| EP3624447 - METHOD AND APPARATUS FOR SIGNALING AND CONSTRUCTION OF VIDEO CODING REFERENCE PICTURE LISTS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.04.2022 Database last updated on 21.03.2026 | |
| Former | The patent has been granted Status updated on 23.04.2021 | ||
| Former | Grant of patent is intended Status updated on 09.12.2020 | ||
| Former | Request for examination was made Status updated on 14.02.2020 | Most recent event Tooltip | 26.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 28.01.2026 [2026/05] | Applicant(s) | For all designated states Vid Scale, Inc. 200 Bellevue Parkway Suite 300 Wilmington, Delaware 19809 / US | [2020/12] | Inventor(s) | 01 /
YAN, Ye 5001 Perlman Way San Diego, California 92130 / US | 02 /
HE, Yong 16961 Silver Pine Road San Diego, California 92127 / US | [2021/21] |
| Former [2020/12] | 01 /
Yan, Ye 5001 Perlman Way San Diego, CA 92130 / US | ||
| 02 /
He, Yong 16961 Silver Pine Road San Diego, 92127 / US | Representative(s) | AWA Sweden AB Box 5117 200 71 Malmö / SE | [N/P] |
| Former [2020/12] | AWA Sweden AB P.O. Box 5117 200 71 Malmö / SE | Application number, filing date | 19199908.5 | 10.01.2013 | [2020/12] | Priority number, date | US201261588571P | 19.01.2012 Original published format: US 201261588571 P | [2020/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3624447 | Date: | 18.03.2020 | Language: | EN | [2020/12] | Type: | B1 Patent specification | No.: | EP3624447 | Date: | 26.05.2021 | Language: | EN | [2021/21] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 29.11.2019 | Classification | IPC: | H04N19/105, H04N19/503, H04N19/70 | [2020/12] | CPC: |
H04N19/103 (EP,US);
H04N19/70 (EP,KR,US);
H04N19/105 (KR,US);
H04N19/117 (US);
H04N19/124 (US);
H04N19/13 (US);
H04N19/139 (US);
H04N19/15 (US);
H04N19/174 (KR);
H04N19/503 (EP,KR,US);
H04N19/577 (EP,US);
H04N19/61 (US);
H04N19/172 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/12] | Title | German: | VERFAHREN UND VORRICHTUNG ZUR SIGNALISIERUNG UND KONSTRUKTION VON VIDEOKODIERUNGSREFERENZBILDLISTEN | [2021/01] | English: | METHOD AND APPARATUS FOR SIGNALING AND CONSTRUCTION OF VIDEO CODING REFERENCE PICTURE LISTS | [2020/12] | French: | PROCÉDÉ ET APPAREIL POUR SIGNALER ET CONSTRUIRE DES LISTES D'IMAGES DE RÉFÉRENCE POUR CODAGE VIDÉO | [2020/12] |
