blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3782733

EP3782733 - SHEARING STRIP FOR BULK MATERIAL CRUSHING APPARATUS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  26.08.2022
Database last updated on 28.09.2024
FormerThe patent has been granted
Status updated on  17.09.2021
FormerGrant of patent is intended
Status updated on  13.05.2021
FormerRequest for examination was made
Status updated on  22.01.2021
Most recent event   Tooltip27.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 30.10.2024 [2024/44]
Applicant(s)For all designated states
Bühler AG
Gupfenstrasse 5
9240 Uzwil / CH
[N/P]
Former [2021/08]For all designated states
Bühler AG
Gupfenstrasse 5
9240 Uzwil / CH
Inventor(s)01 / Künzle, Simon
Hölzlibüelstrasse 5
9602 Bazenheid / CH
 [2021/08]
Representative(s)Hepp Wenger Ryffel AG
Friedtalweg 5
9500 Wil / CH
[2021/08]
Application number, filing date19192568.420.08.2019
[2021/08]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3782733
Date:24.02.2021
Language:DE
[2021/08]
Type: B1 Patent specification 
No.:EP3782733
Date:20.10.2021
Language:DE
[2021/42]
Search report(s)(Supplementary) European search report - dispatched on:EP20.02.2020
ClassificationIPC:B02C9/02
[2021/08]
CPC:
B02C9/02 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/28]
Former [2021/08]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SCHERLEISTE FÜR VORRICHTUNG ZUM ZERKLEINERN VON SCHÜTTGUTKÖRNERN[2021/08]
English:SHEARING STRIP FOR BULK MATERIAL CRUSHING APPARATUS[2021/08]
French:BANDE DE CISAILLEMENT POUR DISPOSITIF DE BROYAGE DES GRAINS EN VRAC[2021/08]
Examination procedure31.08.2020Examination requested  [2021/08]
31.08.2020Date on which the examining division has become responsible
14.05.2021Communication of intention to grant the patent
08.09.2021Fee for grant paid
08.09.2021Fee for publishing/printing paid
08.09.2021Receipt of the translation of the claim(s)
Opposition(s)21.07.2022No opposition filed within time limit [2022/39]
Fees paidRenewal fee
23.08.2021Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU20.08.2019
AL20.10.2021
CY20.10.2021
CZ20.10.2021
DK20.10.2021
EE20.10.2021
ES20.10.2021
FI20.10.2021
HR20.10.2021
IT20.10.2021
LT20.10.2021
LV20.10.2021
MC20.10.2021
MK20.10.2021
MT20.10.2021
NL20.10.2021
PL20.10.2021
RO20.10.2021
RS20.10.2021
SE20.10.2021
SK20.10.2021
SM20.10.2021
BG20.01.2022
NO20.01.2022
GR21.01.2022
IS20.02.2022
PT21.02.2022
[2024/44]
Former [2024/27]HU20.08.2019
AL20.10.2021
CY20.10.2021
CZ20.10.2021
DK20.10.2021
EE20.10.2021
ES20.10.2021
FI20.10.2021
HR20.10.2021
IT20.10.2021
LT20.10.2021
LV20.10.2021
MC20.10.2021
MK20.10.2021
NL20.10.2021
PL20.10.2021
RO20.10.2021
RS20.10.2021
SE20.10.2021
SK20.10.2021
SM20.10.2021
BG20.01.2022
NO20.01.2022
GR21.01.2022
IS20.02.2022
PT21.02.2022
Former [2024/25]HU20.08.2019
AL20.10.2021
CY20.10.2021
CZ20.10.2021
DK20.10.2021
EE20.10.2021
ES20.10.2021
FI20.10.2021
HR20.10.2021
IT20.10.2021
LT20.10.2021
LV20.10.2021
MC20.10.2021
NL20.10.2021
