EP3677822 - HYDRAULIC HOSE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.04.2022 Database last updated on 16.07.2024 | |
Former | The patent has been granted Status updated on 23.04.2021 | ||
Former | Grant of patent is intended Status updated on 14.12.2020 | ||
Former | Request for examination was made Status updated on 09.10.2020 | ||
Former | The application has been published Status updated on 05.06.2020 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Manuli Hydraulics Italia S.R.L. Via Pietro Paleocapa 7 20121 Milano / IT | [2020/28] | Inventor(s) | 01 /
SEGHI, Paolo Via Monte Popera, 16/30 20138 Milano / IT | [2020/28] | Representative(s) | Villanova, Massimo, et al Luppi Intellectual Property Srl Viale Corassori, 54 41124 Modena / IT | [2020/28] | Application number, filing date | 19200675.7 | 01.10.2019 | [2020/28] | Priority number, date | IT20180009085 | 02.10.2018 Original published format: IT201800009085 | [2020/28] | Filing language | IT | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3677822 | Date: | 08.07.2020 | Language: | EN | [2020/28] | Type: | B1 Patent specification | No.: | EP3677822 | Date: | 26.05.2021 | Language: | EN | [2021/21] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.06.2020 | Classification | IPC: | F16L11/08 | [2020/28] | CPC: |
F16L11/083 (EP);
F16L11/10 (CN);
F16L11/082 (US);
F16L11/088 (EP);
F16L57/02 (CN);
F16L57/06 (CN)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/46] |
Former [2020/28] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | HYDRAULISCHER SCHLAUCH | [2020/28] | English: | HYDRAULIC HOSE | [2020/28] | French: | TUYAU FLEXIBLE HYDRAULIQUE | [2020/28] | Examination procedure | 04.08.2020 | Amendment by applicant (claims and/or description) | 06.10.2020 | Examination requested [2020/46] | 06.10.2020 | Date on which the examining division has become responsible | 15.12.2020 | Communication of intention to grant the patent | 24.03.2021 | Receipt of the translation of the claim(s) | 15.04.2021 | Fee for grant paid | 15.04.2021 | Fee for publishing/printing paid | Opposition(s) | 01.03.2022 | No opposition filed within time limit [2022/18] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.10.2019 | AL | 26.05.2021 | AT | 26.05.2021 | CY | 26.05.2021 | CZ | 26.05.2021 | DK | 26.05.2021 | EE | 26.05.2021 | ES | 26.05.2021 | HR | 26.05.2021 | LT | 26.05.2021 | LV | 26.05.2021 | MC | 26.05.2021 | MK | 26.05.2021 | NL | 26.05.2021 | PL | 26.05.2021 | RO | 26.05.2021 | RS | 26.05.2021 | SE | 26.05.2021 | SI | 26.05.2021 | SK | 26.05.2021 | SM | 26.05.2021 | TR | 26.05.2021 | BG | 26.08.2021 | NO | 26.08.2021 | GR | 27.08.2021 | IS | 26.09.2021 | PT | 27.09.2021 | IE | 01.10.2021 | LU | 01.10.2021 | BE | 31.10.2021 | [2024/29] |
Former [2024/23] | HU | 01.10.2019 | |
AL | 26.05.2021 | ||
AT | 26.05.2021 | ||
CY | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
MK | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
IE | 01.10.2021 | ||
LU | 01.10.2021 | ||
BE | 31.10.2021 | ||
Former [2023/33] | HU | 01.10.2019 | |
AL | 26.05.2021 | ||
AT | 26.05.2021 | ||
CY | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
IE | 01.10.2021 | ||
LU | 01.10.2021 | ||
BE | 31.10.2021 | ||
Former [2023/30] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CY | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
IE | 01.10.2021 | ||
LU | 01.10.2021 | ||
BE | 31.10.2021 | ||
Former [2022/48] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
IE | 01.10.2021 | ||
LU | 01.10.2021 | ||
BE | 31.10.2021 | ||
Former [2022/35] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
LU | 01.10.2021 | ||
BE | 31.10.2021 | ||
Former [2022/33] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
BE | 31.10.2021 | ||
Former [2022/29] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/26] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/23] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/10] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
PT | 27.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
ES | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/08] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
ES | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/07] | AT | 26.05.2021 | |
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/04] | AT | 26.05.2021 | |
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/52] | AT | 26.05.2021 | |
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/51] | AT | 26.05.2021 | |
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/50] | AT | 26.05.2021 | |
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
PT | 27.09.2021 | ||
Former [2021/49] | AT | 26.05.2021 | |
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
Former [2021/47] | AT | 26.05.2021 | |
LT | 26.05.2021 | ||
BG | 26.08.2021 | ||
Former [2021/46] | AT | 26.05.2021 | |
LT | 26.05.2021 | Documents cited: | Search | [Y]US3212528 (WILLARD HAAS) [Y] 1-13 * column 2, line 63 - column 8, line 37 * * figure - *; | [Y]GB1486445 (SUPERFLEXIT) [Y] 1-13 * page 1, lines 53-62 * * figure - *; | [Y]EP0937933 (COFLEXIP [FR]) [Y] 1-13 * paragraph [0044]; figure - *; | [Y]WO2010110941 (PARKER HANNIFIN CORP [US], et al) [Y] 1-13 * the whole document *; | [A]FR3017438 (TECHNIP FRANCE [FR]) [A] 1-13 * page 10, lines 10-14 ** figure - * |