| EP3611137 - APPARATUS AND METHOD TO CONTROL GOB WEIGHT, LENGTH AND/OR SHAPE [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 19.02.2021 Database last updated on 11.04.2026 | |
| Former | Grant of patent is intended Status updated on 03.11.2020 | ||
| Former | Request for examination was made Status updated on 22.05.2020 | ||
| Former | The application has been published Status updated on 17.01.2020 | Most recent event Tooltip | 22.09.2025 | New entry: Date of oral proceedings | Applicant(s) | For all designated states Emhart Glass S.A. Hinterbergstrasse 22 6312 Steinhausen / CH | [2021/30] |
| Former [2020/08] | For all designated states EMHART GLASS Hinterbergstrasse 22 6312 Steinhausen / CH | Inventor(s) | 01 /
DING, Xu 20 Lexton Drive Farmington, CT Connecticut 06032 / US | 02 /
SIMON, Jonathan S. 168 Center Hill Road Pleasant Valley, CT Connecticut 06063 / US | [2020/08] | Representative(s) | Ashton, Gareth Mark, et al Baron Warren Redfern LLP 1000 Great West Road Brentford TW8 9DW / GB | [N/P] |
| Former [2020/08] | Ashton, Gareth Mark, et al Baron Warren Redfern 1000 Great West Road Brentford TW8 9DW / GB | Application number, filing date | 19191428.2 | 13.08.2019 | [2020/08] | Priority number, date | US201816103767 | 14.08.2018 Original published format: US201816103767 | [2020/08] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP3611137 | Date: | 19.02.2020 | Language: | EN | [2020/08] | Type: | A3 Search report | No.: | EP3611137 | Date: | 26.02.2020 | Language: | EN | [2020/09] | Type: | B1 Patent specification | No.: | EP3611137 | Date: | 24.03.2021 | Language: | EN | [2021/12] | Type: | B8 Corrected title page of specification | No.: | EP3611137 | Date: | 28.07.2021 | [2021/30] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.01.2020 | Classification | IPC: | C03B7/00, G05B13/04 | [2020/09] | CPC: |
C03B7/005 (EP,US);
C03B9/41 (US);
C03B9/14 (US);
G05B13/041 (EP,US)
|
| Former IPC [2020/08] | C03B7/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/26] |
| Former [2020/08] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VORRICHTUNG UND VERFAHREN ZUR STEUERUNG VON TROPFENGEWICHT, -LÄNGE UND/ODER -FORM | [2020/08] | English: | APPARATUS AND METHOD TO CONTROL GOB WEIGHT, LENGTH AND/OR SHAPE | [2020/08] | French: | APPAREIL ET PROCÉDÉ DE COMMANDE DE POIDS DE PARAISON, DE LONGUEUR ET/OU DE FORME | [2020/08] | Examination procedure | 19.05.2020 | Examination requested [2020/26] | 19.05.2020 | Date on which the examining division has become responsible | 04.11.2020 | Communication of intention to grant the patent | 09.02.2021 | Fee for grant paid | 09.02.2021 | Fee for publishing/printing paid | 09.02.2021 | Receipt of the translation of the claim(s) | 31.03.2021 | Request for correction of the decision to grant filed | Opposition(s) | Opponent(s) | 01
30.06.2021
Heye International GmbH Am Ziegeleiweg 3 31683 Obernkirchen / DE Opponent's representative Michalski Hüttermann & Partner Patentanwälte mbB Kaistraße 16A 40221 Düsseldorf / DE | [N/P] |
| Former [2021/31] | |||
| Opponent(s) | 01
30.06.2021