| Former [2020/12] | VERFAHREN UND VORRICHTUNG ZUR SIGNALISIERUNG UND KONSTRUKTION ZUR VIDEOCODIERUNGSREFERENZBILDLISTEN | Examination procedure | 26.09.2019 | Examination requested [2020/12] | 11.09.2020 | Amendment by applicant (claims and/or description) | 10.12.2020 | Communication of intention to grant the patent | 20.04.2021 | Fee for grant paid | 20.04.2021 | Fee for publishing/printing paid | 20.04.2021 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP13700441.2 / EP2805512 | EP18172546.6 / EP3383042 | Divisional application(s) | EP21172075.0 / EP3917140 | EP23178613.8 / EP4224845 | Opposition(s) | 01.03.2022 | No opposition filed within time limit [2022/18] | Fees paid | Renewal fee | 26.09.2019 | Renewal fee patent year 03 | 26.09.2019 | Renewal fee patent year 04 | 26.09.2019 | Renewal fee patent year 05 | 26.09.2019 | Renewal fee patent year 06 | 26.09.2019 | Renewal fee patent year 07 | 29.01.2020 | Renewal fee patent year 08 | 27.01.2021 | Renewal fee patent year 09 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.01.2013 | AL | 26.05.2021 | AT | 26.05.2021 | CY | 26.05.2021 | CZ | 26.05.2021 | DK | 26.05.2021 | EE | 26.05.2021 | ES | 26.05.2021 | FI | 26.05.2021 | HR | 26.05.2021 | IT | 26.05.2021 | LT | 26.05.2021 | LV | 26.05.2021 | MC | 26.05.2021 | MK | 26.05.2021 | MT | 26.05.2021 | RO | 26.05.2021 | RS | 26.05.2021 | SE | 26.05.2021 | SI | 26.05.2021 | SK | 26.05.2021 | SM | 26.05.2021 | TR | 26.05.2021 | BG | 26.08.2021 | GR | 27.08.2021 | IS | 26.09.2021 | PT | 27.09.2021 | IE | 10.01.2022 | LU | 10.01.2022 | BE | 31.01.2022 | CH | 31.01.2022 | LI | 31.01.2022 | [2026/05] |
| Former [2024/44] | HU | 10.01.2013 | |
| AL | 26.05.2021 | ||
| AT | 26.05.2021 | ||
| CY | 26.05.2021 | ||
| CZ | 26.05.2021 | ||
| DK | 26.05.2021 | ||
| EE | 26.05.2021 | ||
| ES | 26.05.2021 | ||
| FI | 26.05.2021 | ||
| HR | 26.05.2021 | ||
| IT | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| LV | 26.05.2021 | ||
| MC | 26.05.2021 | ||
| MK | 26.05.2021 | ||
| MT | 26.05.2021 | ||
| RO | 26.05.2021 | ||
| RS | 26.05.2021 | ||
| SE | 26.05.2021 | ||
| SI | 26.05.2021 | ||
| SK | 26.05.2021 | ||
| SM | 26.05.2021 | ||
| BG | 26.08.2021 | ||
| GR | 27.08.2021 | ||
| IS | 26.09.2021 | ||
| PT | 27.09.2021 | ||
| IE | 10.01.2022 | ||
| LU | 10.01.2022 | ||
| BE | 31.01.2022 | ||
| CH | 31.01.2022 | ||
| LI | 31.01.2022 | ||
| Former [2024/25] | HU | 10.01.2013 | |
| AL | 26.05.2021 | ||
| AT | 26.05.2021 | ||
| CY | 26.05.2021 | ||
| CZ | 26.05.2021 | ||
| DK | 26.05.2021 | ||
| EE | 26.05.2021 | ||
| ES | 26.05.2021 | ||
| FI | 26.05.2021 | ||
| HR | 26.05.2021 | ||
| IT | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| LV | 26.05.2021 | ||
| MC | 26.05.2021 | ||
| MK | 26.05.2021 | ||
| RO | 26.05.2021 | ||
| RS | 26.05.2021 | ||
| SE | 26.05.2021 | ||
| SI | 26.05.2021 | ||
| SK | 26.05.2021 | ||
| SM | 26.05.2021 | ||
| BG | 26.08.2021 | ||
| GR | 27.08.2021 | ||
| IS | 26.09.2021 | ||
| PT | 27.09.2021 | ||
| IE | 10.01.2022 | ||
| LU | 10.01.2022 | ||
| BE | 31.01.2022 | ||
