blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3643152

EP3643152 - TRACTOR CONTROL SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.04.2022
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  30.04.2021
FormerGrant of patent is intended
Status updated on  17.01.2021
FormerRequest for examination was made
Status updated on  06.11.2020
FormerThe application has been published
Status updated on  27.03.2020
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
AGCO International GmbH
Victor von Bruns-Strasse 17
8212 Neuhausen am Rheinfall / CH
[2020/18]
Inventor(s)01 / PICHLMAIER, Benno
AGCO GmbH
Johann-Georg-Fendt Strasse 4
87616 Marktoberdorf / DE
 [2020/18]
Representative(s)AGCO Intellectual Property Department
AGCO Limited
Abbey Park Stoneleigh
Kenilworth CV8 2TQ / GB
[N/P]
Former [2020/18]AGCO Intellectual Property Department
AGCO Limited
Abbey Park Stoneleigh
Kenilworth, Warwickshire CV8 2TQ / GB
Application number, filing date19206124.026.06.2012
[2020/18]
Priority number, dateGB2011001256822.07.2011         Original published format: GB 201112568
[2020/18]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3643152
Date:29.04.2020
Language:EN
[2020/18]
Type: B1 Patent specification 
No.:EP3643152
Date:02.06.2021
Language:EN
[2021/22]
Search report(s)(Supplementary) European search report - dispatched on:EP30.03.2020
ClassificationIPC:A01B63/14, A01B63/112, B62D49/06
[2020/18]
CPC:
A01B63/112 (EP,US); A01B63/10 (US); A01B63/14 (EP,US);
B62D49/0628 (EP,US); G01G1/00 (US); G01G19/08 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/50]
Former [2020/18]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:STEUERSYSTEM FÜR EINEN TRAKTOR[2020/18]
English:TRACTOR CONTROL SYSTEM[2020/18]
French:SYSTÈME DE COMMANDE DE TRACTEUR[2020/18]
Examination procedure29.10.2020Examination requested  [2020/50]
29.10.2020Date on which the examining division has become responsible
18.01.2021Communication of intention to grant the patent
21.04.2021Fee for grant paid
21.04.2021Fee for publishing/printing paid
21.04.2021Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP12729979.0  / EP2734027
Opposition(s)03.03.2022No opposition filed within time limit [2022/19]
Fees paidRenewal fee
30.10.2019Renewal fee patent year 03
30.10.2019Renewal fee patent year 04
30.10.2019Renewal fee patent year 05
30.10.2019Renewal fee patent year 06
30.10.2019Renewal fee patent year 07
30.10.2019Renewal fee patent year 08
29.06.2020Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU26.06.2012
AL02.06.2021
AT02.06.2021
CY02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
MK02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
TR02.06.2021
IE26.06.2021
LU26.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
[2024/29]
Former [2024/23]HU26.06.2012
AL02.06.2021
AT02.06.2021
CY02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
MK02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
IE26.06.2021
LU26.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
Former [2023/33]HU26.06.2012
AL02.06.2021
AT02.06.2021
CY02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
IE26.06.2021
LU26.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
Former [2023/24]AL02.06.2021
AT02.06.2021
CY02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
IE26.06.2021
LU26.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/36]AL02.06.2021
AT02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
IE26.06.2021
LU26.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/34]AL02.06.2021
AT02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
IE26.06.2021
LU26.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/29]AL02.06.2021
AT02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
IE26.06.2021
LU26.06.2021
CH30.06.2021
LI30.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/26]AL02.06.2021
AT02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SK02.06.2021
SM02.06.2021
IE26.06.2021
LU26.06.2021
CH30.06.2021
LI30.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/21]AT02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SK02.06.2021
SM02.06.2021
IE26.06.2021
LU26.06.2021
CH30.06.2021
LI30.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/18]AT02.06.2021
CZ02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SK02.06.2021
SM02.06.2021
LU26.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/11]AT02.06.2021
CZ02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/09]AT02.06.2021
CZ02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
PT04.10.2021
Former [2022/08]AT02.06.2021
CZ02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
NL02.06.2021
PL02.06.2021
RS02.06.2021
SE02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
Former [2022/07]AT02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
NL02.06.2021
PL02.06.2021
RS02.06.2021
SE02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
Former [2021/52]FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
PL02.06.2021
RS02.06.2021
SE02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
Former [2021/51]FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
RS02.06.2021
SE02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
Former [2021/49]FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
SE02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
Former [2021/47]FI02.06.2021
LT02.06.2021
BG02.09.2021
Former [2021/46]FI02.06.2021
LT02.06.2021
Documents cited:Search[A]DE2910180  (FENDT & CO XAVER) [A] 1 * figures 1-2; claim 1 * * page 6 - page 10 *;
 [A]WO8201354  (MASSEY FERGUSON SERVICES NV [NL]) [A] 1 * abstract * * page 1, line 3 - line 7 * * tables I,II,III * * page 9, line 17 - page 10, line 10 * * page 24, line 7 - line 34 *;
 [A]US4846283  (BATCHELLER BARRY D [US], et al) [A] 1 * abstract * * column 5 - column 10 *;
 [A]US5629874  (MITTAL CHANDER P [US]) [A] 1* abstract *;
 [A]WO0034060  (CASE CORP [US]) [A] 1 * abstract *;
 [A]EP1825734  (CLAAS SELBSTFAHR ERNTEMASCH [DE]) [A] 1 * abstract * * paragraph [0001] * * paragraph [0006] * * paragraph [0008] * * paragraph [0012] * * paragraph [0015] *;
 [A]EP1889531  (CNH ITALIA SPA [IT]) [A] 1 * abstract * * paragraph [0025] - paragraph [0043] *;
 [A]WO2011033015  (AGCO GMBH [DE], et al) [A] 1 * abstract *
by applicantUS1017368
 GB911309
 GB922016
 GB1016662
 GB1016661
 GB1021928
 GB1021929
 GB1021931
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.