PL20.10.2021
RO20.10.2021
RS20.10.2021
SE20.10.2021
SK20.10.2021
SM20.10.2021
BG20.01.2022
NO20.01.2022
GR21.01.2022
IS20.02.2022
PT21.02.2022
Former [2024/21]AL20.10.2021
CY20.10.2021
CZ20.10.2021
DK20.10.2021
EE20.10.2021
ES20.10.2021
FI20.10.2021
HR20.10.2021
IT20.10.2021
LT20.10.2021
LV20.10.2021
MC20.10.2021
NL20.10.2021
PL20.10.2021
RO20.10.2021
RS20.10.2021
SE20.10.2021
SK20.10.2021
SM20.10.2021
BG20.01.2022
NO20.01.2022
GR21.01.2022
IS20.02.2022
PT21.02.2022
Former [2023/27]AL20.10.2021
CZ20.10.2021
DK20.10.2021
EE20.10.2021
ES20.10.2021
FI20.10.2021
HR20.10.2021
IT20.10.2021
LT20.10.2021
LV20.10.2021
MC20.10.2021
NL20.10.2021
PL20.10.2021
RO20.10.2021
RS20.10.2021
SE20.10.2021
SK20.10.2021
SM20.10.2021
BG20.01.2022
NO20.01.2022
GR21.01.2022
IS20.02.2022
PT21.02.2022
Former [2023/16]AL20.10.2021
CZ20.10.2021
DK20.10.2021
EE20.10.2021
ES20.10.2021
FI20.10.2021
HR20.10.2021
LT20.10.2021
LV20.10.2021
MC20.10.2021
NL20.10.2021
PL20.10.2021
RO20.10.2021
RS20.10.2021
SE20.10.2021
SK20.10.2021
SM20.10.2021
BG20.01.2022
NO20.01.2022
GR21.01.2022
IS20.02.2022
PT21.02.2022
Former [2022/49]AL20.10.2021
CZ20.10.2021
DK20.10.2021
EE20.10.2021
ES20.10.2021
FI20.10.2021
HR20.10.2021
LT20.10.2021
LV20.10.2021
NL20.10.2021
PL20.10.2021
RO20.10.2021
RS20.10.2021
SE20.10.2021
SK20.10.2021
SM20.10.2021
BG20.01.2022
NO20.01.2022
GR21.01.2022
IS20.02.2022
PT21.02.2022
Former [2022/35]CZ20.10.2021
DK20.10.2021
EE20.10.2021
ES20.10.2021
FI20.10.2021
HR20.10.2021
LT20.10.2021
LV20.10.2021
NL20.10.2021
PL20.10.2021
RO20.10.2021
RS20.10.2021
SE20.10.2021
SK20.10.2021
SM20.10.2021
BG20.01.2022
NO20.01.2022
GR21.01.2022
IS20.02.2022
PT21.02.2022
Former [2022/34]EE20.10.2021
ES20.10.2021
FI20.10.2021
HR20.10.2021
LT20.10.2021
LV20.10.2021
NL20.10.2021
PL20.10.2021
RO20.10.2021
RS20.10.2021
SE20.10.2021
SM20.10.2021
BG20.01.2022
NO20.01.2022
GR21.01.2022
IS20.02.2022
PT21.02.2022
Former [2022/33]ES20.10.2021
FI20.10.2021
HR20.10.2021
LT20.10.2021
LV20.10.2021
NL20.10.2021
PL20.10.2021
RS20.10.2021
SE20.10.2021
SM20.10.2021
BG20.01.2022
NO20.01.2022
GR21.01.2022
IS20.02.2022
PT21.02.2022
Former [2022/25]ES20.10.2021
FI20.10.2021
HR20.10.2021
LT20.10.2021
LV20.10.2021
NL20.10.2021
PL20.10.2021
RS20.10.2021
SE20.10.2021
BG20.01.2022
NO20.01.2022
GR21.01.2022
IS20.02.2022
PT21.02.2022
Former [2022/24]ES20.10.2021
FI20.10.2021
HR20.10.2021
LT20.10.2021
LV20.10.2021
NL20.10.2021
PL20.10.2021
RS20.10.2021
SE20.10.2021
BG20.01.2022
GR21.01.2022
IS20.02.2022
PT21.02.2022
Former [2022/23]ES20.10.2021
FI20.10.2021
HR20.10.2021
LT20.10.2021
LV20.10.2021
PL20.10.2021
RS20.10.2021
BG20.01.2022
PT21.02.2022
Former [2022/22]FI20.10.2021
LT20.10.2021
RS20.10.2021
BG20.01.2022
Former [2022/21]RS20.10.2021
BG20.01.2022
Former [2022/19]BG20.01.2022
Documents cited:Search[AD]WO2019086375  (BUEHLER AG [CH]) [AD] 1-15 * page 18 - page 25; figures 1-10; claims 1,6-15 *
by applicantUS1744169
 EP1151797
 WO2019086375
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.