EP3593856 - SYSTEM FOR PAIRING VAGUS NERVE STIMULATION WITH MOTOR THERAPY IN STROKE PATIENTS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.10.2022 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 12.11.2021 | ||
Former | Grant of patent is intended Status updated on 21.06.2021 | ||
Former | Request for examination was made Status updated on 09.06.2021 | ||
Former | Grant of patent is intended Status updated on 26.01.2021 | ||
Former | Request for examination was made Status updated on 17.07.2020 | ||
Former | The application has been published Status updated on 13.12.2019 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Microtransponder, Inc. 2802 Flintrock Terrace Austin, TX 78738 / US | For all designated states The Board of Regents, The University of Texas System 201 West 7th Street Austin, TX 78701 / US | [2020/03] | Inventor(s) | 01 /
KILGARD, Michael P. 205 Crooked Creek Richardson, TX 75080 / US | 02 /
ENGINEER, Navzer 5929 Mulvane Drive Plano, TX 75094 / US | 03 /
PIERCE, David Michael 6403 Chinaberry Trail Plano, TX 75023 / US | 04 /
RENNAKER, Robert L. 3610 Ridge Glenn Drive Sachse, TX 75048 / US | [2020/03] | Representative(s) | Schohe, Stefan Boehmert & Boehmert Anwaltspartnerschaft mbB Pettenkoferstrasse 22 80336 München / DE | [2020/03] | Application number, filing date | 19192580.9 | 12.10.2012 | [2020/03] | Priority number, date | US201161627532P | 13.10.2011 Original published format: US 201161627532 P | US201161558287P | 10.11.2011 Original published format: US 201161558287 P | US201261598185P | 13.02.2012 Original published format: US 201261598185 P | US201261614369P | 22.03.2012 Original published format: US 201261614369 P | US201261699470P | 11.09.2012 Original published format: US 201261699470 P | [2020/03] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3593856 | Date: | 15.01.2020 | Language: | EN | [2020/03] | Type: | B1 Patent specification | No.: | EP3593856 | Date: | 15.12.2021 | Language: | EN | [2021/50] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.12.2019 | Classification | IPC: | A61N1/372 | [2020/03] | CPC: |
A61N1/36067 (EP,US);
A61N1/36003 (US);
A61N1/36053 (EP,US);
A61N1/36092 (EP,US);
A61N1/361 (EP,US);
A61N1/36103 (EP,US);
A61N1/36139 (US);
A61N1/36178 (US);
A61N1/37217 (US);
A61N1/37235 (EP,US);
A61N1/37247 (EP,US);
A61N2/006 (US);
A61N7/00 (US);
G09B23/28 (EP,US);
A61B5/1124 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/34] |
Former [2020/03] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SYSTEM ZUR PAARUNG VON VAGUSNERVSTIMULATION MIT MOTORTHERAPIE BEI SCHLAGANFALLPATIENTEN | [2020/03] | English: | SYSTEM FOR PAIRING VAGUS NERVE STIMULATION WITH MOTOR THERAPY IN STROKE PATIENTS | [2020/03] | French: | SYSTÈME POUR L'APPARIEMENT D'UNE STIMULATION DU NERF VAGUE AVEC UNE THÉRAPIE MOTRICE CHEZ DES PATIENTS AYANT EU UN ACCIDENT VASCULAIRE CÉRÉBRAL | [2020/03] | Examination procedure | 15.07.2020 | Examination requested [2020/34] | 15.07.2020 | Date on which the examining division has become responsible | 27.01.2021 | Communication of intention to grant the patent | 07.06.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 22.06.2021 | Communication of intention to grant the patent | 02.11.2021 | Fee for grant paid | 02.11.2021 | Fee for publishing/printing paid | 02.11.2021 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP12778023.7 / EP2766089 | Divisional application(s) | EP21214444.8 / EP4032583 | Opposition(s) | 16.09.2022 | No opposition filed within time limit [2022/47] | Fees paid | Renewal fee | 20.08.2019 | Renewal fee patent year 03 | 20.08.2019 | Renewal fee patent year 04 | 20.08.2019 | Renewal fee patent year 05 | 20.08.2019 | Renewal fee patent year 06 | 20.08.2019 | Renewal fee patent year 07 | 20.08.2019 | Renewal fee patent year 08 | 14.10.2020 | Renewal fee patent year 09 | 27.10.2021 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.10.2012 | AL | 15.12.2021 | AT | 15.12.2021 | CY | 15.12.2021 | CZ | 15.12.2021 | DK | 15.12.2021 | EE | 15.12.2021 | ES | 15.12.2021 | FI | 15.12.2021 | HR | 15.12.2021 | IT | 15.12.2021 | LT | 15.12.2021 | LV | 15.12.2021 | MC | 15.12.2021 | MK | 15.12.2021 | NL | 15.12.2021 | PL | 15.12.2021 | RO | 15.12.2021 | RS | 15.12.2021 | SE | 15.12.2021 | SI | 15.12.2021 | SK | 15.12.2021 | SM | 15.12.2021 | TR | 15.12.2021 | BG | 15.03.2022 | NO | 15.03.2022 | GR | 16.03.2022 | IS | 15.04.2022 | PT | 18.04.2022 | [2024/29] |
Former [2024/27] | HU | 12.10.2012 | |
AL | 15.12.2021 | ||
AT | 15.12.2021 | ||
CY | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
IT | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
MK | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2024/21] | HU | 12.10.2012 | |
AL | 15.12.2021 | ||
AT | 15.12.2021 | ||
CY | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
IT | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2024/18] | HU | 12.10.2012 | |
AL | 15.12.2021 | ||
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
IT | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2023/25] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
IT | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2023/01] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2022/49] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2022/46] | AT | 15.12.2021 | |
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2022/42] | AT | 15.12.2021 | |
CZ | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2022/36] | AT | 15.12.2021 | |
CZ | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
PT | 18.04.2022 | ||
Former [2022/35] | CZ | 15.12.2021 | |
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
PT | 18.04.2022 | ||
Former [2022/34] | EE | 15.12.2021 | |
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
PT | 18.04.2022 | ||
Former [2022/33] | FI | 15.12.2021 | |
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
Former [2022/30] | FI | 15.12.2021 | |
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
Former [2022/25] | FI | 15.12.2021 | |
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
Former [2022/24] | FI | 15.12.2021 | |
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
BG | 15.03.2022 | ||
GR | 16.03.2022 | ||
Former [2022/22] | FI | 15.12.2021 | |
LT | 15.12.2021 | ||
RS | 15.12.2021 | ||
BG | 15.03.2022 | ||
Former [2022/21] | RS | 15.12.2021 | |
BG | 15.03.2022 | ||
Former [2022/19] | BG | 15.03.2022 | Documents cited: | Search | [A]US6978787 (BRONIATOWSKI MICHAEL [US]) [A] 1-5* the whole document *; | [A]US2007027492 (MASCHINO STEVEN E [US], et al) [A] 1-5 * the whole document *; | [A]US2007067004 (BOVEJA BIRINDER R [US], et al) [A] 1-5 * paragraphs [0006] , [0437] - [0443]; figures 72A-74B,53A *; | [A]US2007208388 (JAHNS SCOTT E [US], et al) [A] 1-5 * figure 3 * | by applicant | US6104956 | US6155971 | US6990377 | US7024398 | US2007079534 | US7797042 |