Heye International GmbH Am Ziegeleiweg 3 31683 Obernkirchen / DE Opponent's representative Michalski Hüttermann & Partner Patentanwälte mbB Speditionstraße 21 40221 Düsseldorf / DE | 18.01.2022 | Invitation to proprietor to file observations on the notice of opposition | 05.05.2022 | Reply of patent proprietor to notice(s) of opposition | 09.02.2023 | Date of oral proceedings | 05.04.2023 | Despatch of minutes of oral proceedings | 05.04.2023 | Despatch of communication that the patent will be revoked | 25.08.2025 | Cancellation of oral proceeding that was planned for 11.06.2026 | 11.06.2026 | Date of oral proceedings | 10.09.2026 | Date of oral proceedings | Appeal following opposition | 18.05.2023 | Appeal received No. T0929/23 | 18.05.2023 | Payment of appeal fee | 31.07.2023 | Statement of grounds filed | 18.03.2025 | Result of appeal procedure: continuation of opposition procedure | 27.03.2025 | Despatch of the decision of the Board of Appeal |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.08.2019 | AL | 24.03.2021 | AT | 24.03.2021 | CY | 24.03.2021 | DK | 24.03.2021 | EE | 24.03.2021 | FI | 24.03.2021 | HR | 24.03.2021 | LT | 24.03.2021 | LV | 24.03.2021 | MC | 24.03.2021 | MK | 24.03.2021 | MT | 24.03.2021 | NL | 24.03.2021 | RO | 24.03.2021 | RS | 24.03.2021 | SE | 24.03.2021 | SI | 24.03.2021 | SK | 24.03.2021 | SM | 24.03.2021 | TR | 24.03.2021 | BG | 24.06.2021 | NO | 24.06.2021 | GR | 25.06.2021 | IS | 24.07.2021 | IE | 13.08.2021 | LU | 13.08.2021 | BE | 31.08.2021 | CH | 31.08.2022 | LI | 31.08.2022 | [2024/42] |
| Former [2024/29] | HU | 13.08.2019 | |
| AL | 24.03.2021 | ||
| AT | 24.03.2021 | ||
| CY | 24.03.2021 | ||
| DK | 24.03.2021 | ||
| EE | 24.03.2021 | ||
| FI | 24.03.2021 | ||
| HR | 24.03.2021 | ||
| LT | 24.03.2021 | ||
| LV | 24.03.2021 | ||
| MC | 24.03.2021 | ||
| MK | 24.03.2021 | ||
| NL | 24.03.2021 | ||
| RO | 24.03.2021 | ||
| RS | 24.03.2021 | ||
| SE | 24.03.2021 | ||
| SI | 24.03.2021 | ||
| SK | 24.03.2021 | ||
| SM | 24.03.2021 | ||
| TR | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| IS | 24.07.2021 | ||
| IE | 13.08.2021 | ||
| LU | 13.08.2021 | ||
| BE | 31.08.2021 | ||
| CH | 31.08.2022 | ||
| LI | 31.08.2022 | ||
| Former [2024/23] | HU | 13.08.2019 | |
| AL | 24.03.2021 | ||
| AT | 24.03.2021 | ||
| CY | 24.03.2021 | ||
| DK | 24.03.2021 | ||
| EE | 24.03.2021 | ||
| FI | 24.03.2021 | ||
| HR | 24.03.2021 | ||
| LT | 24.03.2021 | ||
| LV | 24.03.2021 | ||
| MC | 24.03.2021 | ||
| MK | 24.03.2021 | ||
| NL | 24.03.2021 | ||
| RO | 24.03.2021 | ||
| RS | 24.03.2021 | ||
| SE | 24.03.2021 | ||
| SI | 24.03.2021 | ||
| SK | 24.03.2021 | ||
| SM | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| IS | 24.07.2021 | ||
| IE | 13.08.2021 | ||
| LU | 13.08.2021 | ||
| BE | 31.08.2021 | ||
| CH | 31.08.2022 | ||
| LI | 31.08.2022 | ||
| Former [2023/33] | HU | 13.08.2019 | |
| AL | 24.03.2021 | ||
| AT | 24.03.2021 | ||
| CY | 24.03.2021 | ||
| DK | 24.03.2021 | ||
| EE | 24.03.2021 | ||
| FI | 24.03.2021 | ||
| HR | 24.03.2021 | ||
| LT | 24.03.2021 | ||
| LV | 24.03.2021 | ||
| MC | 24.03.2021 | ||
| NL | 24.03.2021 | ||
| RO | 24.03.2021 | ||
| RS | 24.03.2021 | ||
| SE | 24.03.2021 | ||
| SI | 24.03.2021 | ||
| SK | 24.03.2021 | ||
| SM | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| IS | 24.07.2021 | ||
| IE | 13.08.2021 | ||
| LU | 13.08.2021 | ||
| BE | 31.08.2021 | ||
| CH | 31.08.2022 | ||
| LI | 31.08.2022 | ||
| Former [2023/30] | AL | 24.03.2021 | |
| AT | 24.03.2021 | ||
| CY | 24.03.2021 | ||
| DK | 24.03.2021 | ||
| EE | 24.03.2021 | ||
| FI | 24.03.2021 | ||