| CH | 31.01.2022 | ||
| LI | 31.01.2022 | ||
| Former [2024/23] | AL | 26.05.2021 | |
| AT | 26.05.2021 | ||
| CY | 26.05.2021 | ||
| CZ | 26.05.2021 | ||
| DK | 26.05.2021 | ||
| EE | 26.05.2021 | ||
| ES | 26.05.2021 | ||
| FI | 26.05.2021 | ||
| HR | 26.05.2021 | ||
| IT | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| LV | 26.05.2021 | ||
| MC | 26.05.2021 | ||
| MK | 26.05.2021 | ||
| RO | 26.05.2021 | ||
| RS | 26.05.2021 | ||
| SE | 26.05.2021 | ||
| SI | 26.05.2021 | ||
| SK | 26.05.2021 | ||
| SM | 26.05.2021 | ||
| BG | 26.08.2021 | ||
| GR | 27.08.2021 | ||
| IS | 26.09.2021 | ||
| PT | 27.09.2021 | ||
| IE | 10.01.2022 | ||
| LU | 10.01.2022 | ||
| BE | 31.01.2022 | ||
| CH | 31.01.2022 | ||
| LI | 31.01.2022 | ||
| Former [2024/20] | AL | 26.05.2021 | |
| AT | 26.05.2021 | ||
| CY | 26.05.2021 | ||
| CZ | 26.05.2021 | ||
| DK | 26.05.2021 | ||
| EE | 26.05.2021 | ||
| ES | 26.05.2021 | ||
| FI | 26.05.2021 | ||
| HR | 26.05.2021 | ||
| IT | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| LV | 26.05.2021 | ||
| MC | 26.05.2021 | ||
| RO | 26.05.2021 | ||
| RS | 26.05.2021 | ||
| SE | 26.05.2021 | ||
| SI | 26.05.2021 | ||
| SK | 26.05.2021 | ||
| SM | 26.05.2021 | ||
| BG | 26.08.2021 | ||
| GR | 27.08.2021 | ||
| IS | 26.09.2021 | ||
| PT | 27.09.2021 | ||
| IE | 10.01.2022 | ||
| LU | 10.01.2022 | ||
| BE | 31.01.2022 | ||
| CH | 31.01.2022 | ||
| LI | 31.01.2022 | ||
| Former [2023/09] | AL | 26.05.2021 | |
| AT | 26.05.2021 | ||
| CZ | 26.05.2021 | ||
| DK | 26.05.2021 | ||
| EE | 26.05.2021 | ||
| ES | 26.05.2021 | ||
| FI | 26.05.2021 | ||
| HR | 26.05.2021 | ||
| IT | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| LV | 26.05.2021 | ||
| MC | 26.05.2021 | ||
| RO | 26.05.2021 | ||
| RS | 26.05.2021 | ||
| SE | 26.05.2021 | ||
| SI | 26.05.2021 | ||
| SK | 26.05.2021 | ||
| SM | 26.05.2021 | ||
| BG | 26.08.2021 | ||
| GR | 27.08.2021 | ||
| IS | 26.09.2021 | ||
| PT | 27.09.2021 | ||
| IE | 10.01.2022 | ||
| LU | 10.01.2022 | ||
| BE | 31.01.2022 | ||
| CH | 31.01.2022 | ||
| LI | 31.01.2022 | ||
| Former [2023/03] | AL | 26.05.2021 | |
| AT | 26.05.2021 | ||
| CZ | 26.05.2021 | ||
| DK | 26.05.2021 | ||
| EE | 26.05.2021 | ||
| ES | 26.05.2021 | ||
| FI | 26.05.2021 | ||
| HR | 26.05.2021 | ||
| IT | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| LV | 26.05.2021 | ||
| MC | 26.05.2021 | ||
| RO | 26.05.2021 | ||
| RS | 26.05.2021 | ||
| SE | 26.05.2021 | ||
| SI | 26.05.2021 | ||
| SK | 26.05.2021 | ||
| SM | 26.05.2021 | ||
| BG | 26.08.2021 | ||
| GR | 27.08.2021 | ||
| IS | 26.09.2021 | ||
| PT | 27.09.2021 | ||
| LU | 10.01.2022 | ||
| BE | 31.01.2022 | ||
| CH | 31.01.2022 | ||
