blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3809390

EP3809390 - A METHOD, SYSTEM, AND VEHICLE FOR CONTROLLING A VEHICLE SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  20.06.2024
Database last updated on 09.09.2024
FormerThe patent has been granted
Status updated on  14.07.2023
FormerGrant of patent is intended
Status updated on  15.03.2023
FormerRequest for examination was made
Status updated on  29.10.2021
FormerThe application has been published
Status updated on  19.03.2021
Most recent event   Tooltip02.08.2024Lapse of the patent in a contracting state
New state(s): BE, IT, SI
published on 04.09.2024  [2024/36]
Applicant(s)For all designated states
Zenuity AB
Konsert Strategy & IP
Arvid Wallgrens backe 20
413 46 Göteborg / SE
[2023/33]
Former [2021/16]For all designated states
Zenuity AB
Lindholmspiren 2
417 56 Göteborg / SE
Inventor(s)01 / FU, Junsheng
Skjutsvägen 37
44935 Nödinge / SE
02 / SCHINDLER, Andreas
Penselgatan 20
417 24 Göteborg / SE
03 / BRÄNNSTRÖM, Mattias
Miraallén 59
417 58 Göteborg / SE
 [2021/16]
Representative(s)Zacco Sweden AB
P.O. Box 5581
Löjtnantsgatan 21
114 85 Stockholm / SE
[2023/33]
Former [2021/16]Zacco Sweden AB
P.O. Box 5581
114 85 Stockholm / SE
Application number, filing date19203521.016.10.2019
[2021/16]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3809390
Date:21.04.2021
Language:EN
[2021/16]
Type: B1 Patent specification 
No.:EP3809390
Date:16.08.2023
Language:EN
[2023/33]
Search report(s)(Supplementary) European search report - dispatched on:EP02.04.2020
ClassificationIPC:G08G1/0967, G08G1/16
[2021/16]
CPC:
G08G1/166 (EP,US); B60W60/0011 (US); B60W60/0016 (US);
G06F18/24 (US); G06V20/584 (US); G08G1/162 (EP);
B60W2050/0075 (US); B60W2554/4041 (US); B60W2554/4046 (US);
B60W2556/45 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/48]
Former [2021/16]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN, SYSTEM UND FAHRZEUG ZUR STEUERUNG EINES FAHRZEUGSYSTEMS[2021/16]
English:A METHOD, SYSTEM, AND VEHICLE FOR CONTROLLING A VEHICLE SYSTEM[2021/16]
French:PROCÉDÉ, SYSTÈME, VÉHICULE POUR COMMANDER UN SYSTÈME DE VÉHICULE[2021/16]
Examination procedure21.10.2021Amendment by applicant (claims and/or description)
21.10.2021Examination requested  [2021/48]
21.10.2021Date on which the examining division has become responsible
16.03.2023Communication of intention to grant the patent
07.07.2023Fee for grant paid
07.07.2023Fee for publishing/printing paid
07.07.2023Receipt of the translation of the claim(s)
Opposition(s)17.05.2024No opposition filed within time limit [2024/30]
Fees paidRenewal fee
21.09.2021Renewal fee patent year 03
21.09.2022Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT16.08.2023
CZ16.08.2023
DK16.08.2023
EE16.08.2023
ES16.08.2023
FI16.08.2023
HR16.08.2023
IT16.08.2023
