EP3660221 - BUILDING ELEMENT AND CONSTRUCTION [Right-click to bookmark this link] | |||
Former [2020/23] | BUILDING ELEMENT AND CONSTRUCTION | ||
[2022/12] | Status | No opposition filed within time limit Status updated on 04.08.2023 Database last updated on 31.05.2024 | |
Former | The patent has been granted Status updated on 26.08.2022 | ||
Former | Grant of patent is intended Status updated on 08.08.2022 | ||
Former | Request for examination was made Status updated on 27.06.2022 | ||
Former | Grant of patent is intended Status updated on 21.03.2022 | ||
Former | Request for examination was made Status updated on 11.12.2020 | ||
Former | The application has been published Status updated on 01.05.2020 | Most recent event Tooltip | 31.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 03.07.2024 [2024/27] | Applicant(s) | For all designated states z-part GmbH Aarbergstrasse 42 3272 Walperswil / CH | [2020/23] | Inventor(s) | 01 /
Züger, Dominik Gimmizstrasse 2 3272 Walperswil / CH | [2020/23] | Representative(s) | BOVARD AG Patent- und Markenanwälte Optingenstrasse 16 3013 Bern / CH | [2020/23] | Application number, filing date | 19206695.9 | 01.11.2019 | [2020/23] | Priority number, date | CH20180001464 | 27.11.2018 Original published format: CH 14642018 | [2020/23] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3660221 | Date: | 03.06.2020 | Language: | DE | [2020/23] | Type: | B1 Patent specification | No.: | EP3660221 | Date: | 28.09.2022 | Language: | DE | [2022/39] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 22.04.2020 | Classification | IPC: | E02D33/00, E02D27/50, E02D7/22 | [2020/23] | CPC: |
E02D33/00 (EP);
E02D5/02 (CH);
E02D27/50 (EP);
E02D5/80 (CH);
E02D7/22 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/02] |
Former [2020/23] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | BAUWERKELEMENT UND BAUWERK | [2020/23] | English: | BUILDING ELEMENT AND CONSTRUCTION | [2022/15] | French: | ÉLÉMENT DE CONSTRUCTION ET CONSTRUCTION | [2020/23] |
Former [2020/23] | BUILDING ELEMENT AND CONSTRUCTION | Examination procedure | 03.12.2020 | Amendment by applicant (claims and/or description) | 03.12.2020 | Examination requested [2021/02] | 03.12.2020 | Date on which the examining division has become responsible | 22.03.2022 | Communication of intention to grant the patent | 22.06.2022 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 22.06.2022 | Fee for grant paid | 22.06.2022 | Fee for publishing/printing paid | 09.08.2022 | Communication of intention to grant the patent | 22.08.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 29.06.2023 | No opposition filed within time limit [2023/36] | Fees paid | Renewal fee | 26.11.2021 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.11.2019 | AL | 28.09.2022 | CY | 28.09.2022 | CZ | 28.09.2022 | EE | 28.09.2022 | ES | 28.09.2022 | FI | 28.09.2022 | HR | 28.09.2022 | IT | 28.09.2022 | LT | 28.09.2022 | LV | 28.09.2022 | MC | 28.09.2022 | MK | 28.09.2022 | PL | 28.09.2022 | RO | 28.09.2022 | RS | 28.09.2022 | SI | 28.09.2022 | SK | 28.09.2022 | SM | 28.09.2022 | IE | 01.11.2022 | LU | 01.11.2022 | BE | 30.11.2022 | GR | 29.12.2022 | IS | 28.01.2023 | PT | 30.01.2023 | [2024/27] |
Former [2024/26] | HU | 01.11.2019 | |
AL | 28.09.2022 | ||
CY | 28.09.2022 | ||
CZ | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
IT | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SI | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
IE | 01.11.2022 | ||
LU | 01.11.2022 | ||
BE | 30.11.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2024/21] | HU | 01.11.2019 | |
AL | 28.09.2022 | ||
CY | 28.09.2022 | ||
CZ | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SI | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
IE | 01.11.2022 | ||
LU | 01.11.2022 | ||
BE | 30.11.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2024/18] | HU | 01.11.2019 | |
AL | 28.09.2022 | ||
CZ | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SI | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
IE | 01.11.2022 | ||
LU | 01.11.2022 | ||
BE | 30.11.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/51] | AL | 28.09.2022 | |
CZ | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SI | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
IE | 01.11.2022 | ||
LU | 01.11.2022 | ||
BE | 30.11.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/49] | AL | 28.09.2022 | |
CZ | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
IE | 01.11.2022 | ||
LU | 01.11.2022 | ||
BE | 30.11.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/48] | AL | 28.09.2022 | |
CZ | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
IE | 01.11.2022 | ||
LU | 01.11.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/37] | AL | 28.09.2022 | |
CZ | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
LU | 01.11.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/31] | AL | 28.09.2022 | |
CZ | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/29] | AL | 28.09.2022 | |
CZ | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/26] | CZ | 28.09.2022 | |
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/23] | CZ | 28.09.2022 | |
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
GR | 29.12.2022 | ||
PT | 30.01.2023 | ||
Former [2023/22] | CZ | 28.09.2022 | |
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SM | 28.09.2022 | ||
GR | 29.12.2022 | ||
PT | 30.01.2023 | ||
Former [2023/20] | FI | 28.09.2022 | |
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
RS | 28.09.2022 | ||
SM | 28.09.2022 | ||
GR | 29.12.2022 | ||
Former [2023/10] | FI | 28.09.2022 | |
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
RS | 28.09.2022 | ||
GR | 29.12.2022 | ||
Former [2023/09] | FI | 28.09.2022 | |
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
RS | 28.09.2022 | ||
Former [2023/08] | FI | 28.09.2022 | |
LT | 28.09.2022 | ||
RS | 28.09.2022 | Documents cited: | Search | [YA]JP2006219829 (SUMITOMO DENKO STEEL WIRE KK, et al) [Y] 5,10,11 * figures 1-10 *[A] 1; | [YA]WO2007014013 (STROYER BEN [US]) [Y] 8,9,11-14 * abstract * [A] 7; | [XAYI]WO2008002308 (TIMMERMAN JAMES E [US]) [X] 1-3,6,15 * page 1, lines 1-6 * * page 13, line 27 - page 28, line 15; figures 1,2,5,24 * [A] 4,8,9,13,14 [Y] 5,10-12 [I] 7; | [XAYI]DE102015104395 (BEHRENS CHRISTINA [DE], et al) [X] 1-4,15 * abstract * * paragraphs [0006] , [0011] , [0027] , [0028]; figures 1-4 * [A] 5,6,10 [Y] 8,9,11-14 [I] 7; | [XI]KR20180094548 (USHINPEOPLE INC [KR]) [X] 1,8,15 * the whole document * [I] 9-11 |