| LI | 31.01.2022 | ||
| Former [2023/01] | AL | 26.05.2021 | |
| AT | 26.05.2021 | ||
| CZ | 26.05.2021 | ||
| DK | 26.05.2021 | ||
| EE | 26.05.2021 | ||
| ES | 26.05.2021 | ||
| FI | 26.05.2021 | ||
| HR | 26.05.2021 | ||
| IT | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| LV | 26.05.2021 | ||
| MC | 26.05.2021 | ||
| RO | 26.05.2021 | ||
| RS | 26.05.2021 | ||
| SE | 26.05.2021 | ||
| SI | 26.05.2021 | ||
| SK | 26.05.2021 | ||
| SM | 26.05.2021 | ||
| BG | 26.08.2021 | ||
| GR | 27.08.2021 | ||
| IS | 26.09.2021 | ||
| PT | 27.09.2021 | ||
| LU | 10.01.2022 | ||
| BE | 31.01.2022 | ||
| Former [2022/46] | AL | 26.05.2021 | |
| AT | 26.05.2021 | ||
| CZ | 26.05.2021 | ||
| DK | 26.05.2021 | ||
| EE | 26.05.2021 | ||
| ES | 26.05.2021 | ||
| FI | 26.05.2021 | ||
| HR | 26.05.2021 | ||
| IT | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| LV | 26.05.2021 | ||
| MC | 26.05.2021 | ||
| RO | 26.05.2021 | ||
| RS | 26.05.2021 | ||
| SE | 26.05.2021 | ||
| SI | 26.05.2021 | ||
| SK | 26.05.2021 | ||
| SM | 26.05.2021 | ||
| BG | 26.08.2021 | ||
| GR | 27.08.2021 | ||
| IS | 26.09.2021 | ||
| PT | 27.09.2021 | ||
| LU | 10.01.2022 | ||
| Former [2022/39] | AL | 26.05.2021 | |
| AT | 26.05.2021 | ||
| CZ | 26.05.2021 | ||
| DK | 26.05.2021 | ||
| EE | 26.05.2021 | ||
| ES | 26.05.2021 | ||
| FI | 26.05.2021 | ||
| HR | 26.05.2021 | ||
| IT | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| LV | 26.05.2021 | ||
| MC | 26.05.2021 | ||
| RO | 26.05.2021 | ||
| RS | 26.05.2021 | ||
| SE | 26.05.2021 | ||
| SI | 26.05.2021 | ||
| SK | 26.05.2021 | ||
| SM | 26.05.2021 | ||
| BG | 26.08.2021 | ||
| GR | 27.08.2021 | ||
| IS | 26.09.2021 | ||
| PT | 27.09.2021 | ||
| Former [2022/36] | AL | 26.05.2021 | |
| AT | 26.05.2021 | ||
| CZ | 26.05.2021 | ||
| DK | 26.05.2021 | ||
| EE | 26.05.2021 | ||
| ES | 26.05.2021 | ||
| FI | 26.05.2021 | ||
| HR | 26.05.2021 | ||
| IT | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| LV | 26.05.2021 | ||
| RO | 26.05.2021 | ||
| RS | 26.05.2021 | ||
| SE | 26.05.2021 | ||
| SI | 26.05.2021 | ||
| SK | 26.05.2021 | ||
| SM | 26.05.2021 | ||
| BG | 26.08.2021 | ||
| GR | 27.08.2021 | ||
| IS | 26.09.2021 | ||
| PT | 27.09.2021 | ||
| Former [2022/29] | AL | 26.05.2021 | |
| AT | 26.05.2021 | ||
| CZ | 26.05.2021 | ||
| DK | 26.05.2021 | ||
| EE | 26.05.2021 | ||
| ES | 26.05.2021 | ||
| FI | 26.05.2021 | ||
| HR | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| LV | 26.05.2021 | ||
| RO | 26.05.2021 | ||
| RS | 26.05.2021 | ||
| SE | 26.05.2021 | ||
| SI | 26.05.2021 | ||
| SK | 26.05.2021 | ||
| SM | 26.05.2021 | ||
| BG | 26.08.2021 | ||
| GR | 27.08.2021 | ||
| IS | 26.09.2021 | ||