LT16.08.2023
LV16.08.2023
MC16.08.2023
NL16.08.2023
PL16.08.2023
RO16.08.2023
RS16.08.2023
SE16.08.2023
SI16.08.2023
SK16.08.2023
SM16.08.2023
LU16.10.2023
BE31.10.2023
CH31.10.2023
NO16.11.2023
GR17.11.2023
IS16.12.2023
PT18.12.2023
[2024/36]
Former [2024/34]AT16.08.2023
CZ16.08.2023
DK16.08.2023
EE16.08.2023
ES16.08.2023
FI16.08.2023
HR16.08.2023
LT16.08.2023
LV16.08.2023
MC16.08.2023
NL16.08.2023
PL16.08.2023
RO16.08.2023
RS16.08.2023
SE16.08.2023
SK16.08.2023
SM16.08.2023
LU16.10.2023
CH31.10.2023
NO16.11.2023
GR17.11.2023
IS16.12.2023
PT18.12.2023
Former [2024/30]AT16.08.2023
CZ16.08.2023
DK16.08.2023
EE16.08.2023
ES16.08.2023
FI16.08.2023
HR16.08.2023
LT16.08.2023
LV16.08.2023
MC16.08.2023
NL16.08.2023
PL16.08.2023
RO16.08.2023
RS16.08.2023
SE16.08.2023
SK16.08.2023
SM16.08.2023
LU16.10.2023
NO16.11.2023
GR17.11.2023
IS16.12.2023
PT18.12.2023
Former [2024/28]AT16.08.2023
CZ16.08.2023
DK16.08.2023
EE16.08.2023
ES16.08.2023
FI16.08.2023
HR16.08.2023
LT16.08.2023
LV16.08.2023
MC16.08.2023
NL16.08.2023
PL16.08.2023
RO16.08.2023
RS16.08.2023
SE16.08.2023
SK16.08.2023
SM16.08.2023
NO16.11.2023
GR17.11.2023
IS16.12.2023
PT18.12.2023
Former [2024/23]AT16.08.2023
CZ16.08.2023
DK16.08.2023
EE16.08.2023
ES16.08.2023
FI16.08.2023
HR16.08.2023
LT16.08.2023
LV16.08.2023
NL16.08.2023
PL16.08.2023
RO16.08.2023
RS16.08.2023
SE16.08.2023
SK16.08.2023
SM16.08.2023
NO16.11.2023
GR17.11.2023
IS16.12.2023
PT18.12.2023
Former [2024/22]AT16.08.2023
CZ16.08.2023
DK16.08.2023
FI16.08.2023
HR16.08.2023
LT16.08.2023
LV16.08.2023
NL16.08.2023
PL16.08.2023
RO16.08.2023
RS16.08.2023
SE16.08.2023
SM16.08.2023
NO16.11.2023
GR17.11.2023
IS16.12.2023
PT18.12.2023
Former [2024/20]AT16.08.2023
FI16.08.2023
HR16.08.2023
LT16.08.2023
LV16.08.2023
NL16.08.2023
PL16.08.2023
RS16.08.2023
SE16.08.2023
SM16.08.2023
NO16.11.2023
GR17.11.2023
IS16.12.2023
PT18.12.2023
Former [2024/10]AT16.08.2023
FI16.08.2023
HR16.08.2023
LT16.08.2023
LV16.08.2023
NL16.08.2023
PL16.08.2023
RS16.08.2023
SE16.08.2023
NO16.11.2023
GR17.11.2023
IS16.12.2023
PT18.12.2023
Former [2024/09]AT16.08.2023
FI16.08.2023
LT16.08.2023
NL16.08.2023
SE16.08.2023
NO16.11.2023
GR17.11.2023
IS16.12.2023
Former [2024/08]LT16.08.2023
NL16.08.2023
NO16.11.2023
GR17.11.2023
Documents cited:Search[X]US2013268184  (ZAGORSKI CHAD T [US], et al) [X] 1,10,11,13 * paragraphs [0015] , [0024] - [0027] - [0037] - [0039] - [0044] , [0055] - [0065] *;
 [XI]US2018018869  (AHMAD MOHAMED [US], et al) [X] 1,11,13 * paragraphs [0014] , [0035]; figures 1,4 * [I] 10;
 [A]US2019051168  (DU JIANG [US], et al) [A] 1,10,11,13* paragraph [0051]; figure 3 *;
 [XAI]US2019088135  (DO JU-YONG [US], et al) [X] 1,2,10-15 * paragraphs [0005] , [0018] , [0043] , [0044] , [0061] , [0062]; figure 2 * [A] 3,4,6 [I] 5,7-9
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.