blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3636522

EP3636522 - TUBE FOR A BICYCLE [Right-click to bookmark this link]
StatusOpposition rejected
Status updated on  09.02.2024
Database last updated on 24.08.2024
FormerThe patent has been granted
Status updated on  11.06.2021
FormerGrant of patent is intended
Status updated on  02.02.2021
FormerRequest for examination was made
Status updated on  23.10.2020
FormerThe application has been published
Status updated on  13.03.2020
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Puretek Manufacturing Co., Ltd.
No. 8, Gong 10th Rd.
Dajia Dist.
Taichung City / TW
[2020/16]
Inventor(s)01 / LO, Kuang-Yen
No. 8, Gong 10th Rd., Dajia Dist.
Taichung City / TW
02 / MUELLER, Jonas
Im Sprung 7
4132 Muttenz / CH
 [2020/16]
Representative(s)Viering, Jentschura & Partner mbB Patent- und Rechtsanwälte
Hamborner Straße 53
40472 Düsseldorf / DE
[2021/28]
Former [2020/16]Viering, Jentschura & Partner mbB Patent- und Rechtsanwälte
Kennedydamm 55 / Roßstrasse
40476 Düsseldorf / DE
Application number, filing date19197184.513.09.2019
[2020/16]
Priority number, dateTW2018013536308.10.2018         Original published format: TW 107135363
[2020/16]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3636522
Date:15.04.2020
Language:EN
[2020/16]
Type: B1 Patent specification 
No.:EP3636522
Date:14.07.2021
Language:EN
[2021/28]
Search report(s)(Supplementary) European search report - dispatched on:EP12.03.2020
ClassificationIPC:B62J1/14, B62J1/16, B62J6/03, B62K19/30
[2020/16]
CPC:
B62K11/14 (EP,US); B62K19/06 (EP,US); B62K19/30 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/48]
Former [2020/16]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ROHR FÜR EIN FAHRRAD[2020/16]
English:TUBE FOR A BICYCLE[2020/16]
French:TUBE POUR BICYCLETTE[2020/16]
Examination procedure15.10.2020Amendment by applicant (claims and/or description)
15.10.2020Examination requested  [2020/48]
15.10.2020Date on which the examining division has become responsible
03.02.2021Communication of intention to grant the patent
03.06.2021Fee for grant paid
03.06.2021Fee for publishing/printing paid
03.06.2021Receipt of the translation of the claim(s)
Opposition(s)Opponent(s)01  14.04.2022  20.04.2022  ADMISSIBLE
Chen, Austin
12f-3, No. 285, Sec. 2, Taiwan Blvd.
West Dist., Taichung 403 / TW
Opponent's representative
Lang, Christian
LangPatent Anwaltskanzlei IP Law Firm
Ingolstädter Straße 5
80807 München / DE
 [2022/21]
18.05.2022Invitation to proprietor to file observations on the notice of opposition
16.09.2022Reply of patent proprietor to notice(s) of opposition
07.09.2023Legal effect of rejection of opposition [2024/11]
07.09.2023Date of oral proceedings
03.11.2023Despatch of minutes of oral proceedings
03.11.2023Date of despatch of rejection of opposition
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.09.2019
AL14.07.2021
AT14.07.2021
CY14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
LT14.07.2021
LV14.07.2021
MC14.07.2021
MK14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SI14.07.2021
SK14.07.2021
SM14.07.2021
TR14.07.2021
IE13.09.2021
LU13.09.2021
BE30.09.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
[2024/29]
Former [2024/23]HU13.09.2019
AL14.07.2021
AT14.07.2021
CY14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
LT14.07.2021
LV14.07.2021
MC14.07.2021
MK14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SI14.07.2021
SK14.07.2021
SM14.07.2021
IE13.09.2021
LU13.09.2021
BE30.09.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
Former [2023/33]HU13.09.2019
AL14.07.2021
AT14.07.2021
CY14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
LT14.07.2021
LV14.07.2021
MC14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SI14.07.2021
SK14.07.2021
SM14.07.2021
IE13.09.2021
LU13.09.2021
BE30.09.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
Former [2023/30]AL14.07.2021
AT14.07.2021
CY14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
LT14.07.2021
LV14.07.2021
MC14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SI14.07.2021
SK14.07.2021
SM14.07.2021
IE13.09.2021
LU13.09.2021
BE30.09.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
Former [2022/35]AL14.07.2021
AT14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
LT14.07.2021
LV14.07.2021
MC14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SI14.07.2021
SK14.07.2021
SM14.07.2021
IE13.09.2021
LU13.09.2021
BE30.09.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
Former [2022/34]AL14.07.2021
AT14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
LT14.07.2021
LV14.07.2021
MC14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SI14.07.2021
SK14.07.2021
SM14.07.2021
LU13.09.2021
BE30.09.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
Former [2022/29]AL14.07.2021
AT14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
LT14.07.2021
LV14.07.2021
MC14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SI14.07.2021
SK14.07.2021
SM14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
Former [2022/25]AT14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
LT14.07.2021
LV14.07.2021
MC14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SK14.07.2021
SM14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
Former [2022/24]AT14.07.2021
CZ14.07.2021
DK14.07.2021
EE14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
LT14.07.2021
LV14.07.2021
MC14.07.2021
NL14.07.2021
PL14.07.2021
RO14.07.2021
RS14.07.2021
SE14.07.2021
SK14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
Former [2022/21]AT14.07.2021
DK14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
LT14.07.2021
LV14.07.2021
NL14.07.2021
PL14.07.2021
RS14.07.2021
SE14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
Former [2022/11]AT14.07.2021
ES14.07.2021
FI14.07.2021
HR14.07.2021
LT14.07.2021
LV14.07.2021
NL14.07.2021
PL14.07.2021
RS14.07.2021
SE14.07.2021
BG14.10.2021
NO14.10.2021
GR15.10.2021
IS14.11.2021
PT15.11.2021
Former [2022/09]AT14.07.2021
ES14.07.2021
FI14.07.2021
LT14.07.2021
NL14.07.2021
RS14.07.2021
SE14.07.2021
BG14.10.2021
NO14.10.2021
PT15.11.2021
Former [2022/08]AT14.07.2021
ES14.07.2021
FI14.07.2021
LT14.07.2021
NL14.07.2021
SE14.07.2021
BG14.10.2021
NO14.10.2021
Former [2022/07]AT14.07.2021
LT14.07.2021
NL14.07.2021
NO14.10.2021
Documents cited:Search[A]GB2419574  (SPECIALIZED BICYCLE COMPONENTS [US]) [A] 1 * figure 4 *;
 [X]DE102011015897  (SPECIALIZED BICYCLE COMPONENTS [US]) [X] 1-9 * paragraph [0031]; figures 1-10 *;
 [A]EP2468610  (KAWASAKI HEAVY IND LTD [JP]) [A] 1* paragraph [0072]; figure 6 *;
 [A]DE202015008922U  (PENDING SYSTEM GMBH & CO KG [DE]) [A] 1 * figures 1-16 *;
 [A]DE102017201995  (YT IND GMBH [DE]) [A] 1 * figures 1-13 *
OppositionUS3209575
 US4582259
 DE102007027929
 DE102011015897
 CN102530152B
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.