| PT | 27.09.2021 | ||
| Former [2022/26] | AL | 26.05.2021 | |
| AT | 26.05.2021 | ||
| CZ | 26.05.2021 | ||
| DK | 26.05.2021 | ||
| EE | 26.05.2021 | ||
| ES | 26.05.2021 | ||
| FI | 26.05.2021 | ||
| HR | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| LV | 26.05.2021 | ||
| RO | 26.05.2021 | ||
| RS | 26.05.2021 | ||
| SE | 26.05.2021 | ||
| SK | 26.05.2021 | ||
| SM | 26.05.2021 | ||
| BG | 26.08.2021 | ||
| GR | 27.08.2021 | ||
| IS | 26.09.2021 | ||
| PT | 27.09.2021 | ||
| Former [2022/23] | AT | 26.05.2021 | |
| CZ | 26.05.2021 | ||
| DK | 26.05.2021 | ||
| EE | 26.05.2021 | ||
| ES | 26.05.2021 | ||
| FI | 26.05.2021 | ||
| HR | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| LV | 26.05.2021 | ||
| RO | 26.05.2021 | ||
| RS | 26.05.2021 | ||
| SE | 26.05.2021 | ||
| SK | 26.05.2021 | ||
| SM | 26.05.2021 | ||
| BG | 26.08.2021 | ||
| GR | 27.08.2021 | ||
| IS | 26.09.2021 | ||
| PT | 27.09.2021 | ||
| Former [2022/10] | AT | 26.05.2021 | |
| CZ | 26.05.2021 | ||
| DK | 26.05.2021 | ||
| EE | 26.05.2021 | ||
| ES | 26.05.2021 | ||
| FI | 26.05.2021 | ||
| HR | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| LV | 26.05.2021 | ||
| RO | 26.05.2021 | ||
| RS | 26.05.2021 | ||
| SE | 26.05.2021 | ||
| SK | 26.05.2021 | ||
| SM | 26.05.2021 | ||
| BG | 26.08.2021 | ||
| GR | 27.08.2021 | ||
| PT | 27.09.2021 | ||
| IS | 22.12.2021 | ||
| Former [2022/09] | AT | 26.05.2021 | |
| CZ | 26.05.2021 | ||
| DK | 26.05.2021 | ||
| ES | 26.05.2021 | ||
| FI | 26.05.2021 | ||
| HR | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| LV | 26.05.2021 | ||
| RO | 26.05.2021 | ||
| RS | 26.05.2021 | ||
| SE | 26.05.2021 | ||
| SK | 26.05.2021 | ||
| SM | 26.05.2021 | ||
| BG | 26.08.2021 | ||
| GR | 27.08.2021 | ||
| IS | 26.09.2021 | ||
| PT | 27.09.2021 | ||
| Former [2022/08] | AT | 26.05.2021 | |
| CZ | 26.05.2021 | ||
| DK | 26.05.2021 | ||
| ES | 26.05.2021 | ||
| FI | 26.05.2021 | ||
| HR | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| LV | 26.05.2021 | ||
| RS | 26.05.2021 | ||
| SE | 26.05.2021 | ||
| SM | 26.05.2021 | ||
| BG | 26.08.2021 | ||
| GR | 27.08.2021 | ||
| IS | 26.09.2021 | ||
| PT | 27.09.2021 | ||
| Former [2022/07] | AT | 26.05.2021 | |
| FI | 26.05.2021 | ||
| HR | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| LV | 26.05.2021 | ||
| RS | 26.05.2021 | ||
| SE | 26.05.2021 | ||
| SM | 26.05.2021 | ||
| BG | 26.08.2021 | ||
| GR | 27.08.2021 | ||
| IS | 26.09.2021 | ||
| PT | 27.09.2021 | ||
| Former [2021/51] | AT | 26.05.2021 | |
| FI | 26.05.2021 | ||
| HR | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| LV | 26.05.2021 | ||
| RS | 26.05.2021 | ||
| SE | 26.05.2021 | ||