| HR | 24.03.2021 | ||
| LT | 24.03.2021 | ||
| LV | 24.03.2021 | ||
| MC | 24.03.2021 | ||
| NL | 24.03.2021 | ||
| RO | 24.03.2021 | ||
| RS | 24.03.2021 | ||
| SE | 24.03.2021 | ||
| SI | 24.03.2021 | ||
| SK | 24.03.2021 | ||
| SM | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| IS | 24.07.2021 | ||
| IE | 13.08.2021 | ||
| LU | 13.08.2021 | ||
| BE | 31.08.2021 | ||
| CH | 31.08.2022 | ||
| LI | 31.08.2022 | ||
| Former [2023/21] | AL | 24.03.2021 | |
| AT | 24.03.2021 | ||
| DK | 24.03.2021 | ||
| EE | 24.03.2021 | ||
| FI | 24.03.2021 | ||
| HR | 24.03.2021 | ||
| LT | 24.03.2021 | ||
| LV | 24.03.2021 | ||
| MC | 24.03.2021 | ||
| NL | 24.03.2021 | ||
| RO | 24.03.2021 | ||
| RS | 24.03.2021 | ||
| SE | 24.03.2021 | ||
| SI | 24.03.2021 | ||
| SK | 24.03.2021 | ||
| SM | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| IS | 24.07.2021 | ||
| IE | 13.08.2021 | ||
| LU | 13.08.2021 | ||
| BE | 31.08.2021 | ||
| CH | 31.08.2022 | ||
| LI | 31.08.2022 | ||
| Former [2022/35] | AL | 24.03.2021 | |
| AT | 24.03.2021 | ||
| DK | 24.03.2021 | ||
| EE | 24.03.2021 | ||
| FI | 24.03.2021 | ||
| HR | 24.03.2021 | ||
| LT | 24.03.2021 | ||
| LV | 24.03.2021 | ||
| MC | 24.03.2021 | ||
| NL | 24.03.2021 | ||
| RO | 24.03.2021 | ||
| RS | 24.03.2021 | ||
| SE | 24.03.2021 | ||
| SI | 24.03.2021 | ||
| SK | 24.03.2021 | ||
| SM | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| IS | 24.07.2021 | ||
| IE | 13.08.2021 | ||
| LU | 13.08.2021 | ||
| BE | 31.08.2021 | ||
| Former [2022/34] | AL | 24.03.2021 | |
| AT | 24.03.2021 | ||
| DK | 24.03.2021 | ||
| EE | 24.03.2021 | ||
| FI | 24.03.2021 | ||
| HR | 24.03.2021 | ||
| LT | 24.03.2021 | ||
| LV | 24.03.2021 | ||
| MC | 24.03.2021 | ||
| NL | 24.03.2021 | ||
| RO | 24.03.2021 | ||
| RS | 24.03.2021 | ||
| SE | 24.03.2021 | ||
| SI | 24.03.2021 | ||
| SK | 24.03.2021 | ||
| SM | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| IS | 24.07.2021 | ||
| LU | 13.08.2021 | ||
| BE | 31.08.2021 | ||
| Former [2022/23] | AL | 24.03.2021 | |
| AT | 24.03.2021 | ||
| DK | 24.03.2021 | ||
| EE | 24.03.2021 | ||
| FI | 24.03.2021 | ||
| HR | 24.03.2021 | ||
| LT | 24.03.2021 | ||
| LV | 24.03.2021 | ||
| MC | 24.03.2021 | ||
| NL | 24.03.2021 | ||
| RO | 24.03.2021 | ||
| RS | 24.03.2021 | ||
| SE | 24.03.2021 | ||
| SI | 24.03.2021 | ||
| SK | 24.03.2021 | ||
| SM | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| IS | 24.07.2021 | ||
| LU | 13.08.2021 | ||
| Former [2022/18] | AL | 24.03.2021 | |
| AT | 24.03.2021 | ||
| DK | 24.03.2021 | ||
| EE | 24.03.2021 | ||
| FI | 24.03.2021 | ||
| HR | 24.03.2021 | ||
| LT | 24.03.2021 | ||
| LV | 24.03.2021 | ||
| MC | 24.03.2021 | ||
| NL | 24.03.2021 | ||
| RO | 24.03.2021 | ||
| RS | 24.03.2021 | ||
| SE | 24.03.2021 | ||
| SI | 24.03.2021 | ||
| SK | 24.03.2021 | ||
| SM | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| IS | 24.12.2021 | ||
| Former [2022/13] | AL | 24.03.2021 | |
| AT | 24.03.2021 | ||
| DK | 24.03.2021 | ||
| EE | 24.03.2021 | ||
| FI | 24.03.2021 | ||
| HR | 24.03.2021 | ||
| LT | 24.03.2021 | ||
| LV | 24.03.2021 | ||
| NL | 24.03.2021 | ||
| RO | 24.03.2021 | ||
| RS | 24.03.2021 | ||
| SE | 24.03.2021 | ||
| SI | 24.03.2021 | ||
| SK | 24.03.2021 | ||
| SM | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| IS | 24.12.2021 | ||
