EP3650347 - AN ITEM OF AIRCRAFT FURNITURE AND MOUNTING METHOD [Right-click to bookmark this link] | |||
Former [2020/20] | MOUNTING STRUCTURE AND ARRANGEMENT | ||
[2021/17] | Status | No opposition filed within time limit Status updated on 07.10.2022 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 29.10.2021 | ||
Former | Grant of patent is intended Status updated on 15.06.2021 | ||
Former | Request for examination was made Status updated on 07.05.2021 | ||
Former | Grant of patent is intended Status updated on 15.04.2021 | ||
Former | Request for examination was made Status updated on 06.11.2020 | ||
Former | The application has been published Status updated on 10.04.2020 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Safran Seats GB Limited Kestrel House Lakeside Llantarnam Industrial Park Cwmbran NP44 3HQ / GB | [2020/20] | Inventor(s) | 01 /
Silverwood, Neal Safran Seats GB Limited Kestrel House Lakeside Llantarnam Industrial Park Cwmbran, Gwent NP44 3HQ / GB | 02 /
Pearce, Clive Safran Seats GB Limited Kestrel House Lakeside Llantarnam Industrial Park Cwmbran, Gwent NP44 3HQ / GB | [2020/20] | Representative(s) | Abel & Imray LLP Westpoint Building James Street West Bath BA1 2DA / GB | [N/P] |
Former [2020/20] | Abel & Imray Westpoint Building James Street West Bath BA1 2DA / GB | Application number, filing date | 19205933.5 | 29.10.2019 | [2020/20] | Priority number, date | GB20180017977 | 02.11.2018 Original published format: GB 201817977 | [2020/20] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3650347 | Date: | 13.05.2020 | Language: | EN | [2020/20] | Type: | B1 Patent specification | No.: | EP3650347 | Date: | 01.12.2021 | Language: | EN | [2021/48] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 14.04.2020 | Classification | IPC: | B64D11/06 | [2020/20] | CPC: |
B64D11/0696 (EP,GB,US);
B60N2/005 (GB);
B64C1/18 (GB);
B64D11/06 (GB)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/50] |
Former [2020/20] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | GEGENSTAND VON FLUGZEUGMÖBELN UND MONTAGEVERFAHREN | [2021/17] | English: | AN ITEM OF AIRCRAFT FURNITURE AND MOUNTING METHOD | [2021/17] | French: | MEUBLE D'AVION ET PROCÉDÉ DE MONTAGE | [2021/17] |
Former [2020/20] | MONTAGESTRUKTUR UND ANORDNUNG | ||
Former [2020/20] | MOUNTING STRUCTURE AND ARRANGEMENT | ||
Former [2020/20] | STRUCTURE ET AGENCEMENT DE MONTAGE | Examination procedure | 30.10.2020 | Amendment by applicant (claims and/or description) | 30.10.2020 | Examination requested [2020/50] | 30.10.2020 | Date on which the examining division has become responsible | 24.03.2021 | Cancellation of oral proceeding that was planned for 14.04.2021 | 14.04.2021 | Date of oral proceedings (cancelled) | 16.04.2021 | Communication of intention to grant the patent | 05.05.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 16.06.2021 | Communication of intention to grant the patent | 25.10.2021 | Fee for grant paid | 25.10.2021 | Fee for publishing/printing paid | 25.10.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 02.09.2022 | No opposition filed within time limit [2022/45] | Fees paid | Renewal fee | 20.10.2021 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.10.2019 | AL | 01.12.2021 | AT | 01.12.2021 | CY | 01.12.2021 | CZ | 01.12.2021 | DK | 01.12.2021 | EE | 01.12.2021 | ES | 01.12.2021 | FI | 01.12.2021 | HR | 01.12.2021 | IT | 01.12.2021 | LT | 01.12.2021 | LV | 01.12.2021 | MC | 01.12.2021 | MK | 01.12.2021 | MT | 01.12.2021 | NL | 01.12.2021 | PL | 01.12.2021 | RO | 01.12.2021 | RS | 01.12.2021 | SE | 01.12.2021 | SI | 01.12.2021 | SK | 01.12.2021 | SM | 01.12.2021 | BG | 01.03.2022 | NO | 01.03.2022 | GR | 02.03.2022 | IS | 01.04.2022 | PT | 01.04.2022 | [2024/44] |
Former [2024/27] | HU | 29.10.2019 | |
AL | 01.12.2021 | ||
AT | 01.12.2021 | ||
CY | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
IT | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
MK | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2024/21] | HU | 29.10.2019 | |
AL | 01.12.2021 | ||
AT | 01.12.2021 | ||
CY | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
IT | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2024/18] | HU | 29.10.2019 | |
AL | 01.12.2021 | ||
AT | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
IT | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2023/25] | AL | 01.12.2021 | |
AT | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
IT | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
MC | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2023/01] | AL | 01.12.2021 | |
AT | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SI | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2022/49] | AL | 01.12.2021 | |
AT | 01.12.2021 | ||
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2022/46] | AT | 01.12.2021 | |
CZ | 01.12.2021 | ||
DK | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2022/42] | AT | 01.12.2021 | |
CZ | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
IS | 01.04.2022 | ||
PT | 01.04.2022 | ||
Former [2022/35] | AT | 01.12.2021 | |
CZ | 01.12.2021 | ||
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SK | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
PT | 01.04.2022 | ||
Former [2022/34] | AT | 01.12.2021 | |
EE | 01.12.2021 | ||
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RO | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
PT | 01.04.2022 | ||
Former [2022/33] | AT | 01.12.2021 | |
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
SM | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
Former [2022/30] | AT | 01.12.2021 | |
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
NL | 01.12.2021 | ||
PL | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
Former [2022/25] | AT | 01.12.2021 | |
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
PL | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
BG | 01.03.2022 | ||
NO | 01.03.2022 | ||
GR | 02.03.2022 | ||
Former [2022/24] | AT | 01.12.2021 | |
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
PL | 01.12.2021 | ||
RS | 01.12.2021 | ||
SE | 01.12.2021 | ||
BG | 01.03.2022 | ||
GR | 02.03.2022 | ||
Former [2022/23] | AT | 01.12.2021 | |
ES | 01.12.2021 | ||
FI | 01.12.2021 | ||
HR | 01.12.2021 | ||
LT | 01.12.2021 | ||
LV | 01.12.2021 | ||
PL | 01.12.2021 | ||
RS | 01.12.2021 | ||
BG | 01.03.2022 | ||
Former [2022/22] | AT | 01.12.2021 | |
FI | 01.12.2021 | ||
LT | 01.12.2021 | ||
RS | 01.12.2021 | ||
BG | 01.03.2022 | ||
Former [2022/21] | AT | 01.12.2021 | |
RS | 01.12.2021 | ||
BG | 01.03.2022 | ||
Former [2022/19] | BG | 01.03.2022 | Documents cited: | Search | [XI]US4913489 (MARTIN GERARD [FR]) [X] 1-10,12-14 * the whole document * [I] 11; | [X]US2006249616 (FRANTZ WALTER F [US], et al) [X] 1-4,6-10,12-14 * figures 9,14 *; | [XI]US2010096502 (VANDERWOLK JONATHAN [US]) [X] 1-10,12-14 * figure 6 * [I] 11; | [X]EP3296206 (THK CO LTD [JP]) [X] 1-4,6-10,14* figures 3,4 * |