blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3628878

EP3628878 - CRANKSHAFT AND CONROD ASSEMBLY [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.01.2022
Database last updated on 26.06.2024
FormerThe patent has been granted
Status updated on  12.02.2021
FormerGrant of patent is intended
Status updated on  04.11.2020
FormerRequest for examination was made
Status updated on  09.10.2020
FormerThe application has been published
Status updated on  28.02.2020
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
Volvo Car Corporation
40531 Göteborg / SE
[2020/14]
Inventor(s)01 / ODENMARCK, Christer
Björlanda Strand 21
SE-423 61 TORSLANDA / SE
02 / STRÖMSTEDT, Fredrik
Backen, Hagalund
SE-511 92 ÖRBY / SE
03 / PETROV, Peter
Malörtsgatan 110
SE-424 61 ANGERED / SE
 [2020/14]
Representative(s)Kransell & Wennborg KB
P.O. Box 2096
403 12 Göteborg / SE
[2020/14]
Application number, filing date19203813.109.05.2017
[2020/14]
Previously filed application, dateEP2017017020909.05.2017
[2020/14]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3628878
Date:01.04.2020
Language:EN
[2020/14]
Type: B1 Patent specification 
No.:EP3628878
Date:17.03.2021
Language:EN
[2021/11]
Search report(s)(Supplementary) European search report - dispatched on:EP13.01.2020
ClassificationIPC:F16C3/14, F16C7/06, F16C9/04, // F16C7/04, F16C17/02, F16C33/10
[2020/14]
CPC:
F16C3/14 (EP,US); F02B75/045 (US); F02D15/04 (US);
F16C7/06 (EP,US); F16C9/04 (EP,US); F01M1/06 (US);
F01M2001/062 (US); F01M2011/026 (US); F01M2011/027 (US);
F16C17/02 (EP); F16C2360/22 (EP,US); F16C33/1025 (EP);
F16C7/04 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/46]
Former [2020/14]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:KURBELWELLE UND PLEUELANORDNUNG[2020/14]
English:CRANKSHAFT AND CONROD ASSEMBLY[2020/14]
French:ENSEMBLE BIELLE ET VILEBREQUIN[2020/14]
Examination procedure01.10.2020Examination requested  [2020/46]
01.10.2020Date on which the examining division has become responsible
05.11.2020Communication of intention to grant the patent
08.02.2021Fee for grant paid
08.02.2021Fee for publishing/printing paid
08.02.2021Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP17170209.5  / EP3401560
Opposition(s)20.12.2021No opposition filed within time limit [2022/08]
Fees paidRenewal fee
17.02.2020Renewal fee patent year 03
02.06.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.05.2017
AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
MK17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE09.05.2021
LU09.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
GB17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
[2024/23]
Former [2023/33]HU09.05.2017
AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE09.05.2021
LU09.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
GB17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2023/30]AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE09.05.2021
LU09.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
GB17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/34]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE09.05.2021
LU09.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
GB17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/23]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE09.05.2021
LU09.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
GB17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/22]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE09.05.2021
LU09.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
GB17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2022/21]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
IE09.05.2021
LU09.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2022/11]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
LU09.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2022/10]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
LU09.05.2021
CH31.05.2021
LI31.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2022/08]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
LU09.05.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/07]AL17.03.2021
AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2021/52]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2021/51]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2021/50]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2021/48]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RS17.03.2021
SE17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/47]AT17.03.2021
CZ17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RS17.03.2021
SE17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/46]AT17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RS17.03.2021
SE17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/43]FI17.03.2021
HR17.03.2021
LV17.03.2021
NL17.03.2021
RS17.03.2021
SE17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/38]FI17.03.2021
HR17.03.2021
LV17.03.2021
RS17.03.2021
SE17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/37]FI17.03.2021
HR17.03.2021
LV17.03.2021
RS17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/36]FI17.03.2021
HR17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/35]FI17.03.2021
HR17.03.2021
NO17.06.2021
Former [2021/33]FI17.03.2021
NO17.06.2021
Documents cited:Search[A]GB950215  (HUMBER LTD, et al) [A] 1-8 * page 2, line 4 - line 24; figures 1,2 *;
 [A]US4201176  (LUSTGARTEN GEORGE [CH]) [A] 1-7 * column 2, line 22 - line 66; figures 1-2 *;
 [A]US2444108  (NORTON ORLO C) [A] 1,5-8 * column 7, line 24 - column 9, line 36; figure 3 *;
 [A]US4370901  (BOLEN RALPH A) [A] 1,4-8 * column 3, line 19 - column 6, line 63; figures 1-6 *;
 [AD]US2015075497  (HUTZELMANN STEPHANIE [DE], et al) [AD] 6-8 * the whole document *
by applicantUS2015075497
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.