blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3653465

EP3653465 - METHOD AND SYSTEM FOR HEALTH ASSESSMENT OF A TRACK CIRCUIT AND/OR OF A TRACK SECTION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  25.02.2022
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  19.03.2021
FormerGrant of patent is intended
Status updated on  30.11.2020
FormerRequest for examination was made
Status updated on  15.05.2020
FormerThe application has been published
Status updated on  17.04.2020
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
ALSTOM Transport Technologies
48, rue Albert Dhalenne
93400 Saint-Ouen / FR
[2020/21]
Inventor(s)01 / QIN, Song
945 Ekana Green Ct
Oviedo, FL 32765 / US
02 / MIJATOVIC, Nenad
700 S. Babcock Street
Melbourne, FL 32901 / US
03 / FRIES, Jeffrey
2712 South Dillingham Rd
Grain Valley, MO 64029 / US
 [2021/16]
Former [2020/21]01 / QIN, Song
945 Ekana Green Ct
OVIEDO, FL 32765 / US
02 / MIJATOVIC, Nenad
700 S. Babcock Street
MELBOURNE, FL 32901 / US
03 / FRIES, Jeffrey
2712 South Dillingham Rd
GRAIN VALLEY, MO 64029 / US
Representative(s)Lavoix
2, place d'Estienne d'Orves
75441 Paris Cedex 09 / FR
[2020/21]
Application number, filing date19209320.115.11.2019
[2020/21]
Priority number, dateUS20181619344416.11.2018         Original published format: US201816193444
[2020/21]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3653465
Date:20.05.2020
Language:EN
[2020/21]
Type: B1 Patent specification 
No.:EP3653465
Date:21.04.2021
Language:EN
[2021/16]
Search report(s)(Supplementary) European search report - dispatched on:EP03.04.2020
ClassificationIPC:B61L1/18, B61L1/20, G06K9/62
[2020/21]
CPC:
B61L1/18 (EP,US); E01B35/06 (BR); B61K9/08 (US);
B61L1/185 (EP); B61L1/186 (EP); B61L1/187 (EP);
B61L1/188 (EP); B61L1/20 (EP); G01B7/34 (BR);
G01R31/50 (US); G06F18/23213 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/25]
Former [2020/21]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN UND SYSTEM ZUR ZUSTANDSBEWERTUNG EINES GLEISKREISES UND/ODER EINES GLEISABSCHNITTS[2020/21]
English:METHOD AND SYSTEM FOR HEALTH ASSESSMENT OF A TRACK CIRCUIT AND/OR OF A TRACK SECTION[2020/21]
French:PROCÉDÉ ET SYSTÈME POUR L'ÉVALUATION DE L'ÉTAT D'UN CIRCUIT DE VOIE ET/OU D'UN TRONÇON DE VOIE[2020/21]
Examination procedure13.05.2020Examination requested  [2020/25]
13.05.2020Date on which the examining division has become responsible
28.09.2020Amendment by applicant (claims and/or description)
01.12.2020Communication of intention to grant the patent
15.03.2021Fee for grant paid
15.03.2021Fee for publishing/printing paid
15.03.2021Receipt of the translation of the claim(s)
Opposition(s)24.01.2022No opposition filed within time limit [2022/13]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.11.2019
AL21.04.2021
AT21.04.2021
CY21.04.2021
CZ21.04.2021
DK21.04.2021
EE21.04.2021
FI21.04.2021
