blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3626483

EP3626483 - TYRE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  30.07.2021
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  21.08.2020
FormerGrant of patent is intended
Status updated on  06.07.2020
FormerRequest for examination was made
Status updated on  29.05.2020
FormerThe application has been published
Status updated on  21.02.2020
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
Sumitomo Rubber Industries, Ltd.
6-9, Wakinohama-cho 3-chome
Chuo-ku
Kobe-shi
Hyogo-ken 651-0072 / JP
[2020/13]
Inventor(s)01 / MIURA, Akiko
c/o Sumitomo Rubber Industries, Ltd.
6-9, Wakinohama-cho 3-chome
Chuo-ku
Kobe-shi, Hyogo 651-0072 / JP
 [2020/13]
Representative(s)Manitz Finsterwald Patent- und Rechtsanwaltspartnerschaft mbB
Martin-Greif-Strasse 1
80336 München / DE
[2020/13]
Application number, filing date19195412.204.09.2019
[2020/13]
Priority number, dateJP2018017639620.09.2018         Original published format: JP 2018176396
[2020/13]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3626483
Date:25.03.2020
Language:EN
[2020/13]
Type: B1 Patent specification 
No.:EP3626483
Date:23.09.2020
Language:EN
[2020/39]
Search report(s)(Supplementary) European search report - dispatched on:EP03.02.2020
ClassificationIPC:B60C11/03, B60C11/12
[2020/13]
CPC:
B60C11/0304 (EP,US); B60C11/12 (EP,CN); B60C11/0302 (US);
B60C11/0306 (EP); B60C11/0309 (US); B60C11/0327 (US);
B60C11/1236 (US); B60C2011/0341 (EP,CN); B60C2011/0346 (EP,US);
B60C2011/0353 (US); B60C2011/0362 (US); B60C2011/0372 (EP);
B60C2011/0383 (EP); B60C2200/14 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/27]
Former [2020/13]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:REIFEN[2020/13]
English:TYRE[2020/13]
French:PNEUMATIQUE[2020/13]
Examination procedure25.05.2020Amendment by applicant (claims and/or description)
25.05.2020Examination requested  [2020/27]
25.05.2020Date on which the examining division has become responsible
07.07.2020Communication of intention to grant the patent
07.08.2020Fee for grant paid
07.08.2020Fee for publishing/printing paid
07.08.2020Receipt of the translation of the claim(s)
Opposition(s)24.06.2021No opposition filed within time limit [2021/35]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.09.2019
AL23.09.2020
AT23.09.2020
CY23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
MK23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
TR23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
[2024/29]
Former [2024/23]HU04.09.2019
AL23.09.2020
AT23.09.2020
CY23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
MK23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2023/41]HU04.09.2019
AL23.09.2020
AT23.09.2020
CY23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2023/33]HU04.09.2019
AL23.09.2020
AT23.09.2020
CY23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2023/30]AL23.09.2020
AT23.09.2020
CY23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2023/29]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2022/25]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/48]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/37]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/28]AL23.09.2020
AT23.09.2020
CZ23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/25]AL23.09.2020
AT23.09.2020
CZ23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/22]CZ23.09.2020
EE23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
PT25.01.2021
Former [2021/21]FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
RS23.09.2020
SE23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
PT25.01.2021
Former [2021/20]FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
RS23.09.2020
SE23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
Former [2021/10]FI23.09.2020
HR23.09.2020
LV23.09.2020
RS23.09.2020
SE23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
Former [2021/08]FI23.09.2020
SE23.09.2020
BG23.12.2020
NO23.12.2020
Former [2021/07]FI23.09.2020
NO23.12.2020
Documents cited:Search[X]DE102005058365  (CONTINENTAL AG [DE]) [X] 1-9 * figure 1 *;
 [X]JP2011051431  (BRIDGESTONE CORP) [X] 1-9* figure 1 *;
 [X]EP2505387  (SUMITOMO RUBBER IND [JP]) [X] 1-9 * figure 1 *;
 [XA]EP2881264  (CONTINENTAL REIFEN DEUTSCHLAND [DE]) [X] 1-10 * figure 3 * [A] 11-14;
 [X]DE102016117823  (TOYO TIRE & RUBBER CO [JP]) [X] 1-10 * figure 1 *
by applicantJP2010013099
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.