| Former [2022/10] | AL | 24.03.2021 | |
| AT | 24.03.2021 | ||
| DK | 24.03.2021 | ||
| EE | 24.03.2021 | ||
| FI | 24.03.2021 | ||
| HR | 24.03.2021 | ||
| LT | 24.03.2021 | ||
| LV | 24.03.2021 | ||
| NL | 24.03.2021 | ||
| RO | 24.03.2021 | ||
| RS | 24.03.2021 | ||
| SE | 24.03.2021 | ||
| SK | 24.03.2021 | ||
| SM | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| IS | 24.12.2021 | ||
| Former [2022/08] | AL | 24.03.2021 | |
| AT | 24.03.2021 | ||
| DK | 24.03.2021 | ||
| EE | 24.03.2021 | ||
| FI | 24.03.2021 | ||
| HR | 24.03.2021 | ||
| LT | 24.03.2021 | ||
| LV | 24.03.2021 | ||
| NL | 24.03.2021 | ||
| RO | 24.03.2021 | ||
| RS | 24.03.2021 | ||
| SE | 24.03.2021 | ||
| SK | 24.03.2021 | ||
| SM | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| IS | 24.07.2021 | ||
| Former [2022/07] | AL | 24.03.2021 | |
| AT | 24.03.2021 | ||
| EE | 24.03.2021 | ||
| FI | 24.03.2021 | ||
| HR | 24.03.2021 | ||
| LT | 24.03.2021 | ||
| LV | 24.03.2021 | ||
| NL | 24.03.2021 | ||
| RO | 24.03.2021 | ||
| RS | 24.03.2021 | ||
| SE | 24.03.2021 | ||
| SK | 24.03.2021 | ||
| SM | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| IS | 24.07.2021 | ||
| Former [2021/51] | AT | 24.03.2021 | |
| EE | 24.03.2021 | ||
| FI | 24.03.2021 | ||
| HR | 24.03.2021 | ||
| LT | 24.03.2021 | ||
| LV | 24.03.2021 | ||
| NL | 24.03.2021 | ||
| RO | 24.03.2021 | ||
| RS | 24.03.2021 | ||
| SE | 24.03.2021 | ||
| SK | 24.03.2021 | ||
| SM | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| IS | 24.07.2021 | ||
| Former [2021/50] | AT | 24.03.2021 | |
| EE | 24.03.2021 | ||
| FI | 24.03.2021 | ||
| HR | 24.03.2021 | ||
| LT | 24.03.2021 | ||
| LV | 24.03.2021 | ||
| NL | 24.03.2021 | ||
| RO | 24.03.2021 | ||
| RS | 24.03.2021 | ||
| SE | 24.03.2021 | ||
| SK | 24.03.2021 | ||
| SM | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| Former [2021/48] | AT | 24.03.2021 | |
| EE | 24.03.2021 | ||
| FI | 24.03.2021 | ||
| HR | 24.03.2021 | ||
| LT | 24.03.2021 | ||
| LV | 24.03.2021 | ||
| NL | 24.03.2021 | ||
| RS | 24.03.2021 | ||
| SE | 24.03.2021 | ||
| SM | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| Former [2021/46] | AT | 24.03.2021 | |
| FI | 24.03.2021 | ||
| HR | 24.03.2021 | ||
| LT | 24.03.2021 | ||
| LV | 24.03.2021 | ||
| NL | 24.03.2021 | ||
| RS | 24.03.2021 | ||
| SE | 24.03.2021 | ||
| SM | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| Former [2021/43] | FI | 24.03.2021 | |
| HR | 24.03.2021 | ||
| LV | 24.03.2021 | ||
| NL | 24.03.2021 | ||
| RS | 24.03.2021 | ||
| SE | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| Former [2021/38] | FI | 24.03.2021 | |
| HR | 24.03.2021 | ||
| LV | 24.03.2021 | ||
| RS | 24.03.2021 | ||
| SE | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| Former [2021/37] | FI | 24.03.2021 | |
| HR | 24.03.2021 | ||
| LV | 24.03.2021 | ||
| RS | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| Former [2021/36] | FI | 24.03.2021 | |
| HR | 24.03.2021 | ||
| BG | 24.06.2021 | ||
| NO | 24.06.2021 | ||
| GR | 25.06.2021 | ||
| Former [2021/35] | FI | 24.03.2021 | |
| HR | 24.03.2021 | ||
| NO | 24.06.2021 | ||
| Former [2021/33] | FI | 24.03.2021 | |
| NO | 24.06.2021 | Documents cited: | Search | [A] EP1418158 (NIHON YAMAMURA GLASS CO LTD et al.) | by applicant | US6199405 | US7350379 | US5232483 | US4708729 | US2005268654 | US2006213226 |