EP3654462 - LASER SOURCE WITH SEMICONDUCTOR AND TRANSMISSION METHOD WITH SAID LASER SOURCE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.07.2022 Database last updated on 28.06.2024 | |
Former | The patent has been granted Status updated on 13.08.2021 | ||
Former | Grant of patent is intended Status updated on 27.04.2021 | ||
Former | Request for examination was made Status updated on 17.04.2020 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Commissariat à l'Énergie Atomique et aux Énergies Alternatives Bâtiment "Le Ponant D" 25, rue Leblanc 75015 Paris / FR | [2020/21] | Inventor(s) | 01 /
WILMART, Quentin c/o CEA GRENOBLE 17, rue des Martyrs 38054 GRENOBLE cedex 09 / FR | 02 /
HASSAN, Karim c/o CEA GRENOBLE 17, rue des Martyrs 38054 GRENOBLE cedex 09 / FR | [2020/21] | Representative(s) | Colombo, Michel Innovation Competence Group 310, avenue Berthelot 69372 Lyon Cedex 08 / FR | [2020/21] | Application number, filing date | 19207661.0 | 07.11.2019 | [2020/21] | Priority number, date | FR20180060520 | 15.11.2018 Original published format: FR 1860520 | [2020/21] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP3654462 | Date: | 20.05.2020 | Language: | FR | [2020/21] | Type: | B1 Patent specification | No.: | EP3654462 | Date: | 15.09.2021 | Language: | FR | [2021/37] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 22.04.2020 | Classification | IPC: | H01S3/07, H01S5/02, H01S5/026, H01S5/065, H01S5/10, H01S5/125, H01S5/14 | [2020/21] | CPC: |
H01S5/021 (EP);
H01S5/141 (EP,US);
G02F1/2257 (US);
H01S3/07 (EP);
H01S5/026 (EP,US);
H01S5/0654 (EP);
H01S5/1007 (EP,US);
H01S5/1028 (US);
H01S5/1032 (EP);
H01S5/125 (EP,US);
H01S5/2031 (US);
H01S5/3013 (US);
H01S5/5045 (US);
G02F1/212 (US);
G02F2201/06 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/21] | Title | German: | LASERQUELLE MIT HALBLEITER UND EMISSIONSVERFAHREN MIT DIESER LASERQUELLE | [2020/21] | English: | LASER SOURCE WITH SEMICONDUCTOR AND TRANSMISSION METHOD WITH SAID LASER SOURCE | [2020/21] | French: | SOURCE LASER A SEMI-CONDUCTEUR ET PROCEDE D'EMISSION AVEC CETTE SOURCE LASER | [2020/21] | Examination procedure | 07.11.2019 | Examination requested [2020/21] | 28.04.2021 | Communication of intention to grant the patent | 09.08.2021 | Fee for grant paid | 09.08.2021 | Fee for publishing/printing paid | 09.08.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 16.06.2022 | No opposition filed within time limit [2022/34] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.11.2019 | AL | 15.09.2021 | AT | 15.09.2021 | CY | 15.09.2021 | CZ | 15.09.2021 | DK | 15.09.2021 | EE | 15.09.2021 | ES | 15.09.2021 | FI | 15.09.2021 | HR | 15.09.2021 | IT | 15.09.2021 | LT | 15.09.2021 | LV | 15.09.2021 | MC | 15.09.2021 | MK | 15.09.2021 | NL | 15.09.2021 | PL | 15.09.2021 | RO | 15.09.2021 | RS | 15.09.2021 | SE | 15.09.2021 | SI | 15.09.2021 | SK | 15.09.2021 | SM | 15.09.2021 | IE | 07.11.2021 | LU | 07.11.2021 | BE | 30.11.2021 | BG | 15.12.2021 | NO | 15.12.2021 | GR | 16.12.2021 | IS | 15.01.2022 | PT | 17.01.2022 | [2024/23] |
Former [2023/33] | HU | 07.11.2019 | |
AL | 15.09.2021 | ||
AT | 15.09.2021 | ||
CY | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
IE | 07.11.2021 | ||
LU | 07.11.2021 | ||
BE | 30.11.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2023/30] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CY | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
IE | 07.11.2021 | ||
LU | 07.11.2021 | ||
BE | 30.11.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2023/10] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
IE | 07.11.2021 | ||
LU | 07.11.2021 | ||
BE | 30.11.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/48] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
IE | 07.11.2021 | ||
LU | 07.11.2021 | ||
BE | 30.11.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/36] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
LU | 07.11.2021 | ||
BE | 30.11.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/34] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
LU | 07.11.2021 | ||
BE | 30.11.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/33] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BE | 30.11.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/29] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/25] | AT | 15.09.2021 | |
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/24] | AT | 15.09.2021 | |
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/23] | AT | 15.09.2021 | |
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
PL | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
PT | 17.01.2022 | ||
Former [2022/21] | AT | 15.09.2021 | |
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
Former [2022/10] | FI | 15.09.2021 | |
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
Former [2022/09] | FI | 15.09.2021 | |
LT | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
Former [2022/08] | FI | 15.09.2021 | |
LT | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
Former [2022/07] | LT | 15.09.2021 | |
NO | 15.12.2021 | Documents cited: | Search | [AD]US2014254617 (OH KWANG RYONG [KR]) [AD] 1-10 * abstract * * paragraph [0078] *; | [AD]US2003123784 (MUKAI KOHKI [JP]) [AD] 1-10 * abstract *; | [AD]CN103368678B (UNIV SHANGHAI JIAOTONG) [AD] 1-10 * abstract *; | [AD]US2016301191 (ORCUTT JASON S [US]) [AD] 1-10 * abstract * * paragraph [0086] *; | [AD]US2012057079 (DALLESASSE JOHN [US], et al) [AD] 1-10 * abstract * * paragraph [0081] *; | [AD]WO2007107187 (PIRELLI & C SPA [IT], et al) [AD] 1-10 * abstract * | by applicant | US2018261976 | US2014254617 | US2003123784 | CN103368678 | US2016301191 | US2012057079 | WO2007107187 | - AMNON YARIV et al., "Supermode Si/lll-V hybrid Lasers, optical amplifiers and modulators: proposai and analysis", Optics Express, (20070723), vol. 14, no. 15, page 9147 | - DIMITRIS FITSIOS et al., "High-gain 1,3 pm GalnNAs semiconductor optical amplifier with enchanced temperature stability for all-optical processing at 10 Gb/s", Applied optics, (20150101), vol. 54, no. l | - BISWAJEET GUHA, "Minimizing temperature sensitivity of silicon Mach-Zehnder interferometers", Optics Express, (20100115), pages 1879 - 1887 | - BISWAJEET GUHA, "CMOS-compatible athermal silicon microring resonators", Optics Express, (20100203), pages 3487 - 3493 | - G. H. DUAN et al., "Hybrid III-V on Silicon Lasers for Photonic Integrated Circuits on Silicon", Journal of Selected Topics in Quantum Electronics, (20140700), vol. 20, no. 4, doi:10.1109/JSTQE.2013.2296752, pages 1 - 13, XP011539407 DOI: http://dx.doi.org/10.1109/JSTQE.2013.2296752 |