blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3614785

EP3614785 - METHOD FOR TRANSMITTING DEVICE TO DEVICE COMMUNICATION CHANNEL IN WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  14.01.2022
Database last updated on 31.05.2024
FormerThe patent has been granted
Status updated on  05.02.2021
FormerGrant of patent is intended
Status updated on  29.09.2020
FormerRequest for examination was made
Status updated on  14.08.2020
FormerThe application has been published
Status updated on  24.01.2020
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024 [2024/23]
Applicant(s)For all designated states
SK TELECOM CO., LTD.
65, Eulji-ro
Jung-gu
Seoul 04539 / KR
For all designated states
INNOSKY
8F, 14, Teheran-ro 63-gil
Gangnam-gu
Seoul 06160 / KR
[2020/09]
Inventor(s)01 / YOON, Sung Jun
c/o IP Cube Partners Co., Ltd.
2804, 37 Gukjegeumyung-ro 2-gil
Yeongdeungpo-gu
07327 Seoul / KR
 [2020/09]
Representative(s)Lock, Graham James, et al
Fry Heath & Spence LLP
Unit A, Faraday Court
Faraday Road
Crawley, West Sussex RH10 9PU / GB
[2021/10]
Former [2020/09]Boden, Keith McMurray
Fry Heath & Spence LLP
Unit A, Faraday Court
Faraday Road
Crawley, West Sussex RH10 9PU / GB
Application number, filing date19203128.414.10.2015
[2020/09]
Priority number, dateKR2014015480707.11.2014         Original published format: KR 20140154807
KR2014016123218.11.2014         Original published format: KR 20140161232
[2020/09]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3614785
Date:26.02.2020
Language:EN
[2020/09]
Type: B1 Patent specification 
No.:EP3614785
Date:10.03.2021
Language:EN
[2021/10]
Search report(s)(Supplementary) European search report - dispatched on:EP29.01.2020
ClassificationIPC:H04W76/14, H04B1/713, // H04W92/18
[2020/41]
CPC:
H04W76/14 (EP,CN,US); H04B7/2612 (KR); H04B1/713 (EP);
H04B7/2603 (KR); H04L27/2602 (EP,CN,KR,US); H04L5/0012 (EP);
H04L5/0051 (EP,US); H04L5/0092 (EP); H04W56/001 (EP,US);
H04W72/0446 (EP,CN,US); H04W8/005 (US); H04L27/261 (EP,US);
H04W92/18 (EP,US) (-)
Former IPC [2020/09]H04W76/14
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/38]
Former [2020/09]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN ZUR ÜBERTRAGUNG EINES MASCHINE-ZU-MASCHINE-KOMMUNIKATIONSKANALS IN EINEM DRAHTLOSKOMMUNIKATIONSSYSTEM[2020/09]
English:METHOD FOR TRANSMITTING DEVICE TO DEVICE COMMUNICATION CHANNEL IN WIRELESS COMMUNICATION SYSTEM[2020/09]
French:PROCÉDÉ DE TRANSMISSION DE CANAL DE COMMUNICATION DE DISPOSITIF À DISPOSITIF DANS UN SYSTÈME DE COMMUNICATION SANS FIL[2020/09]
Examination procedure12.08.2020Examination requested  [2020/38]
12.08.2020Date on which the examining division has become responsible
30.09.2020Communication of intention to grant the patent
28.01.2021Fee for grant paid
28.01.2021Fee for publishing/printing paid
29.01.2021Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP15857068.9  / EP3216139
Divisional application(s)EP20202795.9  / EP3793321
Opposition(s)13.12.2021No opposition filed within time limit [2022/07]
Fees paidRenewal fee
14.10.2019Renewal fee patent year 03
14.10.2019Renewal fee patent year 04
14.10.2019Renewal fee patent year 05
14.10.2020Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU14.10.2015
AL10.03.2021
AT10.03.2021
CY10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
MK10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
IE14.10.2021
LU14.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
[2024/23]
Former [2023/33]HU14.10.2015
AL10.03.2021
AT10.03.2021
CY10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
IE14.10.2021
LU14.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2023/30]AL10.03.2021
AT10.03.2021
CY10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
IE14.10.2021
LU14.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2022/48]AL10.03.2021
AT10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
IE14.10.2021
LU14.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2022/37]AL10.03.2021
AT10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
LU14.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2022/35]AL10.03.2021
AT10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
LU14.10.2021
BE31.10.2021
Former [2022/33]AL10.03.2021
AT10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
MC10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
BE31.10.2021
Former [2022/23]AL10.03.2021
AT10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2022/13]AL10.03.2021
AT10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SI10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
PT12.07.2021
Former [2022/10]AL10.03.2021
AT10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
PT12.07.2021
Former [2022/08]AL10.03.2021
AT10.03.2021
CZ10.03.2021
DK10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2022/07]AL10.03.2021
AT10.03.2021
CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2021/52]AT10.03.2021
CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
PL10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2021/51]AT10.03.2021
CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
IS10.07.2021
PT12.07.2021
Former [2021/50]AT10.03.2021
CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
RO10.03.2021
RS10.03.2021
SE10.03.2021
SK10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
PT12.07.2021
Former [2021/48]AT10.03.2021
CZ10.03.2021
EE10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
RS10.03.2021
SE10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/46]AT10.03.2021
FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
RS10.03.2021
SE10.03.2021
SM10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/38]FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
RS10.03.2021
SE10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/37]FI10.03.2021
HR10.03.2021
LT10.03.2021
LV10.03.2021
RS10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/36]FI10.03.2021
HR10.03.2021
LT10.03.2021
BG10.06.2021
NO10.06.2021
GR11.06.2021
Former [2021/35]FI10.03.2021
HR10.03.2021
LT10.03.2021
NO10.06.2021
Former [2021/33]FI10.03.2021
LT10.03.2021
NO10.06.2021
Documents cited:Search[A]  - LG ELECTRONICS, "Remaining issues for D2D control and data transmission", vol. RAN WG1, no. Ljubljana, Slovenia; 20141006 - 20141010, (20140927), 3GPP DRAFT; R1-144027, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_78b/Docs/, (20140927), XP050869691 [A] 1-10 * chapters 1, 2.1, 2.2 *
 [A]  - INTEL CORPORATION, "Discussion on physical structure of D2D data channel and PDU mapping", vol. RAN WG1, no. Dresden, Germany; 20140818 - 20140824, (20140817), 3GPP DRAFT; R1-143277 INTEL - DATA, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20140817), XP050788751 [A] 1-10 * chapters 3, 5, 6 *
 [A]  - ERICSSON, "Inclusion of ProSe", vol. RAN WG1, no. Ljubljana, Slovenia; 20141006 - 20141010, (20141014), 3GPP DRAFT; R1-144521 CR 36.211R1 PROSE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_78b/Docs/, (20141014), XP050885202 [A] 1-10 * chapters 4 - 4.2, 5.5.1.3, 5.5.2, 6.10.3 - 6.10.3A.2, 7.2, 9 - 9.10 *
 [A]  - LG ELECTRONICS ET AL, "WF on interpretation of slot number and frame number", vol. RAN WG1, no. Ljubljana, Slovenia; 20141006 - 20141010, (20141009), 3GPP DRAFT; R1-144391 WF ON INTERPRETATION OF SLOT NUMBER AND FRAME NUMBER, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CED, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_78b/Docs/, (20141009), XP050896119 [A] 1-10 * page 2 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.