HR21.04.2021
LT21.04.2021
LV21.04.2021
MC21.04.2021
MK21.04.2021
MT21.04.2021
NL21.04.2021
PL21.04.2021
RO21.04.2021
RS21.04.2021
SI21.04.2021
SK21.04.2021
SM21.04.2021
BG21.07.2021
NO21.07.2021
GR22.07.2021
IS21.08.2021
PT23.08.2021
IE15.11.2021
LU15.11.2021
[2024/42]
Former [2024/23]HU15.11.2019
AL21.04.2021
AT21.04.2021
CY21.04.2021
CZ21.04.2021
DK21.04.2021
EE21.04.2021
FI21.04.2021
HR21.04.2021
LT21.04.2021
LV21.04.2021
MC21.04.2021
MK21.04.2021
NL21.04.2021
PL21.04.2021
RO21.04.2021
RS21.04.2021
SI21.04.2021
SK21.04.2021
SM21.04.2021
BG21.07.2021
NO21.07.2021
GR22.07.2021
IS21.08.2021
PT23.08.2021
IE15.11.2021
LU15.11.2021
Former [2023/33]HU15.11.2019
AL21.04.2021
AT21.04.2021
CY21.04.2021
CZ21.04.2021
DK21.04.2021
EE21.04.2021
FI21.04.2021
HR21.04.2021
LT21.04.2021
LV21.04.2021
MC21.04.2021
NL21.04.2021
PL21.04.2021
RO21.04.2021
RS21.04.2021
SI21.04.2021
SK21.04.2021
SM21.04.2021
BG21.07.2021
NO21.07.2021
GR22.07.2021
IS21.08.2021
PT23.08.2021
IE15.11.2021
LU15.11.2021
Former [2023/30]AL21.04.2021
AT21.04.2021
CY21.04.2021
CZ21.04.2021
DK21.04.2021
EE21.04.2021
FI21.04.2021
HR21.04.2021
LT21.04.2021
LV21.04.2021
MC21.04.2021
NL21.04.2021
PL21.04.2021
RO21.04.2021
RS21.04.2021
SI21.04.2021
SK21.04.2021
SM21.04.2021
BG21.07.2021
NO21.07.2021
GR22.07.2021
IS21.08.2021
PT23.08.2021
IE15.11.2021
LU15.11.2021
Former [2022/48]AL21.04.2021
AT21.04.2021
CZ21.04.2021
DK21.04.2021
EE21.04.2021
FI21.04.2021
HR21.04.2021
LT21.04.2021
LV21.04.2021
MC21.04.2021
NL21.04.2021
PL21.04.2021
RO21.04.2021
RS21.04.2021
SI21.04.2021
SK21.04.2021
SM21.04.2021
BG21.07.2021
NO21.07.2021
GR22.07.2021
IS21.08.2021
PT23.08.2021
IE15.11.2021
LU15.11.2021
Former [2022/34]AL21.04.2021
AT21.04.2021
CZ21.04.2021
DK21.04.2021
EE21.04.2021
FI21.04.2021
HR21.04.2021
LT21.04.2021
LV21.04.2021
MC21.04.2021
NL21.04.2021
PL21.04.2021
RO21.04.2021
RS21.04.2021
SI21.04.2021
SK21.04.2021
SM21.04.2021
BG21.07.2021
NO21.07.2021
GR22.07.2021
IS21.08.2021
PT23.08.2021
LU15.11.2021
Former [2022/33]AL21.04.2021
AT21.04.2021
CZ21.04.2021
DK21.04.2021
EE21.04.2021
FI21.04.2021
HR21.04.2021
LT21.04.2021
LV21.04.2021
MC21.04.2021
NL21.04.2021
PL21.04.2021
RO21.04.2021
RS21.04.2021
SI21.04.2021
SK21.04.2021
SM21.04.2021
BG21.07.2021
NO21.07.2021
GR22.07.2021
IS21.08.2021
PT23.08.2021
Former [2022/29]AL21.04.2021
AT21.04.2021
CZ21.04.2021
DK21.04.2021
EE21.04.2021
FI21.04.2021
HR21.04.2021
LT21.04.2021
LV21.04.2021
NL21.04.2021
PL21.04.2021
RO21.04.2021
RS21.04.2021
SI21.04.2021
SK21.04.2021
SM21.04.2021
BG21.07.2021
NO21.07.2021
GR22.07.2021
IS21.08.2021
PT23.08.2021
Former [2022/26]AL21.04.2021
AT21.04.2021
CZ21.04.2021
DK21.04.2021
EE21.04.2021
FI21.04.2021
HR21.04.2021
LT21.04.2021
LV21.04.2021
NL21.04.2021
PL21.04.2021
RO21.04.2021
RS21.04.2021
SK21.04.2021
SM21.04.2021
BG21.07.2021
NO21.07.2021
GR22.07.2021
IS21.08.2021
PT23.08.2021
Former [2022/23]AT21.04.2021
