EP3643990 - HYBRID HEATING SYSTEM [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 21.07.2023 Database last updated on 15.06.2024 | |
Former | Grant of patent is intended Status updated on 17.07.2023 | ||
Former | Examination is in progress Status updated on 30.06.2023 | ||
Former | Grant of patent is intended Status updated on 27.02.2023 | ||
Former | Examination is in progress Status updated on 09.12.2021 | ||
Former | Request for examination was made Status updated on 27.03.2020 | Most recent event Tooltip | 07.06.2024 | Lapse of the patent in a contracting state New state(s): MC | published on 10.07.2024 [2024/28] | Applicant(s) | For all designated states LG Electronics Inc. 128, Yeoui-daero, Yeongdeungpo-Gu Seoul 07336 / KR | [2020/18] | Inventor(s) | 01 /
KIM, Minsoo 51, Gasan digital 1-ro, Geumcheon-gu 08592 Seoul / KR | 02 /
RYU, Jihyeong 51, Gasan digital 1-ro, Geumcheon-gu 08592 Seoul / KR | 03 /
LEE, Youngmin 51, Gasan digital 1-ro, Geumcheon-gu 08592 Seoul / KR | 04 /
CHO, Eunjun 51, Gasan digital 1-ro, Geumcheon-gu 08592 Seoul / KR | [2020/18] | Representative(s) | Vossius & Partner Patentanwälte Rechtsanwälte mbB Siebertstrasse 3 81675 München / DE | [2020/18] | Application number, filing date | 19204572.2 | 22.10.2019 | [2020/18] | Priority number, date | KR20180126195 | 22.10.2018 Original published format: KR 20180126195 | [2020/18] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3643990 | Date: | 29.04.2020 | Language: | EN | [2020/18] | Type: | B1 Patent specification | No.: | EP3643990 | Date: | 23.08.2023 | Language: | EN | [2023/34] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 02.03.2020 | Classification | IPC: | F25B30/02, F25B47/02, F24D12/02 | [2020/18] | CPC: |
F25B47/022 (EP);
F24D12/02 (EP,KR);
F28D21/0007 (US);
F24D19/1072 (KR);
F24D3/08 (EP,KR);
F24D3/18 (KR);
F24H1/38 (US);
F24H6/00 (US);
F25B30/02 (EP);
F25B47/02 (KR);
F24D2200/123 (KR);
F24D3/12 (EP);
F25B2339/047 (EP);
F25B2347/021 (EP);
F25B2347/023 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/49] |
Former [2020/18] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | HYBRIDES HEIZSYSTEM | [2020/18] | English: | HYBRID HEATING SYSTEM | [2020/18] | French: | SYSTÈME DE CHAUFFAGE HYBRIDE | [2020/18] | Examination procedure | 22.11.2019 | Examination requested [2020/18] | 28.10.2020 | Amendment by applicant (claims and/or description) | 08.12.2021 | Despatch of a communication from the examining division (Time limit: M04) | 06.04.2022 | Reply to a communication from the examining division | 28.02.2023 | Communication of intention to grant the patent | 28.06.2023 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 28.06.2023 | Fee for grant paid | 28.06.2023 | Fee for publishing/printing paid | 18.07.2023 | Communication of intention to grant the patent | 19.07.2023 | Receipt of the translation of the claim(s) | Fees paid | Renewal fee | 25.10.2021 | Renewal fee patent year 03 | 25.10.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 23.08.2023 | CZ | 23.08.2023 | DK | 23.08.2023 | EE | 23.08.2023 | ES | 23.08.2023 | FI | 23.08.2023 | HR | 23.08.2023 | IT | 23.08.2023 | LT | 23.08.2023 | LV | 23.08.2023 | MC | 23.08.2023 | NL | 23.08.2023 | PL | 23.08.2023 | RO | 23.08.2023 | RS | 23.08.2023 | SE | 23.08.2023 | SK | 23.08.2023 | SM | 23.08.2023 | NO | 23.11.2023 | GR | 24.11.2023 | IS | 23.12.2023 | PT | 26.12.2023 | [2024/28] |
Former [2024/26] | AT | 23.08.2023 | |
CZ | 23.08.2023 | ||
DK | 23.08.2023 | ||
EE | 23.08.2023 | ||
ES | 23.08.2023 | ||
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
IT | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RO | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
SK | 23.08.2023 | ||
SM | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
Former [2024/23] | AT | 23.08.2023 | |
CZ | 23.08.2023 | ||
DK | 23.08.2023 | ||
EE | 23.08.2023 | ||
ES | 23.08.2023 | ||
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RO | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
SK | 23.08.2023 | ||
SM | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
Former [2024/22] | AT | 23.08.2023 | |
CZ | 23.08.2023 | ||
DK | 23.08.2023 | ||
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RO | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
SM | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
Former [2024/20] | AT | 23.08.2023 | |
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
SM | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
Former [2024/10] | AT | 23.08.2023 | |
FI | 23.08.2023 | ||
HR | 23.08.2023 | ||
LT | 23.08.2023 | ||
LV | 23.08.2023 | ||
NL | 23.08.2023 | ||
PL | 23.08.2023 | ||
RS | 23.08.2023 | ||
SE | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
PT | 26.12.2023 | ||
Former [2024/09] | AT | 23.08.2023 | |
FI | 23.08.2023 | ||
LT | 23.08.2023 | ||
NL | 23.08.2023 | ||
SE | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | ||
IS | 23.12.2023 | ||
Former [2024/08] | LT | 23.08.2023 | |
NL | 23.08.2023 | ||
NO | 23.11.2023 | ||
GR | 24.11.2023 | Documents cited: | Search | [Y]JPH07190526 (MATSUSHITA ELECTRIC IND CO LTD) [Y] 5-8 * paragraphs [0018] - [0038]; figures 5, 6 *; | [XY]WO2014083440 (GAS POINT S R L [IT]) [X] 1-4 * page 4, line 11 - page 5, line 6 * * page 7, line 23 - page 10, line 19; figures 5, 6 * * page 14, line 19 - page 18, line 3 * [Y] 5-10; | [Y]WO2014148704 (JISANENERTECH CO LTD [KR], et al) [Y] 5-8 * paragraphs [0026] - [0034]; figures 2, 3 *; | [IY]KR20150043830 (KTEC) [I] 1-3 * paragraphs [0020] - [0053]; figures 1, 2 *[Y] 9,10 | by applicant | KR20130135022 |