blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3647141

EP3647141 - METHOD AND ARRANGEMENT FOR DETERMINING A TARGET DECELERATION FOR AN EGO VEHICLE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.06.2023
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  08.07.2022
FormerGrant of patent is intended
Status updated on  10.04.2022
FormerRequest for examination was made
Status updated on  13.11.2020
FormerThe application has been published
Status updated on  03.04.2020
Most recent event   Tooltip19.07.2024Lapse of the patent in a contracting state
New state(s): BG
published on 21.08.2024  [2024/34]
Applicant(s)For all designated states
Volkswagen AG
Berliner Ring 2
38440 Wolfsburg / DE
[2020/19]
Inventor(s)01 / Duncan, Benjamin
Carmeq
Transvaalstraße 43
13351 Berlin / DE
 [2020/19]
Application number, filing date19205666.128.10.2019
[2020/19]
Priority number, dateDE20181021884405.11.2018         Original published format: DE102018218844
[2020/19]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3647141
Date:06.05.2020
Language:DE
[2020/19]
Type: B1 Patent specification 
No.:EP3647141
Date:10.08.2022
Language:DE
[2022/32]
Search report(s)(Supplementary) European search report - dispatched on:EP20.03.2020
ClassificationIPC:B60W30/09, B60W30/095, B60T7/22, B60T8/1755, B60W30/17
[2020/19]
CPC:
B60W30/09 (EP); B60T7/22 (EP,CN); B60W30/181 (US);
B60T8/17551 (EP); B60W10/04 (US); B60W30/08 (CN);
B60W30/095 (EP); B60W30/0953 (EP); B60W30/0956 (EP);
B60W30/16 (CN); B60W30/17 (EP); B60W40/02 (CN);
B60W40/10 (CN); G08G1/166 (CN); B60T2201/022 (EP);
B60W2510/18 (US); B60W2520/10 (CN); B60W2520/105 (CN);
B60W2554/4041 (EP); B60W2554/4042 (EP); B60W2554/4045 (EP);
B60W2554/4047 (EP); B60W2554/801 (US); B60W2720/106 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/51]
Former [2020/19]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN UND ANORDNUNG ZUM FESTLEGEN EINER SOLL-VERZÖGERUNG FÜR EIN EGOFAHRZEUG[2020/19]
English:METHOD AND ARRANGEMENT FOR DETERMINING A TARGET DECELERATION FOR AN EGO VEHICLE[2020/19]
French:PROCÉDÉ ET DISPOSITIF DE DÉTERMINATION D'UN DÉLAI DE CONSIGNE POUR UN VÉHICULE AUTONOME[2020/19]
Examination procedure14.10.2020Amendment by applicant (claims and/or description)
06.11.2020Examination requested  [2020/51]
06.11.2020Date on which the examining division has become responsible
11.04.2022Communication of intention to grant the patent
01.07.2022Fee for grant paid
01.07.2022Fee for publishing/printing paid
01.07.2022Receipt of the translation of the claim(s)
Opposition(s)11.05.2023No opposition filed within time limit [2023/29]
Fees paidRenewal fee
02.11.2021Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.10.2019
AL10.08.2022
BG10.08.2022
CY10.08.2022
CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
IT10.08.2022
LT10.08.2022
LV10.08.2022
MC10.08.2022
MK10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SI10.08.2022
SK10.08.2022
SM10.08.2022
IE28.10.2022
LU28.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
[2024/34]
Former [2024/27]HU28.10.2019
AL10.08.2022
CY10.08.2022
CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
IT10.08.2022
LT10.08.2022
LV10.08.2022
MC10.08.2022
MK10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SI10.08.2022
SK10.08.2022
SM10.08.2022
IE28.10.2022
LU28.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2024/26]HU28.10.2019
AL10.08.2022
CY10.08.2022
CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
IT10.08.2022
LT10.08.2022
LV10.08.2022
MC10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SI10.08.2022
SK10.08.2022
SM10.08.2022
IE28.10.2022
LU28.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2024/21]HU28.10.2019
AL10.08.2022
CY10.08.2022
CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
MC10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SI10.08.2022
SK10.08.2022
SM10.08.2022
IE28.10.2022
LU28.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2024/18]HU28.10.2019
AL10.08.2022
CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
MC10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SI10.08.2022
SK10.08.2022
SM10.08.2022
IE28.10.2022
LU28.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/48]AL10.08.2022
CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
MC10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SI10.08.2022
SK10.08.2022
SM10.08.2022
IE28.10.2022
LU28.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/42]AL10.08.2022
CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
MC10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SI10.08.2022
SK10.08.2022
SM10.08.2022
LU28.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/37]AL10.08.2022
CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
MC10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SI10.08.2022
SK10.08.2022
SM10.08.2022
LU28.10.2022
CH31.10.2022
LI31.10.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/35]AL10.08.2022
CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
MC10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SK10.08.2022
SM10.08.2022
LU28.10.2022
CH31.10.2022
LI31.10.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/30]AL10.08.2022
CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
MC10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SK10.08.2022
SM10.08.2022
LU28.10.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/29]AL10.08.2022
CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
MC10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SK10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/25]CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
MC10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SK10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/23]CZ10.08.2022
DK10.08.2022
EE10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SK10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/22]CZ10.08.2022
DK10.08.2022
ES10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RO10.08.2022
RS10.08.2022
SE10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/21]DK10.08.2022
FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RS10.08.2022
SE10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/20]FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RS10.08.2022
SE10.08.2022
SM10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/12]FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RS10.08.2022
SE10.08.2022
NO10.11.2022
GR11.11.2022
IS10.12.2022
PT12.12.2022
Former [2023/11]FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
PL10.08.2022
RS10.08.2022
SE10.08.2022
NO10.11.2022
GR11.11.2022
PT12.12.2022
Former [2023/10]FI10.08.2022
HR10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
RS10.08.2022
SE10.08.2022
NO10.11.2022
GR11.11.2022
PT12.12.2022
Former [2023/09]FI10.08.2022
LT10.08.2022
LV10.08.2022
NL10.08.2022
RS10.08.2022
SE10.08.2022
NO10.11.2022
PT12.12.2022
Former [2023/08]FI10.08.2022
LT10.08.2022
NL10.08.2022
RS10.08.2022
SE10.08.2022
NO10.11.2022
Documents cited:Search[Y]DE102004004918  (WABCO GMBH & CO OHG [DE]) [Y] 4,7* paragraph [0042] *;
 [XY]DE60116801T  (AISIN SEIKI [JP], et al) [X] 1-3,5,6,8,9 * paragraphs [0001] , [0092] - [0100] - [0136]; figure 1 * [Y] 4,7;
 [XY]DE102006034411  (BOSCH GMBH ROBERT [DE]) [X] 1-3,5,6,8,9 * paragraphs [0034] , [0041] , [0051]; figure 3 * [Y] 4,7;
 [ID]DE102012002695  (WABCO GMBH [DE]) [ID] 1-3,5,6,8,9 * paragraph [0024] *
by applicantDE102012002695
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.