EP3616807 - WIDE END OF A CONTINUOUS CASTING MOULD WITH VARIABLE MEASURING POSITION DENSITY FOR IMPROVED LONGITUDINAL TEAR DETECTION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.12.2021 Database last updated on 09.07.2024 | |
Former | The patent has been granted Status updated on 15.01.2021 | ||
Former | Grant of patent is intended Status updated on 03.09.2020 | ||
Former | Examination is in progress Status updated on 15.02.2020 | ||
Former | Request for examination was made Status updated on 31.01.2020 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states SMS Group GmbH Eduard-Schloemann-Str. 4 40237 Düsseldorf / DE | [2020/10] | Inventor(s) | 01 /
Hoffmeister, Jörn Eichenstraße 113 47443 Moers / DE | 02 /
Arzberger, Matthias Scheifhackenweg 5 45470 Mülheim a. d. Ruhr / DE | [2020/10] | Representative(s) | Klüppel, Walter Hemmerich & Kollegen Patentanwälte Hammerstraße 2 57072 Siegen / DE | [2020/10] | Application number, filing date | 19192066.9 | 16.08.2019 | [2020/10] | Priority number, date | DE201810214390 | 27.08.2018 Original published format: DE102018214390 | [2020/10] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3616807 | Date: | 04.03.2020 | Language: | DE | [2020/10] | Type: | B1 Patent specification | No.: | EP3616807 | Date: | 17.02.2021 | Language: | DE | [2021/07] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.12.2019 | Classification | IPC: | B22D11/16, B22D11/18, B22D11/20 | [2020/10] | CPC: |
B22D11/182 (EP);
B22D11/16 (EP);
B22D11/202 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/42] |
Former [2020/10] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | KOKILLENBREITSEITE EINER STRANGGIESSKOKILLE MIT VARIABLER MESSSTELLENDICHTE ZUR VERBESSERTEN LÄNGSRISSERKENNUNG | [2020/10] | English: | WIDE END OF A CONTINUOUS CASTING MOULD WITH VARIABLE MEASURING POSITION DENSITY FOR IMPROVED LONGITUDINAL TEAR DETECTION | [2020/10] | French: | PETIT CÔTÉ DE LA COQUILLE D'UNE LINGOTIÈRE DE COULÉE CONTINUE À DENSITÉS DE POINTS DE MESURE VARIABLES DESTINÉ À LA DÉTECTION AMÉLIORÉE DE FISSURES LONGITUDINALES | [2020/10] | Examination procedure | 16.08.2019 | Examination requested [2020/10] | 18.12.2019 | Date on which the examining division has become responsible | 19.02.2020 | Despatch of a communication from the examining division (Time limit: M04) | 12.05.2020 | Reply to a communication from the examining division | 04.09.2020 | Communication of intention to grant the patent | 23.12.2020 | Fee for grant paid | 23.12.2020 | Fee for publishing/printing paid | 23.12.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 18.11.2021 | No opposition filed within time limit [2022/04] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.08.2019 | AL | 17.02.2021 | CY | 17.02.2021 | CZ | 17.02.2021 | DK | 17.02.2021 | EE | 17.02.2021 | ES | 17.02.2021 | FI | 17.02.2021 | HR | 17.02.2021 | LT | 17.02.2021 | LV | 17.02.2021 | MC | 17.02.2021 | MK | 17.02.2021 | NL | 17.02.2021 | PL | 17.02.2021 | RO | 17.02.2021 | RS | 17.02.2021 | SE | 17.02.2021 | SI | 17.02.2021 | SK | 17.02.2021 | SM | 17.02.2021 | TR | 17.02.2021 | BG | 17.05.2021 | NO | 17.05.2021 | GR | 18.05.2021 | IS | 17.06.2021 | PT | 17.06.2021 | IE | 16.08.2021 | LU | 16.08.2021 | BE | 31.08.2021 | FR | 31.08.2021 | [2024/29] |
Former [2024/23] | HU | 16.08.2019 | |
AL | 17.02.2021 | ||
CY | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
MK | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
IE | 16.08.2021 | ||
LU | 16.08.2021 | ||
BE | 31.08.2021 | ||
FR | 31.08.2021 | ||
Former [2023/33] | HU | 16.08.2019 | |
AL | 17.02.2021 | ||
CY | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
IE | 16.08.2021 | ||
LU | 16.08.2021 | ||
BE | 31.08.2021 | ||
FR | 31.08.2021 | ||
Former [2023/30] | AL | 17.02.2021 | |
CY | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
IE | 16.08.2021 | ||
LU | 16.08.2021 | ||
BE | 31.08.2021 | ||
FR | 31.08.2021 | ||
Former [2022/35] | AL | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
IE | 16.08.2021 | ||
LU | 16.08.2021 | ||
BE | 31.08.2021 | ||
FR | 31.08.2021 | ||
Former [2022/34] | AL | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
LU | 16.08.2021 | ||
BE | 31.08.2021 | ||
FR | 31.08.2021 | ||
Former [2022/23] | AL | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
LU | 16.08.2021 | ||
Former [2022/18] | AL | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2022/13] | AL | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2022/10] | AL | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2022/08] | AL | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/07] | AL | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/50] | CZ | 17.02.2021 | |
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/49] | CZ | 17.02.2021 | |
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/48] | CZ | 17.02.2021 | |
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/46] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/42] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/39] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/38] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/37] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
RS | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/36] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/35] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
NO | 17.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/33] | FI | 17.02.2021 | |
LT | 17.02.2021 | ||
NO | 17.05.2021 | ||
PT | 17.06.2021 | Documents cited: | Search | [A]WO2004082869 (SMS DEMAG AG [DE], et al) [A] 1-10 * figures 1-4 * * page 1, line 1 - line 18 * * page 2, line 10 - line 14 ** page 5, line 32 - page 7, line 35 *; | [I]KR20160037527 (POSCO [KR]) [I] 1-10 * figures 1-7 * * paragraph [0001] - paragraph [00011] * * paragraph [0030] - paragraph [0037] * * paragraph [0044] - paragraph [0054] *; | [I]EP3222370 (POSCO [KR]) [I] 1-10 * paragraph [0001] * * paragraph [0241] - paragraph [0261] * * figures 38-45 * | by applicant | JP2008073748 | WO2009149680 | CN101985166 | US9709515 |