| BG | 26.08.2021 | ||
| GR | 27.08.2021 | ||
| IS | 26.09.2021 | ||
| PT | 27.09.2021 | ||
| Former [2021/50] | AT | 26.05.2021 | |
| FI | 26.05.2021 | ||
| HR | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| LV | 26.05.2021 | ||
| SE | 26.05.2021 | ||
| BG | 26.08.2021 | ||
| GR | 27.08.2021 | ||
| PT | 27.09.2021 | ||
| Former [2021/49] | AT | 26.05.2021 | |
| FI | 26.05.2021 | ||
| HR | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| LV | 26.05.2021 | ||
| SE | 26.05.2021 | ||
| BG | 26.08.2021 | ||
| GR | 27.08.2021 | ||
| Former [2021/46] | AT | 26.05.2021 | |
| FI | 26.05.2021 | ||
| LT | 26.05.2021 | ||
| BG | 26.08.2021 | Documents cited: | Search | [A] US2005152452 (SUZUKI YOSHINORI et al.) | [AD] BROSS B ET AL: "High Efficiency Video Coding (HEVC) text specification Working Draft 5", 7. JCT-VC MEETING; 98. MPEG MEETING; 21-11-2011 - 30-11-2011; GENEVA; (JOINT COLLABORATIVE TEAM ON VIDEO CODING OF ISO/IEC JTC1/SC29/WG11 AND ITU-T SG.16 ); URL: HTTP://WFTP3.ITU.INT/AV-ARCH/JCTVC-SITE/,, no. JCTVC-G1103, 19 December 2011 (2011-12-19), XP030111032 | [AD] SUZUKI Y ET AL: "Extension of uni-prediction simplification in B slices", 4. JCT-VC MEETING; 95. MPEG MEETING; 20-1-2011 - 28-1-2011; DAEGU;(JOINT COLLABORATIVE TEAM ON VIDEO CODING OF ISO/IEC JTC1/SC29/WG11AND ITU-T SG.16 ); URL: HTTP://WFTP3.ITU.INT/AV-ARCH/JCTVC-SITE/,, no. JCTVC-D421, 20 January 2011 (2011-01-20), XP030008460, ISSN: 0000-0013 | [A] FANG S ET AL: "The Construction of Combined List for HEVC", 6. JCT-VC MEETING; 97. MPEG MEETING; 14-7-2011 - 22-7-2011; TORINO; (JOINT COLLABORATIVE TEAM ON VIDEO CODING OF ISO/IEC JTC1/SC29/WG11 AND ITU-T SG.16 ); URL: HTTP://WFTP3.ITU.INT/AV-ARCH/JCTVC-SITE/,, no. JCTVC-F573, 16 July 2011 (2011-07-16), XP030009596 | [A] YU Y ET AL: "The Reference Picture Construction of Combined List for HEVC", 7. JCT-VC MEETING; 98. MPEG MEETING; 21-11-2011 - 30-11-2011; GENEVA; (JOINT COLLABORATIVE TEAM ON VIDEO CODING OF ISO/IEC JTC1/SC29/WG11 AND ITU-T SG.16 ); URL: HTTP://WFTP3.ITU.INT/AV-ARCH/JCTVC-SITE/,, no. JCTVC-G717, 10 November 2011 (2011-11-10), XP030110701 | [AP] YE Y ET AL: "AHG21: Reference picture lists combination syntax", 8. JCT-VC MEETING; 99. MPEG MEETING; 1-2-2012 - 10-2-2012; SAN JOSE; (JOINT COLLABORATIVE TEAM ON VIDEO CODING OF ISO/IEC JTC1/SC29/WG11 AND ITU-T SG.16 ); URL: HTTP://WFTP3.ITU.INT/AV-ARCH/JCTVC-SITE/,, no. JCTVC-H0137, 21 January 2012 (2012-01-21), XP030111164 | [AD] HE Y ET AL: "AHG15: Clarification of mapping process for reference picture lists combination in B slices", 9. JCT-VC MEETING; 100. MPEG MEETING; 27-4-2012 - 7-5-2012; GENEVA; (JOINT COLLABORATIVE TEAM ON VIDEO CODING OF ISO/IEC