810118965 | 03.08.2018 Original published format: DE102018118965 | [2020/06] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3604715 | Date: | 05.02.2020 | Language: | DE | [2020/06] | Type: | B1 Patent specification | No.: | EP3604715 | Date: | 29.09.2021 | Language: | DE | [2021/39] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.12.2019 | Classification | IPC: | E04H12/34, F03D13/20, F15D1/10 | [2020/06] | CPC: |
E04H12/342 (EP);
F03D13/20 (EP);
F03D80/00 (EP);
B63B2021/504 (EP);
B63B2035/4446 (EP);
F03D13/10 (EP);
F05B2230/61 (EP);
F05B2260/96 (EP);
Y02E10/72 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/32] |
Former [2020/06] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | STRANG FÜR EINE SCRUTON-SPIRALE, VERFAHREN ZUM MONTIEREN EINER SCRUTON-SPIRALE SOWIE VERFAHREN ZUM ERRICHTEN EINER WINDENERGIEANLAGE | [2020/06] | English: | STRAKE FOR SCRUTON HELIX, METHOD FOR ASSEMBLING A SCRUTON HELIX AND METHOD FOR ERECTING A WIND POWER PLANT | [2021/31] | French: | FILET POUR UNE HÉLICE SCRUTON, PROCÉDÉ DE MONTAGE D'UNE HÉLICE SCRUTON AINSI QUE PROCÉDÉ DE CONSTRUCTION D'UNE ÉOLIENNE | [2020/06] |
Former [2020/06] | STRAND FOR SCRUTON SPIRAL, METHOD FOR ASSEMBLING A SCRUTON SPIRAL AND METHOD FOR ERECTING A WIND POWER PLANT | Examination procedure | 30.06.2020 | Amendment by applicant (claims and/or description) | 30.06.2020 | Examination requested [2020/32] | 30.06.2020 | Date on which the examining division has become responsible | 25.02.2021 | Communication of intention to grant the patent | 22.06.2021 | Fee for grant paid | 22.06.2021 | Fee for publishing/printing paid | 22.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 30.06.2022 | No opposition filed within time limit [2022/36] | Fees paid | Renewal fee | 23.08.2021 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.08.2019 | AL | 29.09.2021 | CY | 29.09.2021 | CZ | 29.09.2021 | EE | 29.09.2021 | FI | 29.09.2021 | HR | 29.09.2021 | IT | 29.09.2021 | LT | 29.09.2021 | LV | 29.09.2021 | MC | 29.09.2021 | MK | 29.09.2021 | NL | 29.09.2021 | PL | 29.09.2021 | RO | 29.09.2021 | RS | 29.09.2021 | SE | 29.09.2021 | SI | 29.09.2021 | SK | 29.09.2021 | SM | 29.09.2021 | BG | 29.12.2021 | NO | 29.12.2021 | GR | 30.12.2021 | IS | 29.01.2022 | PT | 31.01.2022 | [2024/23] |
Former [2024/21] | HU | 02.08.2019 | |
AL | 29.09.2021 | ||
CY | 29.09.2021 | ||
CZ | 29.09.2021 | ||
EE | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
IT | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SI | 29.09.2021 | ||
SK | 29.09.2021 | ||
SM | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2024/20] | HU | 02.08.2019 | |
AL | 29.09.2021 | ||
CY | 29.09.2021 | ||
CZ | 29.09.2021 | ||
EE | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
IT | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SI | 29.09.2021 | ||
SK | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2024/18] | HU | 02.08.2019 | |
AL | 29.09.2021 | ||
CZ | 29.09.2021 | ||
EE | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
IT | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SI | 29.09.2021 | ||
SK | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2023/16] | AL | 29.09.2021 | |
CZ | 29.09.2021 | ||
EE | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
IT | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SI | 29.09.2021 | ||
SK | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2023/10] | AL | 29.09.2021 | |
CZ | 29.09.2021 | ||
EE | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
IT | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SI | 29.09.2021 | ||
SK | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2023/01] | AL | 29.09.2021 | |
CZ | 29.09.2021 | ||
EE | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SI | 29.09.2021 | ||
SK | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2022/29] | AL | 29.09.2021 | |
CZ | 29.09.2021 | ||
EE | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SK | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2022/24] | CZ | 29.09.2021 | |
EE | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SK | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2022/23] | CZ | 29.09.2021 | |
EE | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
PL | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SK | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
PT | 31.01.2022 | ||
Former [2022/10] | FI | 29.09.2021 | |
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
Former [2022/09] | FI | 29.09.2021 | |
LT | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
Former [2022/08] | FI | 29.09.2021 | |
LT | 29.09.2021 | ||
SE | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
Former [2022/07] | LT | 29.09.2021 | |
NO | 29.12.2021 | Documents cited: | Search | [A]EP3029313 (SIEMENS AG [DE]) [A] 1-15* figures 1, 3 *; | [A]CN205744309U (GOLDWIND SCIENCE & TECHNOLOGY) [A] 1-15 * figures 1, 14 *; | [A]US9803431 (ALLEN DONALD WAYNE [US], et al) [A] 1-15 * figure 1a *; | [XAI]WO2018083054 (SIEMENS AG [DE]) [X] 1,5,8,9 * figures 1, 3 * * page 7, line 27 - line 32 * [A] 2-4,10,14 [I] 6,7,11-13,15 | by applicant | GB907851 | DE1409401 | DE2804711 | EP1881195 | DE102010009435 | EP2851490 | EP3029313 | US2016312761 |