CZ21.04.2021
DK21.04.2021
EE21.04.2021
FI21.04.2021
HR21.04.2021
LT21.04.2021
LV21.04.2021
NL21.04.2021
PL21.04.2021
RO21.04.2021
RS21.04.2021
SK21.04.2021
SM21.04.2021
BG21.07.2021
NO21.07.2021
GR22.07.2021
IS21.08.2021
PT23.08.2021
Former [2022/10]AT21.04.2021
CZ21.04.2021
DK21.04.2021
EE21.04.2021
FI21.04.2021
HR21.04.2021
LT21.04.2021
LV21.04.2021
NL21.04.2021
PL21.04.2021
RO21.04.2021
RS21.04.2021
SK21.04.2021
SM21.04.2021
BG21.07.2021
NO21.07.2021
GR22.07.2021
PT23.08.2021
IS22.12.2021
Former [2022/09]AT21.04.2021
CZ21.04.2021
DK21.04.2021
FI21.04.2021
HR21.04.2021
LT21.04.2021
LV21.04.2021
NL21.04.2021
PL21.04.2021
RO21.04.2021
RS21.04.2021
SK21.04.2021
SM21.04.2021
BG21.07.2021
NO21.07.2021
GR22.07.2021
IS21.08.2021
PT23.08.2021
Former [2022/08]AT21.04.2021
CZ21.04.2021
DK21.04.2021
FI21.04.2021
HR21.04.2021
LT21.04.2021
LV21.04.2021
NL21.04.2021
PL21.04.2021
RS21.04.2021
SM21.04.2021
BG21.07.2021
NO21.07.2021
GR22.07.2021
IS21.08.2021
PT23.08.2021
Former [2022/07]AT21.04.2021
FI21.04.2021
HR21.04.2021
LT21.04.2021
LV21.04.2021
NL21.04.2021
PL21.04.2021
RS21.04.2021
SM21.04.2021
BG21.07.2021
NO21.07.2021
GR22.07.2021
IS21.08.2021
PT23.08.2021
Former [2021/52]AT21.04.2021
FI21.04.2021
HR21.04.2021
LT21.04.2021
LV21.04.2021
NL21.04.2021
PL21.04.2021
RS21.04.2021
BG21.07.2021
NO21.07.2021
GR22.07.2021
IS21.08.2021
PT23.08.2021
Former [2021/51]AT21.04.2021
FI21.04.2021
HR21.04.2021
LT21.04.2021
LV21.04.2021
NL21.04.2021
RS21.04.2021
BG21.07.2021
NO21.07.2021
GR22.07.2021
IS21.08.2021
PT23.08.2021
Former [2021/50]AT21.04.2021
FI21.04.2021
HR21.04.2021
LT21.04.2021
LV21.04.2021
NL21.04.2021
BG21.07.2021
NO21.07.2021
GR22.07.2021
PT23.08.2021
Former [2021/49]AT21.04.2021
FI21.04.2021
HR21.04.2021
LT21.04.2021
LV21.04.2021
NL21.04.2021
BG21.07.2021
NO21.07.2021
GR22.07.2021
Former [2021/47]AT21.04.2021
FI21.04.2021
LT21.04.2021
NL21.04.2021
BG21.07.2021
Former [2021/46]AT21.04.2021
FI21.04.2021
LT21.04.2021
Documents cited:Search[A]WO2008052643  (SIEMENS SCHWEIZ AG [CH], et al) [A] 1-13 * figures 1 and 2; page 2, 4th paragraph; page 5, last plain paragraph; and the paragraph bridging pages 5 and 6 *;
 [A]WO2017197423  (MAT CENTER LEOBEN FORSCHUNG GMBH [AT]) [A] 1-13 * figure 1; page 10, line 26 - page 11, line 34 *;
 [A]WO2018050502  (SIEMENS AG [DE]) [A] 1-13* page 2, line 10 - page 3, line 15; and page 4, line 9 - page 5, line 35 *;
 [A]CN108099952  (BEIJING NAT RAILWAY RES & DESIGN INST SIGNAL & COMMUNICATION LTD) [A] 1-13 * figures 1 and 2; paragraphs [0006], [0007], [0010], [0029] and [0032] *;
 [A]  - W P Verbeek, "Delft Center for Systems and Control Condition monitoring for track circuits A multiple-model approach", Thesis, Delft, TU Delft, (20150928), pages 1 - 101, XP055678442 [A] 1-13 * figures 2-1, 5-4 and 5-5; sections 1-2, 2-1-1 and 5-6 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.