JTC1/SC29/WG11 AND ITU-T SG.16 ); URL: HTTP://WFTP3.ITU.INT/AV-ARCH/JCTVC-SITE/,, no. JCTVC-I0220, 17 April 2012 (2012-04-17), XP030111983 [AD] 1-15 * paragraph [3.31] * * paragraph [3.68] * * paragraph [3.90] - paragraph [3.92] * * paragraph [7.3.3] * * paragraph [7.4.3] * * paragraph [8.2.2] * | [AD] HE Y ET AL: "AHG21: Unification of reference picture list modification processes", 8. JCT-VC MEETING; 99. MPEG MEETING; 1-2-2012 - 10-2-2012; SAN JOSE; (JOINT COLLABORATIVE TEAM ON VIDEO CODING OF ISO/IEC JTC1/SC29/WG11 AND ITU-T SG.16 ); URL: HTTP://WFTP3.ITU.INT/AV-ARCH/JCTVC-SITE/,, no. JCTVC-H0138, 21 January 2012 (2012-01-21), XP030111165 [AD] 1-15 * the whole document * | [A] YU Y ET AL: "Implicit signaling of collocated picture for HEVC", 8. JCT-VC MEETING; 99. MPEG MEETING; 1-2-2012 - 10-2-2012; SAN JOSE; (JOINT COLLABORATIVE TEAM ON VIDEO CODING OF ISO/IEC JTC1/SC29/WG11 AND ITU-T SG.16 ); URL: HTTP://WFTP3.ITU.INT/AV-ARCH/JCTVC-SITE/,, no. JCTVC-H0548, 22 January 2012 (2012-01-22), XP030111575 [A] 1-15 * the whole document * | [A] YU Y ET AL: "Modifications on signalling collocated picture", 9. JCT-VC MEETING; 100. MPEG MEETING; 27-4-2012 - 7-5-2012; GENEVA; (JOINT COLLABORATIVE TEAM ON VIDEO CODING OF ISO/IEC JTC1/SC29/WG11 AND ITU-T SG.16 ); URL: HTTP://WFTP3.ITU.INT/AV-ARCH/JCTVC-SITE/,, no. JCTVC-I0266, 17 April 2012 (2012-04-17), XP030112029 [A] 1-15 * the whole document * | [A] MCCANN K ET AL: "High Efficiency Video Coding (HEVC) Test Model 5 (HM 5) Encoder Description", 7. JCT-VC MEETING; 98. MPEG MEETING; 21-11-2011 - 30-11-2011; GENEVA; (JOINT COLLABORATIVE TEAM ON VIDEO CODING OF ISO/IEC JTC1/SC29/WG11 AND ITU-T SG.16 ); URL: HTTP://WFTP3.ITU.INT/AV-ARCH/JCTVC-SITE/,, no. JCTVC-G1102, 30 January 2012 (2012-01-30), XP030111031 | by applicant | B. BROSSW.-J. HANJ.-R. OHMG. J. SULLIVANT. WIEGAND: "WD5: Working Draft 5 of High-Efficiency Video Coding", DOCUMENT NO JCTVC-G1103, November 2011 (2011-11-01) | K. MCCANNS. SEKIGUCIB. BROSSW.-J. HAN: "HM5: HEVC Test Model 5 Encoder Description", DOCUMENT NO JCTVC-G 1102, December 2011 (2011-12-01) | J. BOYCER. SJOBERGY. K. WANG: "BoG report: Reference picture buffering and list construction", DOCUMENT NO JCTVC-G 1002, November 2011 (2011-11-01) | D. FLYNNR. SJOBERG ET AL.: "JCTVC AhG report: Reference picture buffering and list construction", DOCUMENT NO JCTVC-G021, November 2011 (2011-11-01) | Y. SUZUKI ET AL.: "Extension of uni-prediction simplification in B slices", DOCUMENT NO JCTVC-D421, January 2011 (2011-01-01) | B. BROSSW.-J. HANJ.-R. OHMG. J. SULLIVANT. WIEGAND: "WD9: Working Draft 9 of High-Efficiency Video Coding", DOCUMENT NO JCTVC-K1103, October 2012 